Тендеры филиала ОАО "ОГК-5" "Конаковская ГРЭС"
Tender name | Tender Organizer | Valid until | |
---|---|---|---|
Public tender # 214
Lot #1. Supply of cable products
Specification and supply time-schedule are attached to Application form for participation in the tender | Archived | Filial "OGK-5" "Konakovskaia GRES" OAO | 22.02.2004 17:16 |
Public tender # 212
Lot #1. Supply of chemical products: ion-exchanging resin, sulphur coal, activated coal
Specification and supply time-schedule are attached to Application form for participation in the tender | Archived | Filial "OGK-5" "Konakovskaia GRES" OAO | 22.02.2004 16:57 |
Public tender # 211
Lot #1. Supply of water locking fittings: valves, gates, gate valves and spare parts for power valves
Specification and supply time-schedule are attached to Application form for participation in the tender | Archived | Filial "OGK-5" "Konakovskaia GRES" OAO | 20.02.2004 14:00 |
Public tender # 201
... Expand
Lot #1. JSC "CKB Energoremont", being the organizer of the tender, informs on holding the open tender for a right to sign the Contract for repair work of power equipment, buildings and facilities of JSC "Konakovo SRPS"
List and deadline for repair work at JSC "Konakovo SRPS" in 2004, Lot No. Repair work description (Lot description) Work term 1 Repair of thermal insulation of boiler compartment equipment of blocks 1-8 (except for smoke-exhaust compartment) 01.01.04 – 31.12.04 2 Repair of thermal insulation of smoke-exhaust compartment equipment of blocks 1-8 01.01.04 – 31.12.04 3 Repair of thermal insulation of turbine compartment equipment of blocks 1-8 01.01.04 – 31.12.04 4 Current repair of thermal insulation of turbine compartment equipment of Unit No.1 26.06-11.07.04 5 Current repair of thermal insulation of turbine compartment equipment of Unit No.2 01.03-17.03.04 6 Current repair of thermal insulation of turbine compartment equipment of Unit No.3 22.10-06.11.04 7 Overhaul of thermal insulation of turbine compartment equipment of Unit No. 4 12.07-21.10.04 8 Current repair of thermal insulation of turbine compartment equipment of Unit No.5 05.06-21.06.04 9 Current repair of thermal insulation of turbine compartment equipment of Unit No.6 18.03-02.04.04 10 Current repair of thermal insulation of turbine compartment equipment of Unit No.7 03.04-22.04.04 11 Mean-time repair of thermal insulation of turbine compartment equipment of Unit No. 8 23.04-25.06.04 12 Overhaul of thermal insulation of turbines K-300-240 of Unit No.4 12.07-21.10.04 13 Current repair of thermal insulation of boiler compartment equipment of Unit No. 1(except for smoke-exhaust compartment) 26.06-11.07.04 14 Current repair of thermal insulation of boiler compartment equipment of Unit No.2(except for smoke- exhaust compartment) 01.03-17.03.04 15 Current repair of thermal insulation of boiler compartment equipment of Unit No.3(except for smoke- exhaust compartment) 22.10-06.11.04 16 Overhaul of thermal insulation of boiler compartment equipment of Unit No.4(except for smoke- exhaust compartment) 12.07-21.10.04 17 Current repair of thermal insulation of boiler compartment equipment of Unit No.5 (except for smoke- exhaust compartment) 05.06-21.06.04 18 Current repair of thermal insulation of boiler compartment equipment of Unit No.6 (except for smoke- exhaust compartment) 18.03-02.04.04 19 Current repair of thermal insulation of boiler compartment equipment of Unit No.7 (except for smoke- exhaust compartment) 03.04-22.04.04 20 Current repair of thermal insulation of boiler compartment equipment of Unit No.8 (except for smoke- exhaust compartment) 23.04-25.06.04 21 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.1(except for smoke- exhaust compartment) 26.06-11.07.04 22 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.2 01.03-17.03.04 23 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.3 22.10-06.11.04 24 Overhaul of thermal insulation of smoke- exhaust compartment equipment of Unit No.4 12.07-21.10.04 25 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.5 05.06-21.06.04 26 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.6 18.03-02.04.04 27 Current repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.7 03.04-22.04.04 28 Mean-time repair of thermal insulation of smoke- exhaust compartment equipment of Unit No.8 23.04-25.06.04 29 Replacement of thermal insulation of open