Request for Proposals # 3668547
Permanent climate camera KBF 240 BINDER (original, Equivalents are not acceptable)
For conditioning paper/cardboard samples according to the specified humidity and temperature according to ISO 187 – temperature 23 ± 1 ° C, humidity 50± 2 %
| Current | JSC SLPK | 23.05.2024 12:00 |
Request for Proposals # 3665985
Design and survey works - Railway tracks of the town of Koity: reconstruction of railway tracks No. 24,23, construction of railway track No. 20A.
Design and survey work in accordance with the terms of reference.
| Current | JSC SLPK | 22.05.2024 17:00 |
Request for Proposals # 3665905
... Expand
Storage of insurance stock of sulfuric acid at nearby sites in Syktyvkar or its environs on lease/hire/contract terms.
A warehouse with tanks/tanks for storing sulfuric acid.
Requirements for storage of sulfuric acid: mandatory availability of tank farms from 300 m3 for storage. An OPO insurance policy is required.
License for storage of products/substances for hazard classes I - III.
The safety data sheet is unlocked according to the add.request Collapse
| Current | JSC SLPK | 22.05.2024 12:00 |
Request for Proposals # 3667473
Thrust roller IRP-4 (original, Equivalents are not acceptable)
Technical requirements are indicated in the drawing
| Current | JSC SLPK | 22.05.2024 12:00 |
Request for Proposals # 3668505
Compressor PDW filter pos.152 CRSCHIPI (original, Equivalents are not acceptable)
Capacity 6340m3/h, pressure 2.5 bar, temperature 95C
| Current | JSC SLPK | 22.05.2024 12:00 |
Request for Proposals # 3652716
... Expand
Development of an online platform for clients of SLPC JSC
Terms of reference (Requirements Specification) for the preparation of Technical and Commercial Proposals in the attachment.
Questionnaire (Excel) for mandatory filling in the attachment. Collapse
| Current | JSC SLPK | 20.05.2024 17:00 |
Request for Proposals # 3609815
... Expand
Execution of a complex of works on illumination of the in-shop territory of the plant: Execution of lighting engineering calculation. Development of a map of the plant's lighting by sections and marks (floors) of the plant's production buildings.
According to the attached technical documentation (Requirements Specification). Collapse
| Current | JSC SLPK | 20.05.2024 14:00 |
Request for Proposals # 3664286
Replacement of the section of the right collector with KNS-9.
Replacement of the section of the right collector with KNS-9.
| Current | JSC SLPK | 20.05.2024 12:00 |
Request for Proposals # 3636098
... Expand
Replacement of the first stage of the convective superheater assembly (collectors, coils, parts of the suspension system) and sections of pipelines of the suspension system between the 1st and 2nd stage
Replacement of boiler elements that have expired the standard period Collapse
| Current | JSC SLPK | 17.05.2024 15:01 |
Request for Proposals # 3660506
Delivery of the printer of the end marking of rolls on the packing line of the paper-making machine No. 11 "Matthews Meria Lite 8"
| Current | JSC SLPK | 17.05.2024 13:00 |
Request for Proposals # 3660896
... Expand
Restoration of the structures of the central passage between the 4th and 5th aerotank to the prearator of the 2nd stage
Manufacturing and installation of metal structures. Reinforced concrete open bowl with a depth of 6 meters
consisting of three corridors, with aeration system.
The dimensions are 27 meters 156 meters. Collapse
| Current | JSC SLPK | 17.05.2024 13:00 |
Request for Proposals # 3660864
Pump CRO 18103-2
Pump CRO 18103-2
| Current | JSC SLPK | 17.05.2024 12:00 |
Request for Proposals # 3666311
Extra food salt
Technical description in the attachment
Packaging - bags up to 25 kilograms
| Current | JSC SLPK | 17.05.2024 12:00 |
Request for Proposals # 3660572
... Expand
The complex of works on the analysis of oil samples of locomotives of JSC "SLPK" SPHT.
It is necessary to analyze the oils of M14g2cc (diesel) and MS20 (compressor) locomotives TEM 18DM No. 3197, TEM 18DM No. 3277, TEM 18 No. 239, TEM 2UM No. 256 and TGM 4B No. 0303 for each maintenance.
The work is performed after receipt of the work/service order by fax and/or e-mail specified in the contract, according to the terms specified in the work/service order, but not more than 45 calendar days. Execution of works according to schedule.
According to the operating manual of TEM 18DM RE locomotives, a laboratory analysis of oils should be performed during maintenance of TO-3 with the determination of viscosity, content of mechanical impurities, water and flash point. Collapse
| Archived | JSC SLPK | 16.05.2024 15:00 |
Closed request for proposals # 3665494
| Archived | JSC SLPK | 01.01.1970 02:59 |
Request for Proposals # 3657796
... Expand
The complex of works on preparation for the heating season of the boiler house and heating networks of the Southern branch of the SL ULO
The complex of works on preparation for the heating season of the boiler house and heating networks of the Southern branch of the SL ULO Collapse
| Archived | JSC SLPK | 14.05.2024 12:00 |
Request for Proposals # 3657881
Repair of greenhouse No. 2
Repair of greenhouse No. 2
| Archived | JSC SLPK | 14.05.2024 12:00 |
Closed request for proposals # 3656825
| Archived | JSC SLPK | 01.01.1970 02:59 |
Request for Proposals # 3656829
... Expand
Styrene-acrylic dispersion/ Styrene-acrylic dispersion
Dispersion for strengthening and hydrophobic properties of surface layers of paper / Dispersion for strengthening and hydrophobic properties of surface layers of paper
Packing: Filling
Packaging: Bulk Collapse
| Archived | JSC SLPK | 13.05.2024 12:00 |
Closed request for proposals # 3662417
| Archived | JSC SLPK | 01.01.1970 02:59 |