Request for Proposals # 3646959
Modernization of the RSVD 5 control system
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 14.06.2024 12:00 |
Request for Proposals # 3669674
Automation of the sorting site
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 14.06.2024 12:00 |
Request for Proposals # 3669680
TVM upgrade for the release of 17-18 inches
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 14.06.2024 12:00 |
Request for Proposals # 3686153
Dismantling of the building of building No. 86 (TP - fuel-filling station) with related facilities
Before issuing a Commercial Proposal, access to the work site is required
| Current | IC \"KIROV TYRE\" OOO | 13.06.2024 12:00 |
Request for Proposals # 3686261
... Expand
Development of working documentation for the installation of a safety system to perform work at a height above the existing equipment: "TBM", "Hermetic layer" in building No. 64, soot flow lines in building No. 19, bridge crane in building No. 19a with subsequent work
Before issuing a commercial offer, access to the place of work (provision of services) is required Collapse
| Current | IC \"KIROV TYRE\" OOO | 13.06.2024 12:00 |
Request for Proposals # 3686330
Modernization of the design of wind connections in the vulcanization shop of the hull 64 in the axes "24/B1-B2" and "24/E-E1"
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 13.06.2024 12:00 |
Request for Proposals # 3686455
Installation of a hot water supply pipeline on the territory of the enterprise
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 13.06.2024 12:00 |
Request for Proposals # 3679710
Modernization of the drinking water pipeline in building 19
It is mandatory to go to the place of work before issuing a Commercial Proposal
| Current | IC \"KIROV TYRE\" OOO | 11.06.2024 12:00 |
Request for Proposals # 3621510
Mold engraving services
It is mandatory to go to the place of work.
| Current | IC \"KIROV TYRE\" OOO | 07.06.2024 15:00 |
Request for Proposals # 3623451
Restoration of the wall panel in the vulcanization shop in the axes "24/A1-A2" K.64
Before issuing a commercial offer, access to the place of work (provision of services) is required.
| Current | IC \"KIROV TYRE\" OOO | 07.06.2024 15:00 |
Request for Proposals # 3684377
... Expand
Insertion of main filters into the existing main line in front of the A70 and TR20 assembly machines
The complex of works on dismantling and installation of the Flender gearbox No.4072912-0020-1 E3HA11 of the KGS 150 extruder of the Thyssen Krupp 70/830 00 113 extrusion line on the 1st floor of building No. 64
Replacement of the screw and nut of the roller sliding mechanism No. 3 of line 2.1 in housing 19a
Modernization of tempering stations to 19a.
Modernization of soot stream lines Collapse
| Current | IC \"KIROV TYRE\" OOO | 07.06.2024 15:00 |
Request for Proposals # 3663662
Modernization of ventilation units at the universal calender site
Before issuing a Commercial Proposal, access to the work site is required.
| Current | IC \"KIROV TYRE\" OOO | 07.06.2024 12:00 |
Request for Proposals # 3680481
Moving equipment around the enterprise
| Current | IC \"KIROV TYRE\" OOO | 07.06.2024 12:00 |
Request for Proposals # 3684670
Training of employees of Kirov Tyr PC LLC to the requirements of ISO 14001&ISO45001 standards
A group of up to 20 people
Full-time training on the territory of the Customer
| Current | IC \"KIROV TYRE\" OOO | 06.06.2024 12:00 |
Request for Proposals # 3640066
Reconstruction of loading and unloading dock No. 14 of building No. 1 (ramp)
Before issuing a commercial offer, access to the place of work (provision of services) is required.
| Current | IC \"KIROV TYRE\" OOO | 05.06.2024 15:00 |
Request for Proposals # 3663419
Replacing the engine of the first section of the cooling tower
It is mandatory to go to the place of work before issuing a Commercial Proposal
| Current | IC \"KIROV TYRE\" OOO | 05.06.2024 12:00 |
Request for Proposals # 3668137
Repair of shower rooms in building No. 3
| Current | IC \"KIROV TYRE\" OOO | 05.06.2024 12:00 |
Request for Proposals # 3668377
Reconstruction by 7
| Current | IC \"KIROV TYRE\" OOO | 05.06.2024 12:00 |
Request for Proposals # 3675415
Organization of a temperature control system for inputs of 6 kV transformers
Before issuing a Commercial Proposal, access to the work site is required.
| Current | IC \"KIROV TYRE\" OOO | 05.06.2024 12:00 |
Request for Proposals # 3625138
Modernization of the control unit of fire pumps of the pumping station of the automatic fire extinguishing installation (AUPT) 19a housing
Before issuing a commercial offer, access to the place of work (provision of services) is required
| Current | IC \"KIROV TYRE\" OOO | 03.06.2024 15:00 |