Request for Proposals # 4358714
Heat treatment of wagon wheels P3149
Heat treatment of wagon wheels P3149
| Current | PAO "ChKPZ" | 12.03.2026 12:00 |
Request for Proposals # 4359366
Manufacture of nylon products according to drawings (100 pcs.) trial batch
Manufacture of nylon products according to drawings (100 pcs.) trial batch
| Current | PAO "ChKPZ" | 12.03.2026 12:00 |
Request for Proposals # 4359371
Cutting teeth with grinding according to the technical specification (4 380 pcs)
Cutting teeth with grinding according to the technical specification (4 380 pcs)
| Current | PAO "ChKPZ" | 12.03.2026 12:00 |
Request for Proposals # 4356673
Purchase of a magnetic-ferrosonde control unit
Purchase of a magnetic-ferrosonde control unit
| Current | PAO "ChKPZ" | 11.03.2026 12:00 |
Request for Proposals # 4357156
Cutting of teeth with grinding according to technical specifications.
Cutting of teeth with grinding according to technical specifications
| Current | PAO "ChKPZ" | 11.03.2026 12:00 |
Request for Proposals # 4357185
Cementation with grinding and hardening
Cementation with grinding and hardening
| Current | PAO "ChKPZ" | 11.03.2026 12:00 |
Request for Proposals # 4350618
... Expand
The complex of construction and installation works on the installation of the ventilation and air conditioning system of the engineering building of PJSC "CHKPZ" at the address: Chelyabinsk, Gorelova str. 12
The complex of construction and installation works on the installation of the ventilation and air conditioning system of the engineering building of PJSC "CHKPZ" at the address: Chelyabinsk, Gorelova str. 12 Collapse
| Current | PAO "ChKPZ" | 10.03.2026 12:00 |
Request for Proposals # 4354687
Cementation and hardening with subsequent release of automotive component products
Cementation and hardening with subsequent release of automotive component products
| Current | PAO "ChKPZ" | 10.03.2026 12:00 |
Request for Proposals # 4354823
Manufacture of nylon products according to drawings (100 pcs.) trial batch
Manufacture of nylon products according to drawings (100 pcs.) trial batch
| Current | PAO "ChKPZ" | 10.03.2026 12:00 |
Request for Quotations # 4357658
Execution of construction and installation works on glazing of the lantern of shop No.29 of the blacksmith shop No. 30 (inv.No. 57)
| Current | PAO "ChKPZ" | 10.03.2026 10:00 |
Request for Proposals # 4359432
... Expand
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work!
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work! Collapse
| Current | PAO "ChKPZ" | 09.03.2026 12:45 |
Request for Proposals # 4359421
... Expand
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work!
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work! Collapse
| Current | PAO "ChKPZ" | 09.03.2026 12:40 |
Request for Proposals # 4359383
Rigging works (three shabots) in accordance with the Requirements Specification
Urgent work!
Rigging works (three shabots) in accordance with the Requirements Specification
Urgent work!
| Current | PAO "ChKPZ" | 09.03.2026 12:15 |
Request for Proposals # 4357552
Performance of works on painting of structures of metal shop No.29 of blacksmith shop No. 30 (inv.No. 57)
Performance of works on painting of structures of metal shop No.29 of blacksmith shop No. 30 (inv.No. 57)
| Current | PAO "ChKPZ" | 09.03.2026 10:00 |
Request for Proposals # 4347670
... Expand
The SMR complex for the installation of a ventilation and air conditioning system as part of the overhaul of the educational building of PJSC "CHKPZ" at the address: Chelyabinsk, Elektrostalskaya str., 47A
supply and exhaust ventilation
installation of ventilation
units installation of a ventilation chamber Collapse
| Current | PAO "ChKPZ" | 06.03.2026 13:00 |
Request for Quotations # 4349063
Installation of the foundation for coping tests of the absorbing apparatus in the MC-10 building (sewage treatment plants No. 10122)
| Current | PAO "ChKPZ" | 06.03.2026 10:00 |
Request for Proposals # 4347830
... Expand
Rendering of construction laboratory services at capital construction, reconstruction, and overhaul facilities of PJSC "CHKPZ".
Rendering of construction laboratory services at capital construction, reconstruction, and overhaul facilities of PJSC "CHKPZ". Collapse
| Current | PAO "ChKPZ" | 06.03.2026 09:00 |
Request for Proposals # 4350721
... Expand
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work!
Machining of two chabots (milling of the upper and lower planes, boring holes) as part of the overhaul of the 16t hammer (full-hydraulic hammer for forging in 400KJ stamps)
Urgent work! Collapse
| Archived | PAO "ChKPZ" | 05.03.2026 12:00 |
Request for Proposals # 4350753
Rigging works (three shabots) in accordance with the Requirements Specification
Urgent work!
Rigging works (three shabots) in accordance with the Requirements Specification
Urgent work!
| Archived | PAO "ChKPZ" | 05.03.2026 12:00 |
Request for Quotations # 4346796
... Expand
Rendering of services of a technical customer during the construction of the AVG Gas Equipment facility organization of mass production of high-pressure vessels (gas cylinders) in the special economic zone of the Yuzhnouralskaya industrial-production type Collapse
| Archived | PAO "ChKPZ" | 05.03.2026 10:00 |