Request for Proposals No. 2651089 
GSM The packaging must necessarily meet the requirements of the RCS. ANALOGUES ARE NOT CONSIDERED!!!!

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

OKPD2 category:
Total price:Price not specified
Contract award criteria:Price incl. VAT (show both prices)
Currency:RUB
Publication date:
Bid submission deadline:30.04.2021 11:28 (was extended by 28 min, 7 sec)
Last edited:27.04.2021 11:58
Organizer (Initiator):POLYMETAL TRADING, LTD
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:100% post payment upon receipt of the corresponding batch of TMC to the intermediate warehouse TD in the city. Aldan within 10 banking days
Delivery terms:By means of the supplier to the intermediate warehouse TD in the city. Aldan
Georeferencing:Republic of Sakha (Yakutia), Aldansky ulus, Aldan, Promyshlennaya str., 25
Comments:
1) Please note that participation in the competition means agreeing to the form of the buyer's contract.
2) It is necessary to attach the Commercial Offer electronically.
3) When displaying the CP, it is necessary to specify the manufacturer of products, availability, production time, delivery time to the supplier's warehouse, dimensions of the cargo (mass, volume, number of containers), point of dispatch;
4) Products should be new, not used;
5) Products must be attached certificates of conformity, passport, document confirming
quality;
6) Before shipment, it is necessary to fill out the packing list (see the example of filling in the procurement
documentation), paste the packing list on the packaging with the goods, send copies of documents to the customer by e-mail.
We draw your attention to the fact that this request is not a notice on the holding of a contest (public competition) or a public offer and is not regulated by Art. 447 — 449 h. 1 of the Civil Code of the Russian Federation, Art. 1057 — 1061 h. 2 GK RF. Thus, the specified procedure does not impose on the Organizer an appropriate amount of civil obligations and reserves the right to refuse all received Proposals for any cause or terminate the selection procedure at any time without incurring any responsibility to the Participants.
In the proposed CP specify:
1) Separately the cost for the goods and separately the cost for delivery;
2) Certificates of conformity;
3) Links to the manufacturer;
4) Payment terms;
5) Delivery time;
6) Ratio of the supplier to the supplied products (manufacturer, free seller, official dealer);
7) Guarantee.
8) Full compliance with the name of the TMC in commercial offers (hereinafter in shipping documents) requested in the purchase.
9) Requirement to observe the temperature regime when transporting cargo in the Far North
10) Responsible - Savelyev Alexander Olegovich
Trainee OMTS JAF "TD Polymetal"
Tel: +7 (4112) 263182
Inn.tel.: 228
Email: SavelevAO@polymetal.ru

The package design (transport packagings) shall enable the transport of goods by any mechanical device, including a forklift, cranes, carts or manual manipulation, Depending on the size and weight of the cargo (goods). The packaging shall be designed in such a way as not to prevent free access to the contents of the cargo area.
Metal rolling (pipes, fittings, corners, sheets, etc.) must be securely tied (wire, wire, wire rod or metal tape) into bundles (packages). The bundle of cargo places must withstand the weight of the cargo in a pack during the production of loading and unloading and exclude the loss of metal rolled from the bundle.
Each package must have a UL (or factory tag from the manufacturer).
Also, to prevent the lack of TMC during delivery, UL with full data (weight, number of pieces in 1 place) - on the list of TMC, which can not be visually calculated in the cut (pipe, channel, etc.).
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:Ким Андрей Вячеславович
Тел. +7(4112)26-31-82, доб.241
KimA@polymetal.ru

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 01.07.2021 at 11:27
и отклонил все заявки
Обоснование: без определения победителя.
Notifications have been sent to bidders.
Total bids: 2. More >>