Public tender # 25911
... Expand
Electric power supply of newly constructed blocks of residential houses for the needs of GUP Orenburgkommunelektroset
Lot #1. Electric power supply of newly constructed blocks of residential houses, located in Orenburgsky Region, Orenburgsky Disrict, Podgorodnyaya Pokrovka Village (Construction of 0.4 kV overhead line running from Transformer Substation-17116 in Ametistovy Pereulok, Perevolotskaya Street, completed length - 0.7 km; Construction of 0.4 kV overhead line running from Transformer Substation-17117, Transformer Substation-90 in Vneshnyaya Street, Samarskaya Street, completed length - 0.3 km; Construction of 0.4 kV overhead line running from Transformer Substation-17120, Transformer Substation-17119, Transformer Substation-17118 in Vneshnyaya Street, Samarskaya Street, Rossiyskaya Street, Samotsvetny Pereulok, Ametistovy Pereulok, Almazny Pereulok, Pologiy pereulok, completed length - 7.11 km; Construction of 10 kV overhead line with joint hanger of 0.4 kV overhead line running from Transformer Substation-17117, Transformer Substation-17115 in Ametistovy Pereulok, Rossiyskaya Street, Rubinovy Pereulok, completed length - 0.545 km; Construction of 10 kV overhead line with joint hanger of 0.4 kV running from Transformer Substation-17120, Transformer Substation-17119 in Ametistovy Pereulok, Rossiyskaya Street, completed length - 0.63 km; Construction of 10 kV overhead line to Transformer Substation-17119, Transformer Substation-17120 in Pology Pereulok, completed length - 0.5 km; Construction of 10/0.4 kV Kiosk-type Transformer Substation (PV)-250 with 250 kVA Oil-Filled Transformer # 17119 in Pology Pereulok, Rossiyskaya Street, 1 set; Construction of 10/0.4 kV kiosk-type transformer substation (TV)-250 with 250 kVA Oil-Filled Transformer # 17118 and # 17120 in Pology Pereulok, Rossiyskaya Street, 2 sets) (GUP Orenburgkommunelektroset)
Lot #2. Electric power supply of newly constructed blocks of residential houses, located in Orenburgsky Region, Octobrsky District, Oktyabrskoye Village (eastern microdistrict, 2 queue) (Construction of 0.4 kV insulated overhead line running from Package Transformer Substation # 64, completed length - 1.175 kV; Construction of 0.4 kV insulated overhead line running from Package Transformer Substation # 3, completed length - 1.635 km; Construction of 0.4 kV insulated overhead line running from Package Transformer Substation # 63, completed length - 0.39 km; Construction of 10 kV overhead line (Feeder # 4) with joint hanger of 0.4 kV insulated overhead line, completed length - 0.66/0.21 km; Construction of 10 kV overhead line (Feeder # 103) with joint hanger of 0.4 kV insulated overhead line, completed length - 0.696/0.3 km; Construction of 10/0.4 kV Kiosk-type Transformer Substation (B)-250 with 250 kVA Oil-Filled Transformer, 2 sets, 10/0.4 kV Kiosk-type Transformer Substation (B)-400 with 400 kVA Oil-Filled Transformer, 1 set; Construction of 0.4 kV insulated overhead line running from Package Transformer Substation # 2, completed length - 0.93 km) (GUP Orenburgkommunelektroset) Collapse
| Archived | "OKES" GUP | 17.08.2011 12:43 |