1. Mode adjustment works (heating engineering (modal) adjustment, adjustment means the automatic regulation of technological protections and control) steam boiler CAD-6, 5/13 (station No. 4), running on gaseous fuel in the boiler room str.,...
1. Mode adjustment works (heating engineering (modal) adjustment, adjustment means the automatic regulation of technological protections and control) steam boiler CAD-6, 5/13 (station No. 4), running on gaseous fuel in the boiler room str., Smolensk. Frunze, 74
(OKPD2-71.20.13.110, OKVJeD2-71.20.9)
2. Mode adjustment works (heating engineering (modal) adjustment, adjustment means the automatic regulation of technological protections and control) Chamber gas furnace RCP-3 (station No. 4), Chamber gas furnace CRAB-3 (station No. 8) in the forge shop, 2010. Str., Smolensk. Lavochkin, 100
(OKPD2-71.20.13.110, OKVJeD2-71.20.9) 1. Mode adjustment works (heating engineering (modal) adjustment, adjustment means the automatic regulation of technological protections and control) steam boiler CAD-6, 5/13 (station No. 4), running on gaseous fuel in the boiler room str., Smolensk. Frunze, 74
(OKPD2-71.20.13.110, OKVJeD2-71.20.9)
2. Mode adjustment works (heating engineering (modal) adjustment, adjustment means the automatic regulation of technological protections and control) Chamber gas furnace RCP-3 (station No. 4), Chamber gas furnace CRAB-3 (station No. 8) in the forge shop, 2010. Str., Smolensk. Lavochkin, 100
(OKPD2-71.20.13.110, OKVJeD2-71.20.9)Collapse
OKPD2 category:
33.20.60.000 Услуги по монтажу оборудования для управления производственным процессом
Not applicable. Proposal shall cover the entire lot.
Hide prices and bidders' names during bids submission period:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Payment terms:
cost includes all costs of the supplier in connection with the execution of the works, as well as VAT 18% (except in cases where the Supplier is exempted from payment of VAT in accordance with the legislation of the Russian Federation). Payment is made within 10 (ten) banking days from the moment of signing of the Act of acceptance of the executed works.
The calculation is made with an individual customer's account to a separate account, open supplier in accordance with the Federal law "on State Defense order" in the authorized bank.
Delivery terms:
are:
̶ indoors existing production hall, located at Smolensk, UL. Lavochkin, 100;
̶ indoors existing boiler house, located at Smolensk, UL. Frunze, 74.
Start date of work: within 5 (five) calendar days from the moment of signing the contract.
Deadline for papers: within 20 (twenty) calendar days from the moment of signing the contract.
Venue of bids examination:
214006, Смоленская обл., г. Смоленск, ул. Фрунзе, д. 74
Date and time of bids consideration:
14.12.2017 14:00
Results date and time:
15.12.2017 14:00
Georeferencing:
214006, Смоленская обл., г. Смоленск, ул. Фрунзе, д. 74
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.