steam pipeline of Unit No.4 12.07-21.10.04 30 Insulation work of CWS equipment Within a year 31 Anti-corrosive protection of metal structure equipment of boiler compartment 01.01-31.12.04 32 Anti-corrosive protection of metal structure equipment of turbine compartment 01.01-31.12.04 33 Anti-corrosive protection of CWS equipment 01.03.04 –31.12.04 34 Anti-corrosive protection of BOU equipment 01.03.04 –31.12.04 35 Anti-corrosive protection of Unit No.8 during mean-time repair 23.04-25.06.04 36 Anti-corrosive protection of main gas pipeline and BZPV No.1,2 01.05-01.09.04 37 Anti-corrosive protection of Unit No.4 during overhaul 12.07-21.10.04 38 Replacement of desalted water tank No.5 of 500 m3 volume, neutralization tank No. 1 of 200 m3 volume 01.05.04-30.11.04 39 Repair of metal gas lines of boiler No. 8 during mean-time repair 23.04-25.06.04 40 Repair of metal gas lines of boiler No. 4 during overhaul 12.07-21.10.04 41 Current repair of brick gas line of Unit No.1 26.06-11.07.04 42 Current repair of brick gas line of Unit No.2 01.03-17.03.04 43 Current repair of brick gas line of Unit No.3 22.10-06.11.04 44 Overhaul of brick gas line of Unit No.4 12.07-21.10.04 45 Mean-time repair of brick gas line of Unit No.8 23.04-25.06.04 46 Replacement of fire water pipelines of boiler compartment axis 20-40 line B 01.01.04 –31.12.04 47 Replacement of un-boiled water heaters No.1 and No.2, repair of pipelines of un-boiled water unit and cooling pipelines of chemical inspection shields 01.01.04 –31.12.04 48 Replacement of blind tubes of condenser of Unit No.4 12.07.04-21.10.04 49 Maintenance of RVP of units 1-8 upon technical conditions 01.01.04 –31.12.04 50 Repair of RVP of Unit No.1 during current repair 26.06-11.07.04 51 Repair of RVP of Unit No.2 during current repair 01.03-17.03.04 52 Repair of RVP of Unit No.3 during current repair 22.10-06.11.04 53 Repair of RVP of Unit No.4 during current repair 12.07-21.10.04 54 Repair of RVP of Unit No.5 during current repair 05.06-21.06.04 55 Repair of RVP of Unit No.6 during current repair 18.03-02.04.04 56 Repair of RVP of Unit No.7 during current repair 03.04-22.04.04 57 Repair of RVP of Unit No.8 during mean-time repair 23.04-25.06.04 58 Replacement of protective pipes and cables at units No1-8 01.01 –31.12.04 59 Replacement of protective pipes and cables in TTC 01.01–31.12.04 60 Repair of oxygen analyzers in smoke gases TDK-3M (14 pcs.) 01.01–31.12.04 61 Repair of sensors BK-312, secondary devices BK-321 and replacement of block relays BK-321 01.01–31.12.04 62 Replacement of roofing OBK-1 01.03.04-01.09.04 63 Replacement of roofing OBK-2 01.03.04-01.09.04 64 Replacement of storm-water inlets, repair and replacement of lantern covering in the premises of Main building 01.04.04-01.07.04 65 Restoration of wall panels GK line A and B 01.04.04-01.09.04 66 Repair of smoke reinforced pipe No.3 H=250m Do=8m 03.04.04-25.06.04 67 Repair with replacement of electric motor winding ATD-630 4pcs During 2004. 68 Repair with replacement of electric motor winding BA-12-41-4 (4pcs) During 2004. 69 Current repair of turbine generator of Unit No. 1 June-July 2004 70 Current repair of turbine generator of Unit No. 2 March 2004 71 Current repair of turbine generator of Unit No. 3 October-November 04 72 Current repair of turbine generator of Unit No. 5 June 2004 73 Current repair of turbine generator of Unit No. 6 March-April 2004 74 Current repair of turbine generator of Unit No. 7 April 2004 75 Mean-time repair of turbine generator of Unit No. 8 04 –06.04 76 Overhaul of turbine generator of Unit No. 4 07-10.2004 77 Current repair of block transformers T-6A and T-6B of Unit No. 6 March-April 2004 78 Current repair of block transformers T-7A and T-7B of Unit No. 7 April 2004 79 Current repair of block transformers T-8A and T-8B of Unit No. 8 04.-06.2004 80 Current repair of autotransformers AT-1-330, AT-2-330, AT-3-330 01-12.2004 81 Current repair of block transformers T-5A and T-5B of Unit No. 5 June 2004 82 Current repair of block transformers T-3 of Unit No. 3 October- November 04 83 Current repair of block transformers T-2 of Unit No. 2 March 2004 84 Current repair of autotransformers AT-1-500 phase "B","C", AT-2-500 phases "A", "B", "C" 09.2004 85 Current repair of block transformers T-1 of Unit No. 1 06-07.04 86 Replacement of voltage transformer (TH-220kV0- of the 1-st system of tires (CSH-220 kV) with cable connections to OSG-220 04-10.2004 87 Replacement of un-tight inputs 220 ,330 kV of autotransformer AT-3-330 with tight ones 3-4 quarter 88 Repair of cable structures in cable tunnels and semi-floors of the main building and OSG Within 2004. 