Request for Proposals # 4377646
... Expand
Works on technical re-equipment of the 0.03 Mpa gas consumption network (underground laying of the gas pipeline) of the Korkino branch of SLK Cement LLC.
Works on technical re-equipment of the 0.03 Mpa gas consumption network of the Korkino branch of SLK Cement LLC. Collapse
| Current | OOO "SLK СEMENT" | 10.04.2026 10:00 |
Request for Proposals # 4377819
... Expand
Inspection and revision of the technological video surveillance system Teletrac, project "KO 35" Branch of Korkino LLC "SLK Cement".
Inspection and revision of the technological video surveillance system Teletrac, project "KO 35" Branch of Korkino LLC "SLK Cement". Collapse
| Current | OOO "SLK СEMENT" | 10.04.2026 10:00 |
Request for Proposals # 4381978
... Expand
Commissioning of engineering systems of the building of the administrative and household complex (ABC), on the territory of SLK Cement LLC, Korkino branch.
Carrying out the NDP of engineering systems of the ABC building, on the territory of LLC "SLK Cement", branch "Korkino". Collapse
| Current | OOO "SLK СEMENT" | 10.04.2026 10:00 |
Request for Proposals # 4379246
... Expand
Delivery of hopper weighing systems Korkino Branch of LLC "SLK Cement".
In accordance with the Requirements Specification and applications, it is necessary to develop weighing systems consisting of strain gauges, auxiliary mounting equipment and control systems, after agreeing on the documentation, to carry out the delivery of equipment Collapse
| Current | OOO "SLK СEMENT" | 08.04.2026 12:00 |
Request for Proposals # 4376584
... Expand
Engineering, manufacturing, supply, installation supervision and NDP of a Complete 6 kV switchgear, LLC "SLK Cement", Korkino branch
In accordance with the Requirements Specification and appendix., perform a set of works, incl. engineering design, production, delivery, NDP and SMR KRU 6 kV: 211RU1-6 kV furnace compartment/ST01A and 211RU2-6 kV furnace compartment /ST01B for power supply tech. firing lines. Collapse
| Current | OOO "SLK СEMENT" | 06.04.2026 12:00 |
Request for Proposals # 4376620
... Expand
Delivery of the plate heat exchanger of the circulating water supply system, LLC "SLK Cement", Korkino branch
In accordance with the Requirements Specification and appendices, to supply a plate heat exchanger with the provision of hydraulic diagrams and information on the connection dimensions Collapse
| Archived | OOO "SLK СEMENT" | 03.04.2026 12:00 |
Request for Proposals # 4366485
... Expand
Delivery, SMR and NDP of a complete chiller-draykuller, LLC "SLK Cement", Korkino branch
In accordance with the Requirements Specification and appendix., delivery, SMR and NDT, and commissioning of a complete chiller-draykuller are required. The equipment is a single building with a uniform. pipeline system, with the possibility of integration into the general dispatching of factory facilities Collapse
| Archived | OOO "SLK СEMENT" | 02.04.2026 12:00 |
Request for Proposals # 4376557
... Expand
Delivery of a hydraulic module for the circulating water supply system, LLC "SLK Cement", Korkino branch
In accordance with the Requirements Specification and appendices, to supply the hydraulic module with the provision of hydraulic and electrical circuits, as well as information on the connection dimensions. Collapse
| Archived | OOO "SLK СEMENT" | 02.04.2026 12:00 |
Request for Proposals # 4371181
... Expand
Design, manufacture, supply of the damper assembly of the base plate of the self-leveling roller station of the Polysius POLRO rotary kiln Korkino Branch of SLK Cement LLC.
In accordance with the Requirements Specification, it is required to develop a CD and manufacture a base plate damper assembly in accordance with agreed drawings, as well as supply ready-made equipment with the provision of technical documentation. Collapse
| Archived | OOO "SLK СEMENT" | 30.03.2026 12:00 |
Request for Proposals # 4387468
Delivery of a welding column for welding the joints of the furnace shells Korkino Branch LLC "SLK Cement".
