Request for Quotations # 1116795
delivery of reinforced concrete slabs of railway crossings
delivery of reinforced concrete slabs of railway crossings
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.10.2018 12:02 |
Request for Quotations # 1116453
Reconditioning repair of pump 1d 250-160 with replacement of impeller
Reconditioning repair of 1d 250-160 pump with replacement of impeller
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.10.2018 07:26 |
Request for Proposals # 1115541
... Expand
Contracting works on backfilling of № 7-8, № 8-9, № 9-10 and roadside of railway tracks № № 9.10 at the station East "Cut East" Ltd.
Contracting works on backfilling of № 7-8, № 8-9, № 9-10 and roadside of railway tracks № № 9.10 at the station East "Cut East" Ltd. Collapse
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.10.2018 07:11 |
Request for Quotations # 1115531
Supply of electrical products
Supply of electrical products
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.10.2018 07:06 |
Request for Quotations # 1116441
Supply of materials for repair of the contact network of the station east, OOO "cut East"
supply of materials for repair of the contact network of the station east, OOO "cut East"
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.10.2018 07:00 |
Request for Quotations # 1115517
The device of a wind shelter for a forsunite system of fine dispersion of water (fog)
the device of a wind shelter for a forsunite system of fine dispersion of water (fog)
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 27.10.2018 05:52 |
Request for Quotations # 1116439
Supply of materials for repair of the contact network of the station east, OOO "cut East"
supply of materials for repair of the contact network of the station east, OOO "cut East"
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 25.10.2018 06:59 |
Request for Quotations # 1111184
installation of the pressure pipeline from the pumping plant to the sewage treatment plants
installation of the pressure pipeline from the pumping unit of the № 1 quarry catchment for the treatment facilities of the quarry and sewage water.
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 24.10.2018 06:33 |
Request for Quotations # 1100512
... Expand
Development of forest development projects on the territory of quarry for mining of anthracite on the "cutting" section of the Kolyvanskogo Deposit LLC "section East"
development of forest development projects on the territory of quarry for anthracite mining on the "cutting" section of the Kolyvanskogo Deposit LLC "section East" Collapse
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 19.10.2018 07:24 |
Request for Quotations # 1102345
delivery of traverse and bases
Supply of Traverse TM-3 (10 PCs.) and Bases RV-3 (20 PCs.) for the Needs of LLC "section East"
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 19.10.2018 07:14 |
Request for Quotations # 1109724
Centering and balancing the fan installation of blowing cars
centering and balancing the fan installation of blowing cars
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 18.10.2018 09:39 |
Request for Quotations # 1108871
Supply of structured cable network switching equipment
Supply of structured cable network switching equipment
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 17.10.2018 10:39 |
Request for Quotations # 1105431
delivery of the car Uaz "patriot" pickup for the needs of LLC "section east"
delivery of the car Uaz "patriot" pickup for the needs of LLC "section east"
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 12.10.2018 13:06 |
Request for Quotations # 1104483
Centering and balancing the fan installation of blowing cars
centering and balancing the fan installation of blowing cars
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 10.10.2018 06:58 |
Request for Quotations # 1103775
Device of the wind shelter for the injection system of Melkodispersionnogo water spraying (fog)
wind shelter for injection system Melkodispersionnogo water spraying (fog)
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 10.10.2018 04:30 |
Request for Quotations # 1104482
repair of the excavator loading unit ash-11/75
repair of excavator ash-11/75 loading unit
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 09.10.2018 06:51 |
Request for Quotations # 1101732
... Expand
carrying out work on the lowering of the wells, with the implementation of the RTD complex by the contractors ' employees
carrying out work on the lowering of the wells, with the implementation of the NDP complex by the contractors ' employees Collapse
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 05.10.2018 05:35 |
Request for Proposals # 1100430
... Expand
execution of the complex of works on linear-instrumental reconciliation of Rotary drum of the anthracite preparation plant before loading.
execution of the complex of works on linear-instrumental reconciliation of Rotary drum of the anthracite preparation plant before loading. Collapse
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 04.10.2018 05:25 |
Request for Quotations # 1099314
Supply of excavator bucket anchor chains
supply of anchor sleds of the excavator bucket for the needs of LLC "section East"
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 03.10.2018 05:47 |
Request for Quotations # 1096756
installation of the pressure pipe from the pump unit to the sewage treatment plants
installation of the pressure piping from the pumping plant of the quarry water Collector № 1 to the treatment facilities of quarry and wastewater.
| Archived | \"RAZREZ VOSTOChNYI\" OOO | 30.09.2018 06:54 |