1. "Workshop 3. Fire alarm of premises SRVP-130.
2. Workshop No. 4. Security and fire alarm
of the thermal transfer department
3. Shop No. 6. Industrial site "A". Fire alarm
system of substation premises No. 7.
4. Shop No. 16. Fire alarm system....
1. "Workshop 3. Fire alarm of premises SRVP-130.
2. Workshop No. 4. Security and fire alarm
of the thermal transfer department
3. Shop No. 6. Industrial site "A". Fire alarm
system of substation premises No. 7.
4. Shop No. 16. Fire alarm system. The DUO-750 mill.
Premises PSM-1, PSM-2.
5. Workshop No. 21. Site "B". Equipment of household
premises of workshop No. 21 with automatic fire
alarm system.
6. Shop No. 37, building 2, industrial site "B". The plot is PRESENT.
Fire alarm of premises. 1. Local resource estimate No. 3-25-17-I-1
Project 05/03/17-PS
2. №4-18-13-1
Project 04.01.22-PS
3. No. 6-30-17-I
Project 06.10.19-PS
4. №16-133-17
Project 16.55.19-PS
5. No. 21-199-13-I
Project 21.56.16-PS
6. No. 37-43-33-I
Project 05/37.21-PSCollapse
OKPD2 category:
Show all (1 more)
26.30.5 Устройства охранной или пожарной сигнализации и аналогичная аппаратура
33.20.4 Услуги по монтажу электронного и оптического оборудования
33.20.50.000 Услуги по монтажу электрического оборудования
33.20.70.000 Услуги по монтажу прочих изделий, не включенных в другие группировки
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
Not applicable. Proposal shall cover the entire lot.
Hide prices and bidders' names during bids submission period:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Payment terms:
Upon completion of the work. The list of documents transferred (presented) to the Customer:
Executive documentation: the act of technical readiness of installation works, the list of installed equipment, the act of output control. The act of installation work, the act of commissioning, a copy of the license, passport and certificates for materials and equipment, a certificate of the cost of the work performed in the form of KS3, an act of acceptance of the work performed in the form of KS
Comments: Requirements for the quality assurance period: 2-3 years.
Qualification requirements for the Contractor:
Only qualified workers who have the appropriate category, a permit for high-altitude work and an electrical safety clearance group of at least 3 are involved in the performance of work. Work experience is required;
Special conditions: Specify the delivery time of the equipment. In the technical proposal, specify the technical characteristics and complete set of products, GOST, technical specifications, drawing no., according to which the products are manufactured and other essential information about the products, if any.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Информация от организатора:
Обращаем Ваше внимание на то, что настоящий запрос не является извещением о проведении конкурса (публичного конкурса) или публичной офертой и не регулируется ст. 447 – 449 ч. 1 ГК РФ, ст. 1057 – 1061 ч. 2 ГК РФ. Таким образом, указанная процедура не накладывает на Организатора соответствующего объема гражданско-правовых обязательств и оставляет за ним право отказаться от всех полученных Предложений по любой причине или прекратить процедуру отбора в любой момент, не неся при этом никакой ответственности перед Участниками.
Все вопросы по торговой процедуре размещать во вкладке Разъяснения.
По вопросам участия на ЭТП звонить по телефону +7(495)-989-85-19 доп. 7610, 7620
Terms of participation
To view the terms of participation, please get registered