Examination of industrial safety of working documentation:
1. Transfer to the automated control system of visualization and control of the flow rate of nitrogen gas supplied for dilution of cathode blowdowns Corp. 113;
2. Control of supply and...
Examination of industrial safety of working documentation:
1. Transfer to the automated control system of visualization and control of the flow rate of nitrogen gas supplied for dilution of cathode blowdowns Corp. 113;
2. Control of supply and exhaust ventilation in the controller building 601;
3. Installation of an additional coal adsorber pos. F-151a on the monomer-4 supply pipeline to the polymerization reactor pos. R-103/4-8, R-421/1,2;
4. Technical re-equipment. The project of blowing on the UTO and the installation of a density meter on the supply of cubic meters from E-475/1,2;
5. Development of a project to change the technological scheme of strapping pumps pos. N-397a/1,2;
6. Modernization of the reaction gas absorption scheme.Collapse
OKPD2 category:
71.20.19.111 Услуги по проведению государственной экспертизы проектной документации, запасов полезных ископаемых и подземных вод, геологической информации о предоставляемых в пользование участках недр, результатов инженерных изысканий
71.20.19.112 Услуги по проведению негосударственной экспертизы проектной документации и результатов инженерных изысканий
Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:
Deferred payment (recommended), or split interest payment
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.