Request for Proposals # 4404101
... Expand
" Collection, transportation of production and consumption waste of 3-5 hazard classes of PJSC "CHMK", for subsequent neutralization, or processing, or placement (3 items)"
Collection, transportation of production and consumption waste of hazard classes 3-5 of PJSC "CHMK", for subsequent neutralization, or processing, or placement in accordance with the Appendix to the Terms of Reference Collapse
| Current | PAO "ChMK" | 27.04.2026 15:00 |
Request for Proposals # 4418405
Carrying out fire-retardant treatment of wooden roof structures of buildings on objects
Carrying out fire-retardant treatment of wooden roof structures of buildings on objects
| Current | PAO "ChMK" | 27.04.2026 12:00 |
Request for Proposals # 4418911
Performing work on the repair of the smoke pump
Performing work on the repair of the smoke pump
| Current | PAO "ChMK" | 27.04.2026 12:00 |
Request for Proposals # 4404644
... Expand
Execution of works at the capital construction facility "TSVs. Construction of a make-up water pipeline from N/S No. 14 to N/S No. 13"
Laying of the make-up pipeline, installation of pipeline foundations, perform supporting structures for the make-up conduit Ø530, a platform for servicing and opening the valve Collapse
| Current | PAO "ChMK" | 24.04.2026 13:00 |
Request for Proposals # 4413538
Tires
Passenger tire 205/65 R16 without camera summer
Passenger tire 185/65 R15 without camera summer
Light truck tire 185/75 R16C without camera all-season
| Current | PAO "ChMK" | 23.04.2026 10:00 |
Request for Proposals # 4416546
Section of the water heater PV1-273x4-
G(N)-1,0-20,56- T GOST27590-2005
Section of the water heater PV1-273x4-
G(N)-1,0-20,56- T GOST27590-2005
| Current | PAO "ChMK" | 23.04.2026 10:00 |
Request for Proposals # 4404438
SAW BLADES of cold cutting F710 mm_ 2026g. (ACCORDING TO the Technical Specification!!!!)
| Current | PAO "ChMK" | 22.04.2026 17:00 |
Request for Proposals # 4366793
Overhaul of turbine and generator of turbogenerator No. 2 (2 items)
Overhaul of turbine and generator of turbogenerator No. 2
| Current | PAO "ChMK" | 22.04.2026 15:00 |
Request for Proposals # 4410737
Execution of work on the mode adjustment of the boiler DKVR 20*13
Execution of work on the mode adjustment of the boiler DKVR 20*13
| Archived | PAO "ChMK" | 21.04.2026 12:00 |
Request for Proposals # 4410744
Performing maintenance and repair of TRZHK-5 and TRZHK-3
Performing maintenance and repair of TRZHK-5 and TRZHK-3
| Archived | PAO "ChMK" | 21.04.2026 12:00 |
Request for Proposals # 4408867
Synthetic lubricant
according to the terms of reference
| Archived | PAO "ChMK" | 21.04.2026 10:00 |
Request for Proposals # 4374663
Spare parts of working cages of the line of thermal hardening CL-215 (mill 300-2)_2026 year
Spare parts of working cages of the line of thermal hardening CL-215 (mill 300-2)_ 2026
| Archived | PAO "ChMK" | 16.04.2026 17:00 |
Request for Proposals # 4388124
Chemical reagents and laboratory utensils
Chemical reagents and laboratory utensils
| Archived | PAO "ChMK" | 16.04.2026 12:00 |
Request for Proposals # 4405455
Performing work on the repair of the smoke pump
Performing work on the repair of the smoke pump
| Archived | PAO "ChMK" | 16.04.2026 12:00 |
Request for Proposals # 4396571
... Expand
Examination of industrial safety of technical devices of hazardous production facilities of PJSC "CHMK" (4 items)
Examination of industrial safety of technical devices of hazardous production facilities of PJSC "CHMK" (4 items) Collapse
| Archived | PAO "ChMK" | 15.04.2026 14:00 |
Request for Proposals # 4390047
Execution of work on commissioning of boilers DE 10 * 14 in the boiler room
Execution of work on commissioning of boilers DE 10 * 14 in the boiler room
| Archived | PAO "ChMK" | 15.04.2026 12:00 |
Request for Proposals # 4401267
... Expand
A4 office paper, 80 g/m2, 500 l., grade A/B/B+, CIE 153% for one-sided and two-sided printing at speeds up to 100 copies per minute according to the Technical Specification
A4 office paper, 80 g/m2, 500 l., grade A/B/B+, CIE 153%, thickness from 104 microns and above, opacity not less than 91%, for one-sided and two-sided printing at speeds up to 100 copies per minute according to the Technical Specification Collapse
| Archived | PAO "ChMK" | 15.04.2026 08:00 |
Request for Proposals # 4397505
SECTION PV1 273x4-G-1,6-20,56- T GOST27590-2005
SECTION PV1 273x4-G-1,6-20,56- T GOST27590-2005
| Archived | PAO "ChMK" | 14.04.2026 10:00 |
Request for Proposals # 4397459
Performing maintenance and repair of TRZHK-5 and TRZHK-3
Performing maintenance and repair of TRZHK-5 and TRZHK-3
| Archived | PAO "ChMK" | 13.04.2026 12:00 |
Request for Proposals # 4397480
Execution of work on the mode adjustment of the boiler DKVR 20*13
Execution of work on the mode adjustment of the boiler DKVR 20*13
| Archived | PAO "ChMK" | 13.04.2026 12:00 |