Request for Proposals # 3692183
Manufacturing and installation of a fire escape at the enterprise facility.
| Current | "ChZPSN-Profnasteel" OAO | 14.06.2024 12:00 |
Request for Proposals # 3691937
... Expand
Carrying out work on the examination of industrial safety of technical devices with the development of a technical device passport.
Requirements for the contractor:
1. It is mandatory to have a license from Rostechnadzor to carry out activities related to industrial safety expertise;
2. The contractor guarantees the high quality of the work performed, and also undertakes to involve only properly trained, specially trained personnel with sufficient qualifications;
3. Subcontracting organizations are not allowed;
4. Experience in conducting EPB is required.
Carrying out work on the examination of industrial safety of technical devices with the development of a technical device passport. Collapse
| Current | "ChZPSN-Profnasteel" OAO | 13.06.2024 18:00 |
Request for Proposals # 3687608
... Expand
Rendering of services for operation and maintenance of the gas consumption system, gas distribution system of the production site of LLC TEPLANT-YUG.
7. Hazardous production facility (OPO) of the Customer ("Gas consumption and gas distribution system") consists of:
- high-pressure gas pipeline from the tie-in point to GRPSh No. 1;
- GRPSh No. 1;
- medium pressure gas pipeline from GRPSh No. 1 to GRPSh No. 2;
- GRPSh No. 2;
- medium-pressure gas pipeline from GRPSh No. 2 to the entrance to the hot water boiler houses of the administrative and household building, the production building and the boiler house operating on the diathermic oil of the enterprise;
- hot water boiler room of the administrative building;
- hot water boiler room of the production building;
- boiler room operating on diathermic oil (the services include, among other things, maintenance of the supply and return pipeline of diathermic oil located within the boiler room).
Rendering of services for operation and maintenance of the gas consumption system, the gas distribution system of the production site of TEPLANT-YUG LLC. Collapse
| Current | "ChZPSN-Profnasteel" OAO | 12.06.2024 18:00 |
Request for Proposals # 3687914
Rendering of services to the GPO energy audit of the industrial enterprise "CHZPSN-Profiled flooring"
| Current | "ChZPSN-Profnasteel" OAO | 11.06.2024 12:00 |
Request for Proposals # 3679500
Replacement of the fire pipeline, downpipes to fire cranes and fire cranes with the installation of cabinets.
| Current | "ChZPSN-Profnasteel" OAO | 10.06.2024 15:00 |
Request for Proposals # 3683116
Work on the restoration of shafts with polyurethane coating
coating lines
Restoration of shafts with polyurethane coating.
| Archived | "ChZPSN-Profnasteel" OAO | 07.06.2024 15:00 |
Request for Proposals # 3679511
Repair of the heat network du400mm PJSC "CHZPSN-Profiled"
The section of the thermal network - The total length of the pipelines will be 545 m.p.
| Archived | "ChZPSN-Profnasteel" OAO | 06.06.2024 15:00 |
Request for Proposals # 3679503
Repair and maintenance of hardening baths.
To reconstruct the water supply system to the cooling nozzles of the sheet in the hardening baths No. 1,2 of the coating line, without replacing the water supply tanks
| Archived | "ChZPSN-Profnasteel" OAO | 06.06.2024 12:00 |
Request for Proposals # 3683214
... Expand
Provision of services for the collection, transportation and disposal of hazard class 4 waste at a special landfill.
Address of objects:
1. Volgograd region, Volzhsky, Alexandrova str., 51;
2. Volgograd region, Volzhsky, Alexandrova str., 63.
Provision of services for collection, transportation and disposal of waste of hazard class 4. Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 05.06.2024 18:00 |
Request for Proposals # 3675803
Overhaul of the Binns & Berry Trident L1000 lathe
| Archived | "ChZPSN-Profnasteel" OAO | 31.05.2024 16:00 |
Request for Proposals # 3675795
Reducers according to technical specifications. Consider the equivalents.
| Archived | "ChZPSN-Profnasteel" OAO | 29.05.2024 16:00 |
Request for Proposals # 3673727
... Expand
Performance of works on repair of a roof of plant management.
All materials and equipment for the execution of works are provided by the Contractor, except for the profile sheet and insulation.
1. Dismantling of the roof fence h-750 mm, with the preservation of materials - 60 m long;
2. Dismantling of the snegozadzhatel, with preservation of materials – 50 m long;
3. Dismantling of the existing steel corrugated roofing H75 on an area of 670 sq.m.;
4. Additional insulation of the attic floor with a semi-rigid mineral wadded slab (customer supply), h-100mm on an area of 600 sq. m
. 5. Installation of rafter protruding structures from channel 12 in the number of standard products 67 pieces and a total weight of 5.28 tons. (actual production drawings are issued by the customer after opening the roof);
6. Painting of m/structures;
7. Installation of a roof made of corrugated sheet H75 with replacement of the existing one by 50% (customer's delivery material);
8. Installation of the snow retention system;
9. Installation of roof fencing.
Warranty obligations: At least 60 months for completed works and materials.
Repair of the roof of the plant administration Samara, Krasnaya Glinka, 5th quarter, Electrical Panel-System Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 28.05.2024 12:00 |
Request for Proposals # 3669829
... Expand
Provision of maintenance services for Hitachi OSP55 M5ARN compressor.
