Production, installation and subsequent dismantling of facade banners under the campaign of loyalty for the period October 2019 - January 2020 188 objects, for chain stores "Magnet"
Production, installation and subsequent dismantling of facade banners under the campaign of loyalty for the period October 2019 - January 2020 188 objects, for chain stores "Magnet" See procurement items and procurement documents for more details.Collapse
OKPD2 category:
Show all (2 more)
18.12.12 Услуги по печатанию торгово-рекламных каталогов, проспектов, плакатов и прочей печатной рекламной продукции
18.12.19 Услуги печатные прочие, не включенные в другие группировки
18.12.12.000 Услуги по печатанию торгово-рекламных каталогов, проспектов, плакатов и прочей печатной рекламной продукции
58.19.15 Материалы торгово-рекламные, каталоги торговые и аналогичная издательская продукция печатная
58.19.15.000 Материалы торгово-рекламные, каталоги торговые и аналогичная издательская продукция печатная
Bidders can submit their proposals for certain lots of the call for bids, but necessarily for all the items within a selected lot
:
Not applicable. Proposal shall cover all the items of the selected lots
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
10 minutes
Payment terms:
100% post-payment, deferred payment 60 calendar days
Delivery terms:
Delivery by the Supplier to the outlets of the company (list of addresses is specified in the procurement documents, procurement positions)
The bidder may repeatedly improve its price offer until the end of submission of bids.
Only one legal entity may participate in the tender procedure from a group of affiliated (related) companies. The other is considered as a restriction of competition and is the basis for withdrawal from the competition of all affiliated participants.
For all questions of free participation in this trading procedure, please contact B2B-center specialists by phone. :: (495) 989-85-19 ext. 7610, 7620, as well as to submit requests for clarification of the technical part to the Customer through the functionality of ETP B2B in the section of the relevant procedure.
This procedure of request for proposals is not an auction or a tender, does not fall under the scope of Art. 447-449 of the Civil Code of the Russian Federation and does not entail the occurrence of legal obligations at the Customer's choice supplier.
PAY ATTENTION TO:
• For each object you will need to provide a scanned copy of the certificate (with all the seals).
Attach to this copy a sample of 5*5 cm hard-to-flammable cloth placed on the GM and hand it over to the GM Director when performing the work.
• It will be necessary to provide (to us in the Civil Code) a certified copy of the original certificate.
• Also, at each site, it will be necessary to sign the ACP, which will indicate the following:
1. Structures on which exchanged hard canvas.
2. Who, when and to whom the sample with a copy of the certificate was handed over to the GM.
PAY ATTENTION TO:
Upon installation, several GM from AP will be selected for the inspection of the canvas.
If, during the inspection of the Ministry of Emergency Situations it is revealed that the banner placed by you from the usual canvas, the payment of the penalty will be in the area of your responsibility:
• at the first check of the Ministry of Emergency Situations — a fine from 150 000 to 200 000 rubles.
• in case of repeated inspection of the Ministry of Emergency Situations and not eliminated violation — a fine of up to 700 000 rubles.
• at the third check of the Ministry of Emergency Situations — suspension of activity of object till 90 days.
In this case, you will be required to compensate the damage incurred by JSC "Thander" during the suspension of GM operation.
IMPORTANT:
1) Prices must be provided for ALL positions! If any positions are not filled, or filled with not a specific figure - KP is not accepted for consideration.
2) If you work with VAT - must be filled in both columns (excluding VAT and VAT 20%). If you work on USN, only the first column (excluding VAT) is filled, the second one remains empty.
When calculating, where in the colon "Name of position" specified - light boxes, we make a translucent banner G1 and take into account when launching the dismantling of the banner with the action, the subsequent installation of the image back.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.