Request for Proposals No. 3494656 
Design and installation of monolithic reinforced concrete industrial floors. Sarapul

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Design and installation of monolithic reinforced concrete industrial floors. Sarapul

OKPD2 category:
Quantity:1 усл.ед
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:24.11.2023 10:00
Плановая дата подведения итогов
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
:
24.11.2023
Last edited:20.11.2023 09:38
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:Advance payment is not more than 20%
Delivery terms:The scope and list of works includes, but is not limited to, the composition
listed below. The works are carried out by the Contractor in full,
"turnkey", by the Contractor's forces, means and mechanisms, including all
necessary consumables and related expenses.
1. Development of technical documentation, including:
- study of materials of previously performed engineering-geological
surveys of the natural foundation and tests of physical and mechanical
properties of soils;
- development of the working documentation section "Reinforced concrete structures.
Floors", which includes the design part, according to the loads, and standard
solutions according to Appendix B, working drawings of reinforcement,
sheets, nodes, nodes of the device of all types, i.e. a complete set of working
documentation necessary to carry out work on the installation
of reinforced concrete floors and the base for them. Coordination with the Customer and
General Designer
- technological regulations or PPR for the device of artificial
crushed stone foundation and monolithic reinforced concrete floors,
including measures to ensure quality control during
the production and acceptance of works, safety and labor protection.
- coordination of documentation with the Customer and the General Designer
2. Restoration/arrangement of the crushed stone base to the design
marks from local materials suitable for backfilling and compaction to the required
parameters – SHPS/PGS. Including
the necessary earthworks, Call FOR Bidding, delivery, provision of input quality control
of materials, laying, compaction, testing, technical and geodetic
support, step-by-step registration, preparation of executive
documentation, delivery of works to the technical supervision of the Customer and all
necessary work on the preparation of the foundation, according to the approved RD,
PPR, Technical specifications of the Customer and Customer requirements.
3. The device of a monolithic reinforced concrete slab. Including Call for Bidding,
delivery, unloading, provision of input quality control of materials,
laying, sealing, maintenance, testing, technical and geodetic
support, step-by-step assembly, preparation of executive
documentation, delivery of works to the technical supervision of the Customer and all
necessary works and materials for the installation of a monolithic
reinforced concrete floor slab, according to approved RD, PPR,
Technical specifications of the Customer and Customer requirements.
2
Minimum daily performance standards for concreting the slab
- at least 2500m2 per day.
By the decision of the Customer, part or the full amount of materials
listed in the Statement of Work volumes can be delivered
By the customer, as a giveaway material. The obligation, in this
case, for entry control, acceptance, unloading, transfer to the place
of work, completeness, protection and safety of material and
property, etc., remains with the Contractor.
Georeferencing:Udmurt Republic, Sarapul, Old Izhevsk tract, 22
Comments:
1. Work should be carried out in accordance with the requirements of the standards:
RD-11-02- 2006 Requirements for the composition and procedure for maintaining executive
documentation during construction
SP 435.1325800.2018 Concrete and reinforced concrete monolithic structures
SP 45.13330.2017 Earthworks, foundations and foundations.
SP 22.13330.2016 Foundations of buildings and structures
GOST R 21.1101-2013 System of project documentation for construction
(SPDS). Basic requirements for project and working documentation
GOST 22690-2015 Concrete. Determination of strength by mechanical methods
of non-destructive testing
GOST 10180-2012 Concrete. Methods for determining the strength of control
samples
GOST 22685-89 Forms for the manufacture of control samples of concrete.
Technical conditions
GOST 18105-2018 Concrete. Rules for the control and evaluation of strength
SP 70.13330.2012 "Load-bearing and enclosing structures".
SP 63.13330.2012 "Concrete and reinforced concrete structures".
SP 29.13330.2011 "Floors".
SP 71.13330.2011 "Insulation and finishing works".
SP 48.13330.2011 "Organization of construction".
TR34 "Concrete industrial ground floors. Technical report №34 3rd edition».
SNiP 12-03-2001 Labor safety in construction. Part 1
SNiP 12-04-2002 Labor safety in construction. Part 2
ODM 218.5.007-2016 "Guidelines for determining the modulus
of elasticity by a static stamp"
SP 71.13330.2017 Insulation and finishing coatings. Updated
version of SNiP 3.04.01-87.
, valid on the territory of the Russian Federation, Working documentation, Statement
of work volumes, Contract and this Technical Specification, other
technical and regulatory documents;
2. The materials, equipment, tools used must
comply with GOST, technical specifications applicable in the territory of the Russian Federation, have
the necessary certificates and permits.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: Hidden