Materials for the current repair of the production site and the storage room in the boiler room, the narrow section, the ceiling of the assembly area and the bathrooms of the experimental building, the corridor of the second floor of building No. 5, the second floor of building 100R, the shelter of GO No. A-1640, RU-0.4 kV in the engineering building No. 3, rooms on the second and on the fourth floor, bathrooms on the third floor, doors in the el. technical niches of the 2nd floors of the engineering building No. 1.
Delivery in accordance with the Technical Specification (see the Technical Specifications tab) The delivery time of materials is no later than 45 days from the date of conclusion of the contract.
Материалы для проведения текущего ремонта производственного участка и помещения кладовой в стендовой котельной, участка УЗК, потолка участка сборки и санузлов стендово-экспериментального корпуса, коридора второго этажа корпуса № 5, второго этажа здания 100Р, убежища ГО № А-1640, РУ-0,4 кВ в инженерном корпусе № 3, помещений на втором и четвертом этажах, санузла на третьем этаже, дверей в эл. технических нишах 2- этажей инженерного корпуса № 1. Поставка в соответствии с Техническим заданием (см. вкладку Технические характеристики) Срок поставки материалов не позднее 45 дней со дня заключения договора.