Request for Proposals # 4274719
... Expand
Accreditation of suppliers for CMM (category: Filters)
Accreditation of suppliers for CMM (category: Filters) for the entire Mangazeya Mining Group.
After the procedure, Accredited Suppliers will be invited to the Mangazeya Mining CIM on the B2B platform. Collapse
| Current | MANGAZEYA MINING LLC | 26.12.2025 12:00 |
Request for Proposals # 4277261
Accreditation and selection of cutting tool suppliers with fixed prices for 2026
Accreditation and selection of cutting tool suppliers with fixed prices for 2026
| Current | MANGAZEYA MINING LLC | 26.12.2025 12:00 |
Request for Proposals # 4269762
Shield (Cabinet) SHK 100
Shield (Cabinet) SHK 100
| Current | MANGAZEYA MINING LLC | 25.12.2025 15:00 |
Request for Proposals # 4266565
Drying cabinet (pos.10.2)
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 25.12.2025 12:00 |
Request for Proposals # 4268746
Execution of a complex of works on the repair of premises at the address Chita, 75 Anokhina str.
Execution of a complex of works on the repair of premises.
| Current | MANGAZEYA MINING LLC | 25.12.2025 12:00 |
Request for Proposals # 4266216
Crusher (KMD) (pos.3.2.1)
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 25.12.2025 08:00 |
Request for Proposals # 4266236
High-frequency rumbling (pos.2.4.1)
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 25.12.2025 08:00 |
Request for Proposals # 4276884
... Expand
execution of preliminary (area) engineering-geological and engineering-geodetic surveys as part of the development of documentation for the facility:
"Construction of a gold recovery plant for processing ores of the Itakinskoye deposit with a production capacity of 500 thousand tons per year"
execution of preliminary (area) engineering-geological and engineering-geodetic surveys Collapse
| Current | MANGAZEYA MINING LLC | 24.12.2025 14:00 |
Request for Proposals # 4275478
Performing a full range of repair work on the transformer TMG 100060.4 kV in the village of Baley, Trans-Baikal Territory.
Performing a full range of repair work on the transformer TMG 100060.4 kV according to the Requirements Specification.
| Current | MANGAZEYA MINING LLC | 24.12.2025 12:00 |
Request for Proposals # 4274020
... Expand
Repair and diagnostics of mining equipment components and assemblies
- Caterpillar Bulldozers;
- Bulldozers, Komatsu excavators;
- Graders, loaders SEM;
- FlexiROC drilling rigs;
- Hitachi excavators;
- Excavators, LiuGong loaders;
- Shehwa Bulldozers;
- Dump trucks are quarry Tonly. Collapse
| Current | MANGAZEYA MINING LLC | 24.12.2025 08:00 |
Request for Proposals # 4266706
Filling stations
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 23.12.2025 12:00 |
Request for Proposals # 4272746
Determination of useful components in prepared (worn) samples of external geological control
Determination of useful components in prepared (worn) samples of external geological control
| Current | MANGAZEYA MINING LLC | 23.12.2025 12:00 |
Request for Proposals # 4273836
Ventilation equipment
Ventilation equipment
| Current | MANGAZEYA MINING LLC | 23.12.2025 12:00 |
Request for Proposals # 4266384
Induction furnace (item 10.5)
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 22.12.2025 12:00 |
Request for Proposals # 4266465
Stationary conveyor belt
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 22.12.2025 12:00 |
Request for Proposals # 4268229
Other MTR (bends, pipe fittings metal, etc.)
Procurement under the project "Mining and Processing plant based on the Taseevskoye gold deposit. I queue. Technological complex. Tail economy. Infrastructure complex"
| Current | MANGAZEYA MINING LLC | 22.12.2025 12:00 |
Request for Proposals # 4270453
... Expand
Accreditation of Suppliers of petroleum products for
LLC "State Enterprise named after D.S.Kosyan" and LLC "IZK"
When drawing up a commercial proposal, it is necessary to strictly observe all the points of the Requirements Specification and confirm the possibility of their execution, otherwise, the Commercial Proposal will not be admitted for consideration. Collapse
| Current | MANGAZEYA MINING LLC | 19.12.2025 12:00 |
Request for Quotations # 4263675
... Expand
ADCR electric motors. The customer is LLC "State Enterprise named after D.S. Kosyan" (DCUT-002036).
"BE SURE" to get acquainted with the comments of this process.
Electric motor ADCR280M6 B1V0F U2 90/985 - 1 pc.
Electric motor ADCR355M6 F2-V2-IP55-U2 200/990 - 1 pc. Collapse
| Archived | MANGAZEYA MINING LLC | 18.12.2025 18:00 |
Request for Proposals # 4275562
... Expand
execution of preliminary (area) engineering-geological and engineering-geodetic surveys as part of the development of documentation for the facility:
"Construction of a gold recovery plant for processing ores of the Itakinskoye deposit with a production capacity of 500 thousand tons per year"
execution of preliminary (area) engineering-geological and engineering-geodetic surveys Collapse
| Archived | MANGAZEYA MINING LLC | 18.12.2025 12:01 |
Request for Proposals # 4264901
... Expand
Execution of a complex of geological exploration works:
1) Performing geological exploration drilling operations at the Nasedkino gold deposit.
2) Performing geological support of drilling operations at the Nasedkino gold deposit.
3) Performing work on sample preparation (crushing, abrasion) of core samples for analytical work.
4) Performing laboratory and analytical work.
5) Performing hydrogeological studies at the Nasedkino gold deposit.
Execution of a complex of geological exploration works. Collapse
| Archived | MANGAZEYA MINING LLC | 18.12.2025 12:00 |