Request for Proposals # 4275693
... Expand
Inspection, diagnostics and testing of frequency converters ABB series ACS 800 for the project "KO 35" Korkino Branch LLC "SLK Cement".
Inspection, diagnostics and testing of frequency converters ABB series ACS 800 for the project "KO 35" Korkino Branch LLC "SLK Cement". Collapse
| Current | OOO "SLK СEMENT" | 26.12.2025 12:00 |
Request for Proposals # 4270968
... Expand
Selection and supply of flame retardant materials in accordance with the Requirements Specification.
To provide the required limits of fire resistance of building structures of buildings and structures as
part of the project "New dry firing line KO35".
In accordance with the terms of reference, to carry out a project on fire protection of building structures, to ensure the supply of materials of fire-retardant materials.
The details are reflected in the Requirements Specification and the appendix.
Metal volume, ≈ 4000 tons ≈ 120 000 m2
Selection and supply of flame retardant materials in accordance with the Requirements Specification.
Metal volume, ≈ 4000 tons ≈ 120 000 m2 Collapse
| Current | OOO "SLK СEMENT" | 25.12.2025 10:00 |
Request for Proposals # 4251117
... Expand
Development of a 3D model of the production line with a degree of detail LOD400
1. Development of a 3D model of a cement production line with a level of detail LOD400.
2. Coordination of the 3D model with the customer and the designer of the KO-35 line.
3. Transfer of the developed documentation to the customer.
The details are reflected in the Requirements Specification. Collapse
| Current | OOO "SLK СEMENT" | 23.12.2025 10:00 |
Request for Proposals # 4264572
Manufacture, supply and installation of a prefabricated building (hangar) for storage of equipment.
Manufacture, supply and installation of a prefabricated building (hangar) for storage of equipment.
| Archived | OOO "SLK СEMENT" | 19.12.2025 12:00 |
Request for Proposals # 4243871
... Expand
Design, manufacture and supply of louver dampers.
In accordance with the Requirements Specification, design, manufacture and supply of a louvered, sealed flap equipped with momentary limit switches and open-closed end positions. The equipment is supplied complete. Quantity -4 pcs. Collapse
| Archived | OOO "SLK СEMENT" | 03.12.2025 12:00 |
Request for Proposals # 4206529
... Expand
Nozzle cup sealing ring 30.2*3 D12A/C 20536487 24pcs
Nozzle VOLVO LNG 23046075 12 pcs
Nozzle sleeve 22919949 12 pcs
Flange bolt M10x50x1.5 VOLVO 21344774 12 pcs
Nozzle cup sealing ring 30.2*3 D12A/C 20536487 24pcs
Nozzle VOLVO LNG 23046075 12 pcs
Nozzle sleeve 22919949 12 pcs
Flange bolt M10x50x1.5 VOLVO 21344774 12 pcs Collapse
| Archived | OOO "SLK СEMENT" | 03.12.2025 00:00 |
Request for Proposals # 4242896
Inter-chamber partition CM f4.0x13.5
quantity 2 pcs.
Inter-chamber partition CM f4.0x13.5
| Archived | OOO "SLK СEMENT" | 28.11.2025 14:30 |
Request for Proposals # 4222429
Inspection and diagnostics of MSS engine control cabinets for the KO 35 project Korkino
Branch of SLK Cement LLC.
Inspection and diagnostics of MSS engine control cabinets for the KO 35 project Korkino
Branch of SLK Cement LLC.
| Archived | OOO "SLK СEMENT" | 28.11.2025 14:00 |
Request for Proposals # 4223867
... Expand
Inspection, diagnostics and testing of frequency converters ABB series ACS 5060 for the project "KO 35" Korkino Branch LLC "SLK Cement".
Inspection, diagnostics and testing of frequency converters ABB series ACS 5060 for the project "KO 35" Korkino Branch LLC "SLK Cement". Collapse
| Archived | OOO "SLK СEMENT" | 28.11.2025 12:00 |
Request for Quotations # 4227230
Services for testing the quality of packaging materials MKR and stretch film for the needs of the production of LLC "SLK-Cement" branch "Sukholozhskcement"
| Archived | OOO "SLK СEMENT" | 27.11.2025 12:00 |
Request for Proposals # 4233848
Execution of construction and installation works on the territory of the Korkino branch of SLK Cement LLC.
