Request for Proposals No. 3505697 
The device PP (concrete) Vladimir

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

The device PP (concrete) Vladimir
Installation of prefabricated reinforced concrete structures

OKPD2 category:
43  Работы строительные специализированные
43.9  Работы строительные специализированные прочие
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:06.12.2023 12:00
Last edited:29.11.2023 23:34
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:post-payment
Delivery terms:6. Scope of work The scope and list of works includes, but is not limited to, the composition
listed below. The works are carried out by the Contractor in
full, "turnkey", by forces, means and mechanisms
Contractor, including all necessary supplies and
related expenses.
1. Statement of work volumes according to Appendix A.
2. Call for Bidding of materials for the installation of a fire wall made of
precast concrete panels.
3. Mobilization of all necessary equipment and tools
to the work site in the amount necessary for
high-quality work in accordance with the GPR.
4. Performing input control of materials with entries in journals
and acts. To make acceptance, unloading and storage of panels
at the place of work.
5. Installation of scaffolding.
6. Installation of prefabricated reinforced concrete structures according to the Working
documentation
7. Other works necessary for the successful execution of works.
8. Check the correct installation of the panel.
9. Perform the dismantling of scaffolding.
10. Cleaning and removal of garbage outside the construction site during
the execution of works.
11.Delivery of the results of the work performed to the Customer
12. Formation and transfer of executive
documentation to the Customer in full.
7. Term of
work
According to the schedule of works in Appendix B
8. Initial data
provided
by the customer
Appendix A: Statement of work volumes
Appendix B: Schedule of works
Appendix B: Working documentation of the brand.
Georeferencing:600000, Russia, Vladimir region, Vladimir
Comments:
9. Special requirements 1. Prior to the start of installation, perform a geodetic survey
of the grillage and column structures for compliance with the planned and
altitude position, notify the Customer about excessive deviations and
discrepancies with the Executive survey.
2. Before the start of the work, coordinate the PPR and the schedule
of work with the Customer. Carrying out work without
an agreed PPR is prohibited.
3. Storage and transportation of panels should be carried out in
accordance with the requirements of GOST 31310-2015, with the following
additions:
- Move and install the panels using
self-balancing traverses that ensure the vertical position of the panels.
- the panels are supported in the warehouse and during transportation only by an internal bearing layer on special
gaskets (wooden, rubber, etc.).
4. Install the panels on a layer of cement-sand mortar
M100. When installing joints
, the planes of the joined structures must be cleaned of ice, snow and debris. During
installation, geodetic control of the accuracy
of panel installation should be carried out. When installing the panels in the design position
, the spatial immutability
of the structures and the accuracy of installation must be ensured by installing mounting
wedges, which are subsequently replaced with cement-sand
mortar M100.
5. In the area where the panels are installed on the plates of the mounting parts
, the ridge of the panels should be cut down.
6. Install the reinforcement rods on the polymer epoxy
adhesive in a pre-drilled and prepared hole.
7. Installation of structures in winter conditions should
be carried out in a non-heating manner using a solution with
antifreeze additives that increase
the strength of the solution at subzero temperatures without warming up.
In this case, you should be guided by SP 70.13330.2012. Installation
of structures on a layer of frozen mortar is not allowed. During
the onset of thaw and spring thawing
, careful monitoring of structures
installed in winter conditions should be organized.
8. Gravy should be carried out with a non-shrink mounting mixture with
a strength of at least 45Mpa (according to the Ceresit SH15 type).
9. After installing the panels in the design position
, the mounting mounting plates should have an anti-corrosion coating.
Two layers of enamel PF -115 according to GOST 6465-76 on the primer GF -
021 (coating thickness 55 microns).
10. Mounting welding is performed with electrodes E42 or E42A.
Installation welding should be performed in accordance with the requirements
of SP70.13330.2012, GOST 14098-2014, GOST 5264-80.
11. After welding, metal
surfaces should be cleaned and primed with two layers of GF-021 primer
and then the recesses in the column and panel should be wiped with cement mortar
M100. It is allowed to use repair mixtures
intended for repairing the surfaces of concrete structures instead of mortar.
12. Work on corrosion protection of welded joints in
winter conditions should be carried out in accordance with the instructions of the joint venture
72.13330.2016 "Protection of building structures and structures from
