Request for Proposals No. 2710050 
Design and estimate documentation and installation according to the design of the Lestransservice heating system and SHRU shop

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
26  Оборудование компьютерное, электронное и оптическое
62  Продукты программные и услуги по разработке программного обеспечения; консультационные и аналогичные услуги в области информационных технологий
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:13.07.2021 11:00
Last edited:06.07.2021 09:52
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In a Commercial Offer
Delivery terms:1. Application of EPM-NEZ JSC, g. Novocherkassk

2. Purpose of work
2.1. Develop design and estimate documentation and work on transferring the heating system of Lestransservice LLC and SHRU shop from steam heating to hot water heating.
2.2. The heating system currently uses steam from the central boiler room.
2.3. The following results are to be obtained from the design:
- The use of steam heating should be completely eliminated;
- The heating scheme should be upgraded to connect to the central heating system from the EPM-NEZ boiler room.
- Provide heating of grid water with an external gas boiler.
- The project has been evaluated.
2.4. The heating system is installed and installed.
2.5 The heat curtain curtain of the curtain gates has been installed.

4. Room Settings
Room parameters are proposed to be taken from TC project 010.12456

5. Work Deadlines
5.1. Project estimates
Start work 02.08.2021
Completion of work 01.11.2021
5.2. Timeline of acquisition of materials and equipment
Start work 02.11.2021
Completion of work on April 18, 2022
5.3. Installation time
Start work on 18.04.2022
Completion of work 01.08.2022

6. Materials, machinery, equipment and tools provided by the Contractor.
6.1 The works are done from the artist's material.
6.2 The lifting mechanisms (car lift) are provided by the performer.
6.3 The performance tool is provided by the performer.

7. Requirements for the composition of design and estimates:
7.1 Design documentation for composition, volume and quality shall be satisfactory to the Customer's interests and are designed in accordance with existing building codes and regulations, technological standards RF design
7.2 Explanatory Note (PH);
7.3 Information on engineering, engineering networks, list of engineering activities, content of process solutions (IOS) with subsections, and conduct verification calculations:
7.4 Process solutions for the selection of equipment with questionnaires;
7.5 Construction estimates
7.6 The Contractor presents a set of design documentation in three copies on paper, one in dwg format (for drawings) and DOC (for documentation) on electronic media.
7.7. The design work is considered to be fully completed after the Parties signed the Design Estimated Documentation Acceptance Act.

8. Performer Requirements
8.1. The performer must have the necessary production and human resources to carry out the work and be a member of a self-regulatory organization (SRO).
8.2. To clarify the conditions of performance, familiarize with the object it is advisable to arrive at the Contractor's representatives to the Customer.
8.3 The Contractor, in his business offer, specifies the payment procedure and other terms and conditions.

9. Work Conditions
9.1 Working in a current enterprise.
9.2 The development of APR or PPRC is carried out by the Contractor.
9.3 Warranty period 24 months.

10. Payment Terms
10.1 In a commercial offering.

11. applications
11.1 Attached to the technical task is a list of documents required for the design of the attire - tolerances at the enterprise, Annex 1
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who has taken part in the procedure (making an offer) is required to upload the following documents to the system before the deadline for the application deadline:
1. Charter (with all additions and modifications if there were any).
2. Certificate of State Registration.
3. Tax Accounting Certificate.
4. Extract from EGRUL.
5. The balance sheet as of the latest reporting date with the tax authority's acceptance mark.
6. Documents confirming the representative's signature credentials:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see Proposal file)
8. Contact Persons: Chief Energy Engineer — Vitaly Fateyev
tel 8 (8635) 29-44-83 VFateev@energoprom.ru
Leading Energy Engineer — Sergei Malyshev
tel 8 (8635) 29-44-83 SMalyshev@energoprom.ru
Leading Energy Engineer — Alexander Vorotyntsev,
tel 8 (8635) 29-43-94 AVorotyncev@energoprom.ru
Senior Master of Equipment Repair — Alexander Kononov,
tel 8 (8635) 29-47-34 AKononov@energoprom.ru
9. ISO 9001:2008 Certificate of Compliance (if available)
This request is not a notice of a contest or auction and does not give any rights to the participants, and does not entail any duty other than expressly specified in the notice.
10. Performer Requirements:
— Permissive documents (SRO, licenses, tolerances)
— Development by the PPR, PRC, RTI.
— Certification of supervisor, ITR, industrial safety workers at the GOPO.
— Medical admission of staff to work at GOPO.
—The Contractor must provide the Customer with the following documents before the work permit is issued: copies of documents confirming the presence of the occupational health service and/ or occupational health professional (contracting order, occupational safety certificate) or having a contract with an accredited organization in the field of delivery health services.
A commercial offer is REQUIRED to consider the application.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 12.10.2021 at 14:30
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 2. More >>