It is required to install a welding column that meets the specified parameters for the large-node assembly of furnace shells
| Archived | OOO "SLK СEMENT" | 30.03.2026 12:00 |
Request for Proposals # 4357335
... Expand
Supply of potable water capacity,
ABC facility, SLK Cement LLC, Korkino branch
In accordance with the Requirements Specification and appendices, supply a potable water tank. With the delivery, a complete set of documentation for the equipment must be provided that complies with all applicable regulations, Fed.laws and legislation of the Russian Federation. Collapse
| Archived | OOO "SLK СEMENT" | 10.03.2026 12:00 |
Request for Proposals # 4333694
... Expand
Complex works: engineering, delivery of SMR and NDT frequency converters for the main drive of a 400 kW, 660 V rotary kiln, for the needs of the KO 35 project, Korkino Branch of SLK Cement LLC.
Complex works: engineering, delivery of SMR and NDT frequency converters for the main drive of a 400 kW, 660 V rotary kiln, for the needs of the KO 35 project, Korkino Branch of SLK Cement LLC. Collapse
| Archived | OOO "SLK СEMENT" | 06.03.2026 12:00 |
Request for Proposals # 4344055
... Expand
To ensure the collection and transportation of equipment from Turkey to Pervomaisky settlement (Chelyabinsk
region, Korkinsky district) using an efficient route.
Route:
Cargo pickup: FCA_ITOB Organize Sanayi Bölgesi 10006 Sk. No: 3 Menderes – Izmir / Türkiye
Delivery: Chelyabinsk region, Korkinsky district, Pervomaisky settlement, Zavodskaya str., 1.
Information about cargo spaces in the documentation.
Nature of cargo – equipment (valves)
Preliminary HS Code – 8481809907
To ensure the collection and transportation of equipment from Turkey to Pervomaisky settlement (Chelyabinsk
region, Korkinsky district) using an efficient route. Collapse
| Archived | OOO "SLK СEMENT" | 05.03.2026 10:00 |
Request for Proposals # 4332208
... Expand
Supply of potable water capacity, ABC facility, SLK Cement LLC, Korkino branch.
In accordance with the Requirements Specification and appendices, supply a potable water tank. With the delivery, a complete set of documentation for the equipment must be provided that complies with all applicable regulations, Federal Law.laws and legislation of the Russian Federation Collapse
| Archived | OOO "SLK СEMENT" | 24.02.2026 12:00 |
Request for Proposals # 4332242
... Expand
Delivery of a sewage pumping station, ABC facility, SLK Cement LLC, Korkino branch
In accordance with the Requirements Specification and the appendix, set up a CSC for lifting and pumping domestic wastewater on the on-site network of domestic sewage. Collapse
| Archived | OOO "SLK СEMENT" | 24.02.2026 12:00 |
Request for Proposals # 4332530
Delivery of a grease trap in the amount of 3 pcs., ABC facility, SLK Cement LLC, Korkino branch.
In accordance with the Requirements Specification and the annex, to supply a grease trap for wastewater treatment from fats and oils.
| Archived | OOO "SLK СEMENT" | 24.02.2026 12:00 |
Request for Proposals # 4318185
... Expand
Design, manufacture, supply and installation of a passenger elevator (without a machine room), g/n 1150 kg., for the building of the ABC Branch of Korkino LLC "SLK Cement".
Design, manufacture, supply and installation of a passenger elevator (without engine room), g/n 1150 kg., for the ABC building. Collapse
| Archived | OOO "SLK СEMENT" | 20.02.2026 10:00 |
Request for Proposals # 4290857
... Expand
Carrying out work on the enlarged assembly of the cylinder of the POLRO rotary kiln.
In accordance with the terms of reference, it is necessary to assemble and weld the cylinder shells of the POLRO furnace in compliance with the regulations from the manufacturer. Collapse
| Archived | OOO "SLK СEMENT" | 05.02.2026 12:00 |
Request for Proposals # 4306746
... Expand
Design, manufacture and supply of rotary shutter Korkino Branch LLC "SLK Cement". (item 5.27)
In accordance with the Requirements Specification to provide services for the design, manufacture and supply of a rotary shutter with an electric drive and a manual understudy. The shutter is installed on the flue for the possibility of shutting off the flow of hot gases. Collapse
| Archived | OOO "SLK СEMENT" | 05.02.2026 12:00 |
Request for Proposals # 4304250
... Expand
Rendering of project support services in terms of OPO III and IV hazard classes of LLC "SLK Cement", Korkino branch
In accordance with the Requirements Specification and appendices, to provide technological supervision services with respect to making changes to the list of information characterizing the OPO (gas supply systems). Collapse
| Archived | OOO "SLK СEMENT" | 30.01.2026 12:00 |