Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Alternative bids
Alternative bid is a bid, of which the terms and conditions differ from those established in the bid-related documents.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Contract performance security:
не требуется
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
Date of work February-March 2020
The address of the work is Samara Region, Volzhsky District, town. Building ceramics
It is necessary to provide the cost, taking into account the special. equipment and development PPR, indicate the number of days
1. Scope of works on installation and commissioning of the Equipment: assembly of metal structures of the bridge of the lifting structure, the installation of electrical equipment, a load-gripping body (grab), commissioning of the lifting structure; acceptance tests (external inspection, static tests, running in without load, dynamic tests).
2. The result of the Work will be the achievement after the full technical inspection of the lifting structure of the results of the technical examination within the limits established by the operating manual of the lifting structure and other regulatory legal acts.
3. Perform all work according to the PPR to the Buyer. Carry out all types of work, connections and approvals in accordance with the Building Standards and Rules, and supervise the work.
4. control weights for static and dynamic tests, as well as the necessary slings are provided by the Buyer
5. dismantling work scope: disconnecting the crane from power, dismantling the control cabinet, cab, grab, truck, crane bridge and end beams.