Public tender # 1888
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Volgodonsk Heat Network, being an organizer of tender, informs on holding open one-stage tender for registration of highway No.9 from UZP-1 to UZ-7 (within an area from SHO-4 to CK-1). Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 24.06.2005 15:00 |
Public tender # 1852
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender for performance of work upon reconstruction of the part of heating main in Sokolov avenue from Sedov street to Socialist street (with passage) of the length of 490 tr.m., Dnom 500mm. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 20.06.2005 15:00 |
Public tender # 1859
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender for performance of work upon reconstruction of the part of heating main in micro-district "Temernik" from PK-4 to KPP-1 (the II-nd stage) of the length of 760 tr.m., Dnom300 Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 20.06.2005 14:30 |
Public tender # 1856
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender for performance of work upon reconstruction of the part of heating main in Revolution park from TK 1339/9 to TK 1347 of the length of 857 tr.m., Dnom 300-250 mm. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 20.06.2005 14:00 |
Public tender # 1861
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch JSC "RGK" Rostov HPP-2, being an organizer of tender, informs on holding open one-stage tender for a right to sign the Contract for performance at two power units ( Nos. 1 and 2) in 2005 of the 1st stage of work upon reconstruction of ZZU burners and safety stop valves.
Structure of the lot:
1. The enlarged scope of work (supposed for one power unit):
1.1. Dismantling the active panel of ZZU at elev. + 6.0m;
1.2. Dismantling the cabinet of interlocking relay at elev. + 11.4 m;
1.3. Dismantling the protection panel of MCR;
1.4. Dismantling the ignition torch 1-6 at elev. + 6.0 m;
1.5. Dismantling the control diagram of gate valves 1 along the way of G5; G7; G9; G11; G13; G15;
1.6. Dismantling the gate valves and flanges at the pipelines of these gates;
1.7. Dismantling the panel ZZU at elev. + 6 m and connection of available and new-laid cables;
1.8. Installation of the panel of interlocking relays at elev. + 11.4 m with cable connection as well;
1.9. Installation of the MCR protection panel with cable connection;
1.10. Laying-out the cable along the available traces:
Cable of KB PGhG grade of section:
4x1,5 – 560 rm; 7x1,5 – 180 rm; 10x1,5 – 1020 rm; 14x1,5 – 855 rm; 19x1,5 – 215 rm;
27x1,5 – 1475 rm; 37x1,5 – 290 rm; 4x2,5 – 170 rm;
1.11. Installation of light with spark ignition block and electric magnet valve on torches 1-6;
1.12. Installation of photo sensors of FDCHC grades of torches 1-6;
1.13. Installation of gas lines;
1.14. Installation of gates of 30c941hk Dnom50 (6 pcs.) type and laying -out the cable from the gate valve assembly unit to the electric motors of gates;
1.15. Installation of PZK EK-113M Dnom300 (6 pcs.), additional "coils" and flanges instead of dismantled gates G5; G7; G9; G11; G13; G15;
1.16. Installation of control system of PZK and laying-out the cable from the gate valve assembly unit to the control panel ZZU;
1.17. Painting the gas line in the places of installation of coils, PZK and gates to lights;
1.18. Submission of the object to the inspection body of Rostechnadzor.
Deadline for performance of work at the 1st power unit – from 29.06.05 to 15.07.05.
Deadline for performance of work at the 2nd power unit – from 15.08.05 to 1.09.05. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 20.06.2005 13:00 |
Public tender # 1847
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch JSC "RGK" Rostov HPP-2, being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for performance of work: "Replacement of cast iron parts of exhaust pipe head H=180 m of Rostov HPP-2" Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 17.06.2005 15:00 |
Public tender # 1787
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Rostov HPP-2, being an organizer of tender, informs on holding open one-stage tender for a right to sign the Contract for performance at two power units ( Nos. 1 and 2) in 2005 of the 1st stage of work upon reconstruction of ZZU torches and safety stops valves.
Structure of the lot:
1. The enlarged scope of work (supposed for one power unit):
1Dismantling the active panel of ZZU at elev. + 6.0m;
1.2. Dismantling the cabinet of interlocking relay at elev. + 11.4 m;
1.3. Dismantling the protection panel of MCR;
1.4. Dismantling the ignition torch 1÷6 at elev. + 6.0 m;
1.5. Dismantling the control diagram of gate valves 1 along the way of G5; G7; G9; G11; G13; G15;
1.6. Dismantling the gate valves and flanges at the pipelines of these gates;
1.7. Dismantling the panel ZZU at elev. + 6 m and connection of available and new-laid cables;
1.8. Installation of the panel of interlocking relays at elev. + 11.4 m with cable connection as well;
1.9. Installation of the MCR protection panel with cable connection;
1.10. Laying-out the cable along the available traces:
Cable of KB PGhG grade of section:
4x1,5 – 560 rm; 7x1,5 – 180 rm; 10x1,5 – 1020 rm; 14x1,5 – 855 rm; 19x1,5 – 215 rm;
27x1,5 – 1475 rm; 37x1,5 – 290 rm; 4x2,5 – 170 rm;
1.11. Installation of light with spark ignition block and electric magnet valve on torches 1÷6;
1.12. Installation of photo sensors of FDCHC grades of torches 1÷6;
1.13. Installation of gas lines;
1.14. Installation of gates of 30c941hk Dnom50 (6 pcs.) type and laying -out the cable from the gate valve assembly unit to the electric motors of gates;
1.15. Installation of PZK EK-113M Dnom300 (6 pcs.), additional "coils" and flanges instead of dismantled gates G5; G7; G9; G11; G13; G15;
1.16. Installation of control system of PZK and laying-out the cable from the gate valve assembly unit to the control panel ZZU;
1.17. Painting the gas line in the places of installation of coils, PZK and gates to lights;
1.18. Submission of the object to the inspection body of Rostechnadzor.
Deadline for performance of work at the 1st power unit – from 29.06.05 to 15.07.05.
