Request for Proposals No. 846621 
fabrication and installation of ventilation systems from umbrellas graphitization furnaces section no. 8 HRS of material provided by the contractor's drawings ....

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:26.06.2017 19:30
Last edited:26.06.2017 15:19
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Prepayment for the acquisition of materials in the amount of not more than 30% of the contract sum. The remainder of the payment is made fractionally after the actual execution of works within the agreed time frame.
Delivery terms:1. Application of OJSC "EPM-NJeZ", g. Novocherkassk2. The purpose of the execution of works: Reconstruction of ventilation system of graphitization furnace hoods section no. 8 HRS. Removal of waste gases from furnaces HRS section no. 8.

3. Scope of work. disassembly, manufacturing and installation.

1. Annex No. 1 TK features. S 020. 12738 2. Annex No. 2 TK features. ART 12738 KM 3. Annex No. 3 Defective statement to dismantle

4. Requirements to the Executive Director. 4.1. Certification Manager, ENGINEERS and performers in industrial safety and labour protection on GCO. According to the annex No. 1. 4.2 Ensure HSE measures, safe methods of work on the project. 5. Conditions of work the work on existing Enterprise 5.1. 5.2. Work is done from the material executor 5.3. Electric Welding and gas cutting equipment and oxygen, propane, auxiliary materials provides artist. 5.4 Vehicles for transporting garbage, scrap or other waste, to be supplied by the customer

6. Place of work: The territory of the customer and the contractor.

7. Turnaround time: July-September 2017 g. metal fabrication in July-August, installation in August-September. The contractor provides the customer with a guarantee of 12 months on the executed work-. 8. Terms of payment: Prepayment for the acquisition of materials in the amount of not more than 30% of the contract sum. The remainder of the payment is made fractionally, after same-ness of performance of works within the agreed time frame.

9. General requirements. 9.1. To tender the contractor provides:

-certificate of admission to a specific kind of works that affect safety of capital construction (SRO certificate to perform work described in this Setting).
-

estimates for the manufacturing, disassembling and assembling works.
Annex 1

list of documents to be submitted by

in ATE Pb and ND to decorate dresses-tolerances for production work by contractors: 1. A copy of the certificate (CPO) for the right to run this vidarabot. 2. A copy of the briefing on occupational safety and health training log. Long BRP or RTI. 3. Copy of certification of working protocol for the protection of labour. 4. Copies of identity certification ITR on labour protection and the General requirements of industrial safety. When doing work on gas receptacles, working under pressure, using GMP, Lo-Cove (towers), electrical systems, conducting fire works-copy-stoverenij for each kind of work. 5. Medical admission personnel. 6. Copies of certificates gazojelektrosvarshhikov, Slingers, cars-specialists of cranes, lifts (towers). For gazojelektrosvarshhikov-copy Pro-accessible fire-technical certification. 7. Prior to the registration of attire-the admission of all contractor employees organization, including managers, are required to undergo induction training in OOTPBiGO (you have a document confirming identity and age) in the production of works, all employees must have certified clothes, footwear and other personal protection equipment necessary to perform this type of work.
Note:

In the case of any document expiration outfit-tolerance is arranged to provide a new document.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Party, participating in the procedure (who offer) before the expiry of the deadline, is required to download to your system the following documents: 1. Bylaws (as amended and supplemented, if they were). 2. Certificate about State registration. 3. Certificate of registration tax accounting. 4. Extract from the UNIFIED STATE REGISTER. 5. Balance sheet as of the last reporting date with tax authority stamp of acceptance. 6. Documents confirming the powers of the representative to sign documents: — Decision (Protocol)-power of attorney. 7. Proposal for execution of works (see file "work Proposal") 8. Contact person: Chesnokov Alexey Leonidovich. Environmental engineer Office of OTPBJeGOiChS, 8 86352-94530 phone, e-mail addresses of responsible persons: AChesnokov@Energoprom.ru DSalihov@Energoprom.ru 9. Certificate of conformity to requirements of standard ISO 9001: 2008 (if available), this request is not a notice about the contest or an auction and does not confer any rights of parties entails no duties except the expressly stated in the notice. 10. Executive requirements:-permits (CPO, licenses, tolerances) — development of PPR, Executive LEAD, RTI. — Availability of certification Manager, ENGINEERS, working on industrial safety at PBO. — medical admission personnel work at the PBO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 05.07.2017 at 16:37
and selected the winner: "Ug-Polimer-Stroy" OOO – (Bidder 2) (Скачков И.В.) submitting a bid dated of 26.06.2017 15:29 totalling to 2 100 000,00 RUB (VAT free)
Обоснование: Наименьшая стоимость изготовления и монтажа; срок выполнения согласно технического задания;
Notifications have been sent to bidders.
Total bids: 3. More >>