Request for Proposals # 3642052
... Expand
- Renovation of the building of the mono-charge preparation department (letters 26A; 26B; 2nd floor), inv. No. 01000440 shower rooms No. 41; 43; 44.
Renovation of shower rooms No. 41; 43; 44; according to the statement of work volumes No. 1-23.
As part of the works: finishing of shower rooms, sanitary facilities, garbage collection. Collapse
| Current | AO "KZF" | 17.06.2024 12:00 |
Request for Proposals # 3671314
Drawing nozzle No.118-18648 in the amount of 5000 pcs.
| Current | AO "KZF" | 24.05.2024 12:00 |
Request for Proposals # 3647211
Melting furnace drawing No. 620-21455 SB. Production in accordance with the requirements of the drawing and delivery within the agreed time in the amount of 3 pcs. Delivery is at the supplier's expense.
| Archived | AO "KZF" | 29.04.2024 12:21 |
Request for Proposals # 3649551
Lessar split systems according to the installation list
| Archived | AO "KZF" | 27.04.2024 12:00 |
Request for Proposals # 3647217
Manufacture of a water-cooled vault according to the drawing in the number of 3 pieces. Delivery is at the expense of the manufacturer. Drawing No. 625.001.000.00SAT
| Archived | AO "KZF" | 26.04.2024 13:38 |
Request for Proposals # 3647223
Plate 118-18692 in the amount of 20 pcs.
Delivery is at the supplier's expense.
| Archived | AO "KZF" | 26.04.2024 12:00 |
Request for Proposals # 3642071
Coke nut 3-10 mm, Ash content up to 24%, moisture no more than 15% phosphorus no more than 0.05 monthly for 65 tons in 2024.
| Archived | AO "KZF" | 22.04.2024 12:00 |
Request for Proposals # 3612204
Current repair of the charge preparation department of shop No. 2 according to the statement of work volumes No. 5-24.
As part of the work, the roof and blind area are repaired.
| Archived | AO "KZF" | 10.04.2024 12:00 |
Request for Proposals # 3608210
... Expand
- current repair of the building of the gas control point, inv. No.01000860, 90000276, EEC;
- current repair of the boiler room building, (letter 61), inv. No.01000820, EEC;
- current repair of the building of the combined household building of the BVC with a special basement, inv. No. 01000990, CRMO;
- current repair of the garage building No. 5 (for passenger cars), inv. No. 01000660, shopping center.
Current repairs according to the statements of work volumes № 6-24, № 7-24, № 8-24, № 9-24.
As part of the work, repair of roofs, walls and blind areas. Collapse
| Archived | AO "KZF" | 04.04.2024 12:00 |
Request for Proposals # 3603083
... Expand
- Current repair of economic and fecal sewerage from the boiler room, inv. No.11000420, EEC;
- Current repair of industrial and technical sewerage networks, inv. No. 11000370, EEC.
Current repairs according to the statements of work volumes No. 10-24, 11-24.
The works include the replacement of wells and pipes, the layout of the territory. Collapse
| Archived | AO "KZF" | 02.04.2024 12:00 |
Request for Proposals # 3603089
... Expand
Current repairs according to the statements of the scope of work № № 12-24, 13-24, 14-24, 15-24, 16-24, 17-24, 18-24.
As part of the works: replacement of old window blocks with PVC with mosquito nets, replacement of doors, installation of internal and external slopes, installation of tides and window sills.
- The building of shop 1 for smelting ferroalloys (letter 1) inv. No.01000220, FC No. 1.
- The building of shop 2 for smelting ferroalloys (letters 2A, 2B) inv. No.01000270, FC No. 1.
- The building of a hot water boiler house with boilers (letters 6 A,6 B) inv. No.01000850, EEC.
- The building of mechanical workshops (letters 28A; 28B; 28B; 28D) inv. No. 01000930, CRMO.
- The building of the refractory warehouse together with which OKS (letter 48) inv. No. 01001300, CRMO.
- The building of the administrative and household building (letter 23) inv. No. 01000500, TSL.