89 Repair of lightening of cable suspended boxes and cable semi-floors of power units st.No.3-8 line "B", with replacement of cable and wires Within 2004. 90 Repair of lightening of storehouse premises No. 180, 192 ORDiM and service platform of TG of power unit st. No. 1-8 Within 2004. 91 Current repair and maintenance of lightening system of general-station equipment Within 2004. 92 Current repair of 12 V circuit of turbine and boiler compartments of power units st. No.3-8, with replacement of wires and sockets Within 2004. 93 Replacement of lightening of Unit No. 2 with replacement of lamps, pipes and wires 01.03.04 -31.12.04. 94 Repair of general-station electrical equipment 04-10.2004. 95 Repair of tire protection of CSG – 6 kV with replacement of sensors of arc protection at Unit No. 4 07-10.2004 96 Repair of tire protection of CSG – 6 kV with replacement of sensors of arc protection at Unit No. 8 04-06.2004 97 Replacement of accumulator battery at Unit No. 2 03.2004 98 Replacement of accumulator battery at Unit No. 4 07-10.2004 Collapse | Archived | Filial "OGK-5" "Konakovskaia GRES" OAO | 18.02.2004 11:00 |
Public tender # 88
... Expand
Lot #1. Supply of spare parts and equipment for repair of turbines K-300-240 LMZ, generators TBB –320-2 LEO and pump rotor REN-600-320 (CBPE-320-550)
Range of supply 1 Pump ETSV-12-160-65 with electric motor 2 "Pump AX 150-125-400KEN with electric motor 4AM 250 S4 (75 kW.)" 3 Working wheel to pump 20HA-22x3 4 Working wheel to pump KCM-70 5 Front fireplace of LPC 6 Rear fireplace of LPC 7 Supply unit body 8 Level controller float ZG-500 9 Section (material is stainless steel) 10 Guiding unit 11 Section 12 Bearing bushing 13 Bearing bushing made of material "Sigma" 14 End-face sealing to pump REN 15 Pump 20NDN (D3200-33) with electric motor 16 Valve rod F120 17 Worm wheel 18 Worm 19 Disk spring PD 90x50x5x2 20 Centrifugal fan with electric motor 21 Spring 22 Spring 23 Spring 24 Spring 25 Spring 26 Spring 27 Spring 28 Spring 29 Pump KCB-500-220 with electric motor 30 Pump PD 650-160 with electric motor 31 Pump 20HDH (D3200-33) with electric motor. 32 Beams HPU FICD Hp, L = 380 mm 33 Beams HPU FICD Hp, L = 1000 mm 34 Beams HPU FICD Hp, L = 1100 mm 35 Beams HPU FICD Hp, L = 1200 mm 36 Beams HPU FICD Hp, L = 1300 mm 37 Beams HPU FICD Hp, L = 1400 mm 38 Beams HPU FICD Hp, L = 530 mm 39 Beams HPU FICD Hp, L = 650 mm 40 Beams HPU FICD Hp, L = 730 mm 41 Beams HPU FICD Hp, L = 850 mm 42 Beams HPU FICD Hp, L = 900 mm 43 Beams HPU FCU, L = 1000 mm 44 Beams HPU FCU, L = 1100 mm 45 Beams HPU FCU, L = 1200 mm 46 Beams HPU FCU, L = 700 mm 47 Beams HPU FCU, L = 800 mm 48 Beams HPU FCU, L = 900 mm 49 Sealing inserts made of material X13M2 50 Set of working blades 29st. 51 Set of working blades 1st.(reg. st.) 52 Front fireplace of HPC 53 Rear fireplace of HPC 54 Over-bandage sealing 13st. of MPC 55 Piston rings of HPC 56 Stud bolt M100x4x540 57 Stud bolt M 60x4x270 58 Stud bolt M 76x4x390 59 Sealing ring of HPC 60 Sealing ring of HPC 61 Sealing ring of HPC 62 Sealing ring of HPC 63 Sealing ring of HPC 64 Sealing ring of HPC 65 Sealing ring of MPC 66 Sealing ring of MPC 67 Discharge oil-drive compensator 68 Heater of NP (HNP-3) 69 Spiral of HHP 70 Spiral of HHP 71 Spiral of HHP 72 Spiral of HHP 73 Pump CNSK 60-66a with electric motor 74 Pump 20NDN (D3200-33) with electric motor. 75 Supply unit body 76 End-face sealing to pump REN 77 Centrifugal fan with electric motor. 78 Reduction valve 79 Ion-exchanging filters 80 "Pump 1D 630-90A with electric motor 4AM 250 4315 S4 (200 kW.)" 81 End-face sealing to pump CVK-125 Collapse | Archived | Filial "OGK-5" "Konakovskaia GRES" OAO | 20.01.2004 11:00 |
Посмотреть все процедуры филиала ОАО "ОГК-5" "Конаковская ГРЭС"
Тендеры других компаний:
- Тендеры филиала "Калугаэнерго" ПАО "МРСК Центра и Приволжья"
- Тендеры филиала ПАО "РусГидро" - "Карачаево-Черкесский филиал"
- Тендеры филиала "Владимирэнерго" ПАО "МРСК Центра и Приволжья"
- Тендеры ОАО "Берёзовская ГРЭС-1"
- Тендеры филиала ПАО «Россети Центр и Приволжье»- Мариэнерго
- Тендеры филиала ПАО "МРСК Северо-Запада" "Новгородэнерго"