Request for Quotations No. 3573311 
Elimination of sludge accumulator

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Elimination of sludge accumulator
Liquidation with subsequent recultivation of hydraulic structures and waste disposal facility of sludge accumulator of sinter production on the left bank of the Upa river

OKPD2 category:
71.12.20.110  Услуги заказчика-застройщика, генерального подрядчика
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:08.03.2024 12:00
Last edited:13.02.2024 10:10
Organizer (Initiator):UK \"PMKh\" OOO
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing per unit price for each item from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:Payment is 100% within 60 days from the date of delivery of the goods
Delivery terms:DDP
Georeferencing:Tula region, Tula, Przewalski str., 2
Comments:
Please NOTE: THE SIZE OF EACH FILE ATTACHED TO THE COMPETITIVE BIDDING PROCESS SHOULD NOT EXCEED 50MB!
The methodology of the work, as well as the principle of cost formation, are specified in the Requirements Specification.
The requirements for the contractor are specified in the Requirements Specification, as well as:

• The Contractor's availability of SRO for these types of work, including OPO
• Availability of valid electrical safety tolerances (certificates) for ITR - not less than 5 gr.
• Availability of valid electrical safety permits (certificates) for brigade members: not less than 3 gr.
• The Contractor's work manager must be certified: item "A" - general industrial safety requirements; item "B.1" - hydraulic structures of industrial facilities, for knowledge of labor protection requirements to the extent appropriate to job responsibilities.
• The Contractor's Contractor must be certified and trained: to know the requirements of labor protection by profession and type of work; trained and certified to know the requirements of labor protection by profession , have certificates of the slinger;
• The relevant employees have welding certificates with certification in the NAKS (section 9, sub-item 4) for welding polyethylene geomembrane.
• Availability of the Contractor, certified NAKS equipment and technology for welding polyethylene geomembrane in accordance with the requirements of the register (section 9, sub-item 4)
• Availability of specialized equipment and devices for the Contractor to perform work, trained personnel and experience in performing similar work.

Upload permits to B2B, a transcript of costs in accordance with the attached form and Technical and Commercial Proposals in accordance with the Requirements Specification
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Фактический организатор:АКЦИОНЕРНОЕ ОБЩЕСТВО "ТУЛАЧЕРМЕТ"
Отв.лицо:Басов Игорь Михайлович

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 1. More >>