- The building of workshop No. 3 with a gallery and a special basement, inv. No.01000400, DAC. Collapse
| Archived | AO "KZF" | 02.04.2024 12:00 |
Request for Proposals # 3603092
... Expand
Current repairs according to the statement of work volumes No. 2-24.
As part of the work: cleaning the lining, tightening and painting of the bandage rings, repair of brickwork and light-curing.
Current repair of the brick pipe N=60m, inv. No. 02000080, Federal Center No. 1. Collapse
| Archived | AO "KZF" | 02.04.2024 12:00 |
Request for Proposals # 3575374
Replacement of 4 wheelsets on the TGM-4B shunting locomotive, by lifting the locomotive by rolling out the trolleys and replacing the wheelsets with new ones. Wheelsets are available, photo passport attached.
| Archived | AO "KZF" | 29.03.2024 12:00 |
Request for Proposals # 3572264
Carrying out the technical re-equipment of two steam boilers DKVr - 6.5 - 13 No. 3 and No. 4 in hot water mode in accordance with the design documentation. Changing the coolant parameters and putting the equipment into operation
| Archived | AO "KZF" | 21.03.2024 12:00 |
Request for Proposals # 3606188
1. Crushing plate movable crusher SM-741 drawing No. 254-2-0-1 - 2 pcs.
2.Crushing plate stationary crusher SM-741 drawing No. 254-0-0-1 - 2 pcs.
| Archived | AO "KZF" | 20.03.2024 12:30 |
Request for Proposals # 3606199
1. Crushing plate fixed
drawing No. 171-0-12B - 3 pcs.
2. Crushing plate movable drawing No. 171-2-7B - 3 pcs.
| Archived | AO "KZF" | 20.03.2024 12:24 |
Request for Proposals # 3588099
Boilers manufactured according to drawing No. 118-14075 SB, in the amount of 24 pieces
| Archived | AO "KZF" | 15.03.2024 12:20 |
Request for Proposals # 3600203
... Expand
Maintenance (maintenance) of safety devices specified by the PS: automobile and railway cranes 4 times a year, lift and gantry cranes 2 times a year.
THAT includes:
1. External inspection, cleaning of blocks and sensors from dust and dirt.
2. Checking the operation of the limiter with simultaneous monitoring of the absence of damage to single (LED) and alphanumeric indicators and switching elements.
3. Check the status of sensors, limit switches, connecting cables and connectors.
4. Check the condition of the seals.
5. Checking the operability of safety devices by lifting the control load and comparing the mass readings displayed on the indicator with the actual mass values of the lifted load. The difference of the compared values by weight of the cargo should not exceed ± 10%. Adjustment of the ONC (OGM-240), if necessary, based on the results of its verification.
6. Correction of the time of day of the limiter clock and cleaning of gaps between sensors (elastic elements) and crane structural elements.
7. Restoration of serviceability of harnesses and cables of safety devices without their replacement.
8. Identification of malfunctions and the scope of repair work, drawing up an act of technical condition.
9. Reading information from the parameter logger, with the design of the information card.
10. Extract (protocol) on verification of safety devices.
Lifting facilities (cranes, lift truck):
KDE-163 inv.№ 05010030;
KZHDE-25 inv.№ 05010360;
KS-3575A inv.№ 05010680;
MSHTS-4MN inv.№ 05018620;
KKS-10 inv.№ 05009980;
KKS-10 inv.№ 05010110;
KKS-10 inv. No. 05009490. Collapse
| Archived | AO "KZF" | 15.03.2024 12:00 |
Request for Proposals # 3576463
... Expand
Project development and fire alarm installation.
1. The building of the health center of the plant (letter A, A1), inv. No.01001510.
2. The building of the administrative building (letter 23), inv. No.01000500, TSL.
3. The building of the office of the construction department (letter A), inv.No.01001020.
4. The building of shop 3 with a gallery and a special basement, inv. No.01000400, DAC.
5. Garage No. 1, inv. No.01000710, shopping center. Collapse
| Archived | AO "KZF" | 01.03.2024 12:00 |
Request for Proposals # 3578924
Comprehensive environmental survey for the NVOS facility No. 65-0166-000150-P. Production site No. 1. Dvurechensk
| Archived | AO "KZF" | 29.02.2024 12:00 |