Execution of construction and installation works on the territory of the Korkino branch of SLK Cement LLC.
| Archived | OOO "SLK СEMENT" | 26.11.2025 12:00 |
Request for Proposals # 4235051
Clearing the area of fallen trees along the construction site.
In accordance with the terms of reference, it is necessary to carry out a complex of sawing and cleaning of the territory from fallen trees along the construction site.
| Archived | OOO "SLK СEMENT" | 19.11.2025 12:00 |
Request for Proposals # 4207419
... Expand
Lighting engineering; Electrical installation equipment; Industrial electrical equipment; Security systems and Structured cabling systems; Cable-carrying systems (Metal/PVC); Hardware; Mounting foam; Sealant; Clamps; Cable ties;
Supply of electrical equipment for the needs of LLC "SLK Cement" branches: Korkino (Pervomaisky settlement); Sukhoi log; Omsk. Collapse
| Archived | OOO "SLK СEMENT" | 07.11.2025 12:00 |
Request for Proposals # 4195284
... Expand
Development of estimated documentation for the project.
In accordance with the terms of reference, it is necessary to carry out a set of works on the development of the LSR and SSR sections of the RD in two stages:
I – according to the currently completed sections of the taxiway;
II – as soon as the missing sections of the taxiway are ready. Collapse
| Archived | OOO "SLK СEMENT" | 29.10.2025 12:00 |
Request for Proposals # 4202332
Feeder plate PP2.06.00.001 in the number of 90 pcs.
Feeder plate PP2.06.00.001
| Archived | OOO "SLK СEMENT" | 28.10.2025 08:00 |
Request for Proposals # 4147614
... Expand
Execution of a set of automated process control system works for the existing crushing line and for the existing grinding line as part of the project automation. Korkino branch of SLK Cement LLC in the Chelyabinsk region, Pervomaisky settlement.
In accordance with the terms of reference, it is necessary to carry out a set of works (development of working documentation, supply of equipment, EMR, NDT and development of PPO) on the existing crushing line and cement grinding line Collapse
| Archived | OOO "SLK СEMENT" | 17.10.2025 12:00 |
Request for Proposals # 4188989
... Expand
Development of CD and RD of the limestone flow distribution filling unit after the existing limestone conveyor belt B-1200 for the KO 35 project, Korkino Branch of SLK Cement LLC.
Development of CD and RD of the limestone flow distribution filling unit after the existing limestone conveyor belt B-1200 for the KO 35 project, Korkino Branch of SLK Cement LLC. Collapse
| Archived | OOO "SLK СEMENT" | 17.10.2025 12:00 |
Request for Proposals # 4192076
... Expand
Design, manufacture and supply of conveyor belt scales for the conveyor belt (05.05.01)
LLC "SLK Cement" in the Chelyabinsk region, Pervomaisky
It is necessary to carry out the design, manufacture and supply of conveyor belt scales. The equipment is a weighing system mounted on a conveyor belt located in a gallery - unheated and closed from precipitation. Collapse
| Archived | OOO "SLK СEMENT" | 15.10.2025 12:00 |
Request for Proposals # 4163047
... Expand
Delivery of bearings to the plants of LLC "SLK Cement" for the period 2024-2026 An approximate list of purchased bearings is in Appendix No. 8 to this request.
Delivery of bearings to the plants of LLC "SLK Cement" for the period 2024-2026 An approximate list of purchased bearings is in Appendix No. 8 to this request. Collapse
| Archived | OOO "SLK СEMENT" | 07.10.2025 14:00 |
Request for Proposals # 4173795
... Expand
Nozzle cup sealing ring 30.2*3 D12A/C 20536487 24pcs
Nozzle VOLVO LNG 23046075 12 pcs
Nozzle sleeve 22919949 12 pcs
Flange bolt M10x50x1.5 VOLVO 21344774 12 pcs
Nozzle cup sealing ring 30.2*3 D12A/C 20536487 24pcs
Nozzle VOLVO LNG 23046075 12 pcs
Nozzle sleeve 22919949 12 pcs
Flange bolt M10x50x1.5 VOLVO 21344774 12 pcs Collapse
| Archived | OOO "SLK СEMENT" | 30.09.2025 06:00 |