Compressor room. Consists of three compressors:
Alup Largo 30-8 1pc
Alup Solo 30 1pc
Alup SCK42-8 2 pcs
Hitachi OSP55 M5ARN 1pc
As a result of inspection of the Hitachi OSP55 M5ARN compressor, the following was revealed:
1. Strong noise of electric motor bearings
2. The need for scheduled maintenance with replacement of oil separators.
3. Increased vibration and noise during compressor operation.
4. Destruction of the rubber damper of the compressor bed.
Provision of maintenance services for Hitachi OSP55 M5ARN compressor. Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 24.05.2024 06:00 |
Request for Proposals # 3667337
... Expand
1. Fan shaft:
• Drawing: TM 1918.00.000
• Quantity: 18 pcs.
• Material for manufacturing Steel 45
Shafts (Revolutions up to 3000 rpm) are used in the fan housing – the main part of the edge trimming unit on the mineral wool plate production line. With the help of this fan, crushed mineral wool products are transported, it has a large abrasive.
Fan shaft of the edge trim assembly Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 12:35 |
Request for Proposals # 3669412
... Expand
1. The KVO MVP-1 chain
• Material for manufacturing according to GOST 4543-2016,19281-2014;
• Quantity – 50m;
• Drawing: W6824APR;
It is used to transfer the mechanical power of mechanisms.
A reliable means of power transmission with high efficiency.
The assembled chain should have easy mobility of hinged
joints.
2. Lamellas KVO MVP-1
• Material for the manufacture of St3;
• Quantity – 130pcs;
• Drawing: MVP162-00.00;
The parts on the conveyor are subject to rapid wear due to the aggressive operating environment, these are temperature, friction, load. Therefore, a planned stop of the conveyor is envisaged to replace the components
with new ones
Cloaks of QUO, Chain of QUO Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 12:09 |
Request for Proposals # 3667331
... Expand
1. Shank 2-4 rolls:
• Material for manufacture: Steel 06H12NZD
• Drawing No.: CF-01.00.332;
• Quantity: 40 pcs.;
2. Shank of the 1st roll
• Material for manufacturing; Steel 06H12NZD
• Drawing No.: TM 2298.00.000;
• Quantity: 10 pcs.
3 . The Ring
• Material for manufacturing Steel 40X;
• Drawing No.: CF-01.00.310;
• Quantity: 16 pcs.
4. Graphite-fluoroplastic seal:
• Material for the manufacture of F4K20;
• Drawing No.: TM 1624.00.000;
• Quantity: 60 pcs
5. Support:
• Material for the manufacture of LS 59-1;
• Drawing No.: TM 01.00.201;
• Quantity: 40 pieces
Shank 2-4 rolls, Shank of the 1st roll, Graphite fluoroplastic seal, Ring, Support Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 12:00 |
Request for Proposals # 3667342
... Expand
1. Rear SKIP wheel:
• Drawing: RP 12219N.1-125SB
• Quantity: 2 pcs.
• Material for manufacturing Steel 3, paronite H1, Steel 45
2. The wheel on the SKIP front:
• Drawing: RP 12219N.1-115SB
• Quantity: 2 pcs.
• Material for manufacturing Steel 3,Steel 35,Sheet 18
SKIP wheel (rear,front) Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 12:00 |
Request for Proposals # 3665063
... Expand
Provision of services for pumping, transportation and cleaning of liquid household waste (LW).
1. The volume of the tank is 12 m3.
2. The number of tanks – 5 pcs.
3. The estimated number of bids for the export of concrete products per year: 5 pieces.
The customer has the right to change the number of services, in the direction of increase or decrease.
10. The bid is submitted on working days from 08:00 to 17:00 local time, with mandatory indication of the number of flights and the address of the facility by phone specified in the contract.
Provision of services for pumping, transportation and cleaning of liquid household waste. Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 10:00 |
Request for Proposals # 3669778
... Expand
Rendering of major repair services for the Renner RS 1-30 compressor.
Compressor room. Consists of three compressors:
Alup Largo 30-8 2pcs
Alup SCK-22 1pc
Renner RS1-30
As a result of inspection of the Renner RS 1-30 compressor, the following was revealed:
1. Strong noise of the bearings of the electric motor and the screw block.
2. The axial backlash of the rotor of the screw block is beyond the manufacturer's tolerance
3. Increased vibration when starting the compressor.
4. Destruction of the rubber damper of the compressor bed.
Rendering of major repair services for the Renner RS 1-30 compressor. Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 09:00 |
Request for Proposals # 3665010
... Expand
Partial technical inspection of lifting facilities in accordance with the requirements of Rostechnadzor Order No. 461 dated 11/26/2020 "On Approval of Federal Norms and Rules in the field of industrial safety Safety Rules for Hazardous Production facilities where lifting facilities are used."
It is necessary to carry out:
partial technical inspection of lifting facilities – 7 units:
- overhead electric double-girder crane controlled from the floor (head No. 27017, carrying capacity 10.0 tons);
- overhead electric double-girder crane controlled from the floor (head No. 27016, load capacity 10.0 tons);
- overhead electric double-girder crane controlled from the floor (head No. 27015, load capacity 10.0 tons);
- overhead electric double-girder crane controlled from the floor (head No. 27014, load capacity 10.0 tons);
- overhead electric double-girder crane controlled from the floor (head No. 27018, load capacity 10.0 tons);
- overhead electric single-girder crane controlled from the floor (head No. 7686, carrying capacity 3.5 tons);
- overhead electric single-girder crane controlled from the floor (head No. 8448, carrying capacity 3.5 tons).
Partial technical inspection of lifting facilities in accordance with the requirements of Rostechnadzor Order No. 461 dated 11/26/2020. Collapse
| Archived | "ChZPSN-Profnasteel" OAO | 23.05.2024 08:00 |