Request for Proposals No. 1399639 
The provision of transport services on the well construction sites LLC "UK" Tatburneft ".

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

The provision of transport services on the well construction sites LLC "UK" Tatburneft ".
According to specification

OKPD2 category:
Quantity:1 Условная еденица
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:09.12.2019 12:00
Bids opening date:10.12.2019 12:00
Last edited:03.12.2019 11:40
Organizer (Initiator):"UK "TATBURNEFT'" OOO
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:1. Payment for services is made by transferring funds to the Customer's bank account no later than 90 days after the signing of the rendered services (works), invoices, preparation of transport documents, Receipt confirming the amount of services rendered and Reconciliation acts. Primary documents provided by the Contractor to the Customer no later than the 5th day of the month following the reporting one. The Customer is obliged to consider the Contractor documents (invoices, certificates of rendered services and transport documents, bills of lading confirming the volume of services provided) within 10 (ten) days of receipt of original invoices, certificates of completion, primary documentation.
Delivery terms:Construction objects wells LLC "UK" Tatburneft "in the Perm region.

1. Available shall be all the necessary permits, licenses, and certificates for service provision.
2. The presence of the required number of serviceable equipment to eliminate downtime in emergency situations-terrain transportation, hoisting machinery, welding equipment (arches and so forth.) Gruzoperevozyaschaya machinery, tractor, earth moving machines, polyurethane, transport services to provide passenger equipment, services specialized road construction equipment, for permits to passage bulky and heavy machinery specialized equipment services (cementing units, trailers, acid units).
3. Availability of production branches of the claimed region.
4. The possibility of simultaneous sets of special equipment for dismantling, transportation, installation of drilling rigs, drilling crews crossings on single request.
5. Willingness to conclude a contract for the provision of transport services to all conditions of the Customer.
Georeferencing:423450, Russia, Republic of Tatarstan (Tatarstan), Almetyevsk, Musa Jalil str., 51
Comments:
PROPOSALS MADE NO OFFER TO company letterhead signed by the head WILL RECEIVE NO !!!

For technical questions contact: Tahirov RS Head of the Logistics Department of Transport (8553) 38-92-50, 7-927-419-06-17

