Request for Proposals # 840452
, wall and roofing panels
Supply wall and roofing panels
| Archived | "Firma ORGRES" OAO | 21.06.2017 10:59 |
Request for Proposals # 840419
reinforcing steel
delivery of reinforcing steel
| Archived | "Firma ORGRES" OAO | 16.06.2017 10:31 |
Request for Proposals # 837828
delivery of metal structures of buildings
delivery of metal structures of buildings
| Archived | "Firma ORGRES" OAO | 13.06.2017 20:10 |
Request for Proposals # 837804
a brick Supply
ordinary solid bricks/1NF/250х120х65 100/2.0/50
| Archived | "Firma ORGRES" OAO | 09.06.2017 16:24 |
Request for Proposals # 837807
the supply of reinforced concrete floor slabs
the supply of reinforced concrete floor slabs
| Archived | "Firma ORGRES" OAO | 09.06.2017 16:19 |
Request for Proposals # 834378
slabs PDN
the supply of Tin plates PDN (series 3.503.1-91)
| Archived | "Firma ORGRES" OAO | 05.06.2017 18:07 |
Request for Proposals # 577709
... Expand
Agreement No. 2014.108.011. Upgrade of the speed controller and the equipment of oil pressure units at Hydroelectric Units No. 1, 2, HPP-8, Cascade of Pazskye HPPs, Kolsky Branch of OAO TGC-1. Murmansk Region, Pechenegsky District, Borisoglebsky Settlemen
In accordance with the specifications Collapse
| Archived | "Firma ORGRES" OAO | 17.11.2015 11:55 |
Request for Proposals # 571177
Precision air conditioner of cabinet-type, produced by RC GROUP
According to the statement of work.
| Archived | "Firma ORGRES" OAO | 26.10.2015 16:30 |
Request for Proposals # 559825
Supply of segments with elastic with plastic coating for axial bearings of hydrogenerators.
According to permits, licenses, approvals.
| Archived | "Firma ORGRES" OAO | 22.09.2015 13:05 |
Request for Proposals # 548121
Supply of 16 MW gas boiler station at OAO Ryazansky Radiozavod (Ryazan Radio Manufacturing Plant)
In accordance with detailed design
| Archived | "Firma ORGRES" OAO | 18.08.2015 08:30 |
Request for Proposals # 546098
Supply of window units for equipping 16 MW gas boiler station at OAO Ryazansky Radiozavod (Ryazan Radio Manufacturing Plant)
In accordance with detailed design
| Archived | "Firma ORGRES" OAO | 12.08.2015 11:00 |
Request for Proposals # 546104
Supply of door units for equipping 16 MW gas boiler station at OAO Ryazansky Radiozavod (Ryazan Radio Manufacturing Plant)
In accordance with detailed design
| Archived | "Firma ORGRES" OAO | 12.08.2015 11:00 |
Request for Proposals # 545870
Supply of wall and roof panels for kitting of the facility: "Gas boiler house with capacity of 16 MW on the territory of OAO Ryazan Radio Plant."
According to permits, licenses, approvals.
| Archived | "Firma ORGRES" OAO | 12.08.2015 10:00 |
Request for Proposals # 518113
... Expand
Equipment for upgrade of oil-pressure installation of hydroelectric unit
It is required to develop the design documentation (assembly drawing, specifications), to complete the set of equipment, to produce, to supply and to install the equipment of the oil-pressure installation at Borisoglebskaya HPP, Murmansk Region. Collapse
| Archived | "Firma ORGRES" OAO | 09.06.2015 15:00 |
Request for Proposals # 470663
Supply motor drive to perform works on the project: Upgrade of Substation Peschanaya of Noyabrskye Electric Networks, a branch of OAO Tyumenenergo.
Motor automatic load tap changer MZ 4.1 in the amount of 2 pcs.
| Archived | "Firma ORGRES" OAO | 06.04.2015 16:01 |
Request for Proposals # 466719
... Expand
Works on construction of overhangs of 110 kV overhead lines to 110/35/10 Substation Samza and 35 kV Step-down substation for Urayskye Electric Networks, a branch of OAO Tyumenenergo.
Construction, installation, electrical installation work with execution of necessary documentation. Collapse
| Archived | "Firma ORGRES" OAO | 07.02.2015 17:05 |
Request for Proposals # 452143
Repair of 3 premises in the laboratory building of Central Immuno-virological Laboratory. Moscow Region, Sergeevo-Pasadsky District, Hotkovo ORGRES Settlement).
Repair of premises.
| Archived | "Firma ORGRES" OAO | 23.12.2014 12:02 |
Request for Proposals # 444009
... Expand
Supply of modular building for the substation control house and equipment for work to be performed under project: "Upgrade of Substation Peschanaya of Noyabrskye Electric Networks, a branch of OAO Tyumenenergo."
Modular building for substation control house Collapse
| Archived | "Firma ORGRES" OAO | 10.12.2014 12:00 |
Request for Proposals # 443063
... Expand
Supply of equipment MOXA for execution of work according to the project: "Construction of 110/35/10 Substation Samza and 35 kV step-down substation for the needs of Urayskie Electric Networks, a branch of OAO Tyumenenergo.
Equipment Moxa according to specification. Collapse
| Archived | "Firma ORGRES" OAO | 02.12.2014 14:00 |
Request for Proposals # 439948
... Expand
Supply of Drive RPN MZ-4.1 for execution of work eccording to the project: "Reconstruction of 110/6 kV Substation Kedr for the needs of Noyabrskie Electric Networks, a branch of OAO Tyumenenergo.
Drive RPN MZ-4.1. in quantity of 2 pcs (updated questionnaire). Collapse
| Archived | "Firma ORGRES" OAO | 28.11.2014 12:48 |