corrosion", GOST 9.402-2004 "Unified system of protection against corrosion and
aging. Paint and varnish coatings. Preparation of metal
surfaces for painting".
13. On all concrete surfaces in contact with the ground
, perform waterproofing with a coating bituminous polymer
mastic twice over a pre-leveled and
primed surface with a ready-made primer.
14. All works are carried out "turnkey" with materials and forces
The contractor. The cost of the works includes temporary lighting,
sanitary facilities, consumables, overlaps,
overlaps and docking of materials, travel expenses,
materials and equipment for laying, care and heating of concrete,
personal protective equipment for safety,
sanitation, collection, removal and disposal of garbage, safety
of materials, equipment and property, obtaining and developing
the necessary related documents for the production of works and
other costs necessary for the successful completion of work within
the time limits set by the contract and with quality that meets the
requirements of the Customer, this Requirements Specification and Working Documentation.
15. Payment for the work performed shall be made for
the amount of work actually performed, based on the executive
documentation, with confirmation by the technical supervision and
surveyor of the customer. The volumes and cost of the work performed
are closed after the fact, i.e. losses during transportation and during
unloading/loading, overlaps, trimming, overlaps, coefficient. for
irreparable losses, coefficient. metal deposition, etc. should
be included in the cost of works.
16. Daily, when performing work, ensure cleanliness on
the construction site and the surrounding area. After
completion of the work, it is necessary to clean the territory and
remove garbage.
17. The Contractor undertakes to prepare and send to the Customer
a daily report, in the form of the Customer, on the work performed.
18. Any changes in the composition and content of the work,
equipment and materials used shall
be documented in writing and sent to the Customer for
consideration.
Work on the installation of prefabricated, reinforced concrete panels
of fire walls must be carried out in full
in accordance with this Technical Specification and Working
Documentation, to ensure the required
fire resistance limit of the REI-150 wall, as well as to prevent deterioration
of smoke and gas tightness conditions.
10. Provision and
payment
of electricity
The contractor provides its own
electricity needs.
11. Provision
of water supply
The contractor independently provides for its needs in
technical and household water supply.
12. List
of normative technical
documents, in
accordance with
the requirements
of which
it is necessary
1. Work should be carried out in accordance with the requirements of the standards:
GOST 25628-90 Reinforced concrete columns for single-storey buildings
of enterprises
GOST 13015-2012 Concrete and reinforced concrete products for
construction
GOST 14098-2014 Welded fittings and embedded
products of reinforced concrete structures
RD-11-02- 2006 Requirements for the composition and procedure for conducting
the execution of the work of the executive documentation
SP 70.13330.2012 Load-bearing and enclosing structures
SP 435.1325800.2018 Concrete and reinforced
concrete monolithic structures
GOST R 21.1101-2013 System of project documentation for
construction (SPDS)
SP 45.13330.2017 Earthworks, foundations and foundations.
SP 48-133330 Organization of construction
SP 22.13330.2016 Foundations of buildings and structures
GOST 18105-2010 Concrete. Rules for the control and evaluation of strength
GOST 22690-2015 Concrete. Determination of strength by mechanical
methods of non-destructive testing.
operating on the territory of the Russian Federation, Working documentation,
Statement of work volumes, Contract and this Technical
Specification, other technical and regulatory documents;
2. The materials, equipment, tools used must
comply with GOST, technical specifications applicable in the territory of the Russian Federation, have
the necessary certificates and permits.
12. Guarantee of the
result of the work
The guarantee for the result of the work performed by the Contractor is 5 years.
13. Requirements for
Labor protection and

Safety techniques.
The contractor is obliged to strictly comply with the requirements of OT and TB, in
accordance with the requirements of Russian legislation, as well
as internal requirements of the enterprise when carrying out work.
The Contractor is obliged to immediately respond to all comments from
the Customer on violations of the Occupational Health and Safety rules, and immediately
eliminate such comments. The customer has the right to stop the
contractor's work until the violations are eliminated, in case such
violations may lead to serious injuries or death
of the contractor's employees. The customer has the right to impose a fine on
The Contractor for not fulfilling the Customer's requirements to eliminate
violations of the Occupational Health and Safety rules.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: Hidden