1. Provision of transport services with driver.
2. Contractor shall at his own expense and on their own to ensure the installation of the "tools" of satellite control, logistics OOO "UK" Tatburneft department "(3 workstations on the written instructions of the Customer) own transport, as well as Subispolnitelya and / or leased performing work at customer sites in "on-Line" mode as well as in the log mode. Information satellite based navigation must comply with the established technical requirements of the Customer.
3. For the provision of transport services to ensure the availability of drivers proper documentation (waybills, permits, certificates, permits for transportation of oversized and heavy cargo).
4. NIC provides a range of services in full and subject to the conditions stipulated in the Agreement.
5. Ensure compliance with the legislation on protection of mineral resources, the environment, natural resources, safety rules in the oil and gas industry, traffic regulations in the operation of machinery.
6. Serve Client requests to perform a technically perfect technique to ensure completeness machinery according passport data and complete with clamping circuits for securing cargo.
7. To provide services under this agreement to acquire the necessary approvals and permits, including one-time for transportation and towing of oversized and heavy cargo on the right of way on the roads at their own expense;
8. The Contractor shall be liable to the Client, set the documents listed above in the form of fines and compensation for the damages, provided that the customer bring the content of these requirements to the Contractor. The application of penalties are made on a differentiated scale Customer applicable to companies providing transportation services for transportation of drilling equipment loads.
9. The Contractor shall be to the Customer responsible for violations of occupational safety, industrial safety and environmental protection, as well as minimum requirements for Health, Safety and Environment for short-term contracts in the amounts established a differentiated scale of the Customer construction of wells, applied to companies providing transport services;
10. In the case of non-compliance with traffic route equipment, provided for in the scheme issued by the Customer driveways Contractor shall be liable for damages and violation of land legislation in front of the land user;
11. The provision of services at existing wells, in case of approval by the Contractor's fault established bilateral act, accident, including in a traffic accident that resulted in injury to an employee of the Customer, the Contractor shall pay the Client a penalty of: in an accident with an easy outcome of 100,000 (one hundred thousand), in case of accident with severe outcome or group accident 250 000 (two hundred and fifty thousand) rubles, besides for causing each employee at fault of injury of any severity, Artist pays customer a penalty in the amount of 500,000 (five hundred thousand) rubles 00 kopecks for each employee.
For the death of every employee of the Customer due to the fault of the Contractor, the Contractor pays the Customer a penalty in the amount of 1,000,000 (one million) rubles and 00 kopecks for each employee;
In case of approval by the Contractor's fault, set two-sided act of the incident, fire or other emergency that resulted in material costs of the Customer, the Contractor shall pay the Client a penalty of: 100,000 (one hundred thousand), if the amount of material of the Customer costs did not exceed 1,000,000 (one million) rubles and 200 000 (two hundred thousand), if the amount of material of the Customer costs will exceed 1,000,000 (one million) rubles. In the case of this agreement the Customer detection to production facilities of the Contractor personnel of alcohol, drugs or toxic substances, to bring them into the territory of the object substances of the above condition, with the exception of substances permitted for use in the construction of wells, the Contractor shall pay the Client a penalty of 50 000 (fifty thousand) rubles for each case;
12. In the event of the customer's premises Contractor's employees performing work without the appropriate PPE, the Customer shall pay for each detected violation of a fine of 90 000 (ninety thousand) rubles for each case;
13. In case of failure to follow instructions "Transport Security", the Customer shall pay for each detected violation of a fine of 70 000 (seventy thousand) rubles for each case;
14. In case of concealment by the Contractor from the Employer accidents facts, an accident in the production of the contractual scope of work, or notice a delay of more than 24 hours from the time an event is detected, the Contractor shall pay to the Customer for each such fact a fine of 70 000 (seventy thousand) rubles for each such happening;
15. In the case of breaking the support, breakage of power transmission line, mechanical damage pipelines steaming risers and underground utilities, and other incidents and accidents on power facilities objects (touch poles and transmission line conductors, impact on KTP and so forth. Energy economies objects) leading to shutdown of power consumers / damage of power, occurred through the fault of the Contractor at the facilities and mountain bends Customer, Customer shall pay for every such fact fine, except for certain payments related to direct and indirect losses from the Customer about this came up out on every fact of collision / touch / break, in the amount of 120 000 (one hundred twenty thousand) rubles for each case;
16. For each fact of damage, malfunction, or other actions employees of the Carrier that resulted in disruption of the functioning of the Customer equipment, namely damage to the gate, locking devices, fences, barriers, signs, labels, outdoor lighting equipment and security equipment, in the amount of 100 000 ( one hundred thousand) rubles for each case;
17. The damage caused by the Customer's property, and the environment caused during the performance of work (providing services) under the contracts, and upon written request of the Customer shall pay the amount of the fine in the amount of 300,000 (three hundred thousand) rubles for each case;
18. Upon arrival, transport loading and unloading is performed for 4 hours, in compliance with the time interval of arrival and departure of the vehicle.
19. Contractor shall take loads from the Customer, trailers, semitrailers and ensure their safe transportation according to customer requests, in an amount and nomenclature used with a parameter (category, dimensions, weight), in accordance with the traffic overhead. Insure vehicles to tow trailers, semitrailers carriage according to claim 7 of Article 4 of the Federal Law of 25.04.2002 years, with the introduction in the pole mark "The vehicle used trailer" as well as to ensure the integrity of the registration documents, registration marks, and the safety of cargo in the way in the presence consignment notes (TTH) and the signature of the driver in the bill of lading (TTH), since its acceptance by the shipper and to the transfer of the consignee.
20. Contractor shall at his own expense and on their own to ensure the sustainability and linkages of bulky and / or heavy loads Customer serviceable special rigging chains, avoiding unproductive vehicle downtime.
21. In case of damage of the transported equipment of the Customer due to the fault of the Contractor and arising in connection with this idle (unproductive work) units, Customer teams, Customer shall be entitled during the period of inactivity set the penalty in the amount of the value of the cost of downtime (unproductive work) drilling rig (for BU type) based on the cost of one hour of downtime. In addition, the Contractor shall reimburse the cost of repairing the damaged equipment on the basis of documents confirming the customer's costs.
22. Transfer to the transport of goods for registration of shipping documents with the signature of the driver, upon presentation of the latest document proving his identity and waybill, certified by the enterprise stamp.
23. Contractor will provide stamped in special permits for movement by road vehicle performing the transport of heavy and (or) large-sized cargoes, marks on the shipment of cargo (in the appropriate column of the special permit specified shipping date, details of the consignor, shall be signed by the responsible person and stamp of the organization).
24. In case of failure to provide and / or timely provision of incomplete vehicles services (vehicle failure on the customer's site, untimely departure of the vehicle, etc.) upon occurrence of a bilateral act drawn up between the customer and the supplier, on the basis of which the customer has the right to present executor penalties:
but). in the case of vehicles of vehicles delayed or incomplete provision of services on-demand artist Customer shall pay a fine in the amount of 30 000 rubles for each hour of downtime for the vehicle concerned;
b). In addition to the Customer shall reimburse the Contractor damages arising as a consequence of poor performance of the services provided on the basis of supporting documents for losses or foregone revenue.
25. Artist must provide equipment and provided on a driving structure for the admission pass on the customer objects (for neo
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0