Request for Proposals # 3681280
... Expand
Straightening of crane tracks of a bridge crane in the buildings of the oxygen compressor shop of PJSC "CHMK" (5 pos.)
Straightening of crane tracks of a bridge crane in the buildings of the oxygen compressor shop of PJSC "CHMK" Collapse
| Current | PAO "ChMK" | 18.06.2024 15:00 |
Request for Proposals # 3685102
... Expand
Performance of works on installation of equipment and metal structures of the external part of aspiration of the foundry yard premises at the facility: PJSC "CHMK". Blast furnace shop. Blast furnace 5. Aspiration of the foundry yard
Performance of works on installation of equipment and metal structures of the external part of aspiration of the foundry yard premises at the facility: PJSC "CHMK". Blast furnace shop. Blast furnace 5. Aspiration of the foundry yard Collapse
| Current | PAO "ChMK" | 18.06.2024 15:00 |
Request for Proposals # 3687538
... Expand
Maintenance of TO-3, TO-5 and maintenance of TR-1, TR-2 diesel locomotives of the TEM-18 v/and PJSC "CHMK" (3 pcs.)
1. Carrying out regulated types of maintenance and repairs of locomotives. 2. TO-3, TO-5, TR-1 and TR-2 for the admission of locomotives on public roads Collapse
| Archived | PAO "ChMK" | 05.06.2024 15:05 |
Request for Proposals # 3659678
VIBRATION ANALYZER
VIBRATION ANALYZER SD-23 or equivalent
| Archived | PAO "ChMK" | 05.06.2024 12:00 |
Request for Proposals # 3618745
Repair of the rolling cage "AB" of mill 250-1 of Rolling shop No. 2 of PJSC "CHMK"
Repair of the rolling cage "AB" of mill 250-1 of Rolling shop No. 2 of PJSC "CHMK"
| Archived | PAO "ChMK" | 04.06.2024 19:00 |
Request for Proposals # 3669544
Position sensor, infrared pyrometer
SENSOR RHMO120MP101S3G8119 BUILT-IN 120MM, INFRARED PYROMETER LAND SOLONET SN21
| Archived | PAO "ChMK" | 04.06.2024 14:00 |
Request for Proposals # 3654515
Taps, Valves FLOWTOP FLOWPAK
Taps, Valves FLOWTOP FLOWPAK
| Archived | PAO "ChMK" | 04.06.2024 12:00 |
Request for Proposals # 3671125
Equipment for DP No.5 and KAAR40/25
Switches, relays
| Archived | PAO "ChMK" | 31.05.2024 14:00 |
Request for Proposals # 3646680
Overhaul of the smoke hog of methodical furnaces No.1-3
Complete replacement (dismantling, subsequent lining) of refractory masonry, in accordance with the project "Borov methodical furnaces"
| Archived | PAO "ChMK" | 27.05.2024 15:00 |
Request for Proposals # 3657706
... Expand
Rendering of services for the replacement of toner and spare parts of cartridges for printing and multiplying equipment of structural divisions of PJSC "CHMK" (1 item).
Rendering of services for the replacement of toner and spare parts of cartridges for printing and multiplying equipment of structural divisions of PJSC "CHMK" (1 item).According to the Requirements Specification. Collapse
| Archived | PAO "ChMK" | 27.05.2024 14:00 |
Request for Proposals # 3659683
UNINTERRUPTIBLE POWER SUPPLY
UNINTERRUPTIBLE POWER SUPPLY
| Archived | PAO "ChMK" | 27.05.2024 12:00 |
Request for Proposals # 3649612
Overhaul of the roof of the divisions of PJSC "CHMK" in the 2-3 quarter of 2024 (5 pos.)
Overhaul of roofs and abutments to the walls at the facilities of PJSC "CHMK". According to the applications and the project.
| Archived | PAO "ChMK" | 23.05.2024 18:00 |
Request for Proposals # 3647832
... Expand
Current repair of hydraulic equipment URBS (PPR 7 months)
Performing maintenance work on the equipment of the URBS mill (section of the heating furnace, section of the mill, section of the refrigerator, section of the hot and cold cutting saws) in accordance with the daily task Collapse
| Archived | PAO "ChMK" | 23.05.2024 15:00 |
Request for Proposals # 3621720
Transportation of passengers by buses
Transportation of passengers by buses
| Archived | PAO "ChMK" | 23.05.2024 13:00 |
Request for Proposals # 3648168
... Expand
Overhaul of houses at recreation centers "Chaika", "Rainbow lake.Uvildy, "Rental-3" lake. Chebarkul (14ed.)
List of main works:
1. Roof repair,
2. Siding with insulation on the outside,
3. Wall cladding, OSB ceiling inside,
4. Floor repair,
5. Replacement of door and window blocks,
6. Repair of electrical equipment.
7. Removal of construction debris. Collapse
| Archived | PAO "ChMK" | 23.05.2024 13:00 |
Request for Proposals # 3646288
... Expand
Execution of a complex of construction and installation works at capital construction facilities: "PJSC "CHMK". Fire alarm and fire extinguishing systems" in the 2nd quarter of 2024 (10 items)
Execution of a complex of construction and installation works at capital construction facilities: "PJSC "CHMK". Fire alarm and fire extinguishing systems" in the 2nd quarter of 2024 (10 items) Collapse
| Archived | PAO "ChMK" | 22.05.2024 15:00 |
Request for Proposals # 3650137
... Expand
Current repair (first maintenance) of the VAUTAP VRC transformer transformer GETRA F3C613T0000 ESPC
Oil drain from the contactor. Removing the CHEKA from the tank. THE VCHK, jet relay, contactor tank. Replacement of the energy accumulator plate. Filling transf.oils. THE motor drive, drive shafts, gearboxes. Nal-the work of the RPN and the drive contractual counterparty. Prov-contractual counterparty of locks. Collapse
| Archived | PAO "ChMK" | 22.05.2024 13:00 |
Request for Proposals # 3655502
... Expand
Performing electrical installation work on an Open switchgear (OPU) 35/10 kV of the Oxygen station KdAdAr 40/25 at the facility "KCC. Provision of air separation products"
Power supply to the ORU 35/10kV to provide power to the oxygen station KdAdAr 40/25 Collapse
| Archived | PAO "ChMK" | 21.05.2024 16:00 |
Request for Proposals # 3639545
... Expand
Examination of industrial safety of non-public railway tracks of PJSC "CHMK" along the route of transportation of hot metals, melts and slags in 2024 (4 items)
Examination of industrial safety of non-public railway tracks of PJSC "CHMK" along the route of transportation of hot metals, melts and slags in 2024 (4 items) Collapse
| Archived | PAO "ChMK" | 21.05.2024 13:00 |
Request for Proposals # 3647980
... Expand
Modernization of aspiration systems B-15, B-19 FLC with replacement of the air purification system from scrubbers to bag filters
Modernization of aspiration systems B-15, B-19 FLC with replacement of the air purification system from scrubbers to bag filters Collapse
| Archived | PAO "ChMK" | 21.05.2024 12:00 |