Deadline for performance of work at the 2nd power unit – from 15.08.05 to 1.09.05 Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 07.06.2005 13:00 |
Public tender # 1778
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of branch JSC "RGK Volgodonsk HPP-2", being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for reconstruction of thermal line from HPP-2 to SWD from HPP-2 to TK-17. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 03.06.2005 15:00 |
Public tender # 1779
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of branch JSC "RGK Volgodonsk HPP-2", being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for purchasing the equipment for object "Technical re-equipment of vibration control and measuring the technical values at TA of st. No. 1 VdHPP-2"
Structure of the lot:
1.Control devices of the mechanical parameters including the following:
1.1 Tachometer module, measurement range of 0-4 000 rpm, within a quantity of 1(one) set, including the following:
-measuring block, transformer, sensor.
1.2 Axial shifting module, measurement range of -2,5…+2,5 mm, within a quantity of 2 (two) sets, including the following:
-measuring block, transformer, sensor.
1.3 Module OPP, measurement range of -5…+5 mm, within a quantity of 2(two) sets, including the following:
-measuring block, transformer, sensor.
1.4 Module AP, measurement range of 0…30 mm, within a quantity of 2(two) sets, including the following:
-measuring block, transformer, sensor.
1.5 Rotor bending module, measurement range of 0…0,5 mm, within a quantity of 1(one) set, including the following:
-measuring block, transformer, sensor.
2. Vibro-monitoring set, including the following:
2.1 Absolute vibration module, measurement range of 0,1…30 mm/s, 10…-1 000 Hz., within a quantity of 18 (eighteen) sets, including the following:
-measuring block, transformer, sensor.
2.2 Cabinet-pole, within a quantity of 1(one) set.
2.3 "Vibromonitoring" system, within a quantity of 1 (one) set. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 03.06.2005 15:00 |
Public tender # 1777
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender performance of work upon reconstruction of tank-accumulator of hot water V=2000 v3 for RK-4. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 03.06.2005 14:00 |
Public tender # 1780
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Volgodonsk HPP-2, being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for purchasing "Equipment for reconstruction of measuring instruments of VHR control of steam-water line of boilers, turbines and water preparation "Main building" (KA-1, TA-1)". Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 03.06.2005 14:00 |
Public tender # 1776
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender performance of work upon reconstruction of gas structure of boiler PBTM-50 No. 1 at RK-3. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 03.06.2005 13:00 |
Public tender # 1759
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Volgodonsk HPP-2, being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for purchasing the equipment for the object of capital construction "Improvement of technical and economical parameters of equipment of KTC HPP-2":
Lot No.1 Pipe system PHD-4 TG-2 (PH-250-16-7), within a quantity of 1 pc.
Lot No.2 Pipe system SSB-1 (SSB-125-7-15), within a quantity of 1 pc.
Lot No.3 Intensified filler PBP-2A, B of boiler unit BKZ-420-140 HGM st. No. 2, within a quantity of 2 sets. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 30.05.2005 15:00 |
Public tender # 1765
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of the branch of JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender for performance of work upon repair of reinforced pipe of RK-4 of RTS.
Deadline of work performance:
Start: the 1st stage (July-December 2005)
Finish: the 2nd stage (June-August 2006) Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 30.05.2005 15:00 |
Public tender # 1771
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender performance of work upon reconstruction of the part of the heating main in Krylovskoy lane (Petrovskaya -Socialisticheskaya) of the length of 150 tr.m., Dnom200mm Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 30.05.2005 15:00 |
Public tender # 1764
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Volgodonsk HPP-2, being an organizer of tender, informs on holding open one-stage tender with re-trading for a right to sign the Contract for repair of "Rotor of low-pressure turbine unit PT-135/165-130/13 st. No. 4 of Volgodonsk HPP-2" Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 30.05.2005 14:00 |
Public tender # 1766
... Expand
Lot #1. Principal JSC "Rostov generating company" in the interests of branch JSC "RGC" Rostov Heat Network , being an organizer of tender, informs on holding open one-stage tender for performance of work upon repair of floor of the building of machine building of CK RTS. Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 30.05.2005 14:00 |
Public tender # 1752
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Rostov HPP-2, being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for performance of work: "Performance of work upon repair of measuring and control instruments, shop repair of devices" Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 26.05.2005 16:15 |
Public tender # 1751
... Expand
Lot #1. The Principal JSC "Rostov Generating Company" in the interests of the branch of JSC "RGK" Rostov HPP-2, being an organizer of tender, informs on holding the open one-stage tender for a right to sign the Contract for performance of work: "Development and removal of sludge from sludge storage of Rostov HPP-2; elimination of temporary sludge dump within the territory of industrial area" Collapse
| Archived | "Rostovskaia generiruiushchaia kompaniia" OAO | 26.05.2005 15:00 |