Request for Proposals No. 1397136 
Repair of internal combustion engines.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Repair of internal combustion engines.
According to specification.

OKPD2 category:
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:11.12.2019 16:00
Bids opening date:12.12.2019 16:00
Last edited:09.12.2019 08:03
Organizer (Initiator):"UK "TATBURNEFT'" OOO
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Customer makes payment for work by transferring cash payment orders to the bank account of the Contractor not less than ninety (90) working days from the date of signing the act of acceptance of work performed and the act of reception and transmission equipment from the repair without the Customer's remarks, with the obligatory indication of inventory numbers equipment, application damage report, indicating the location of defects (type, serial number of the drilling unit, the well), act to return materials (scrap) from repair with No. dpisyu Customer materially responsible person, unified form acts OC-3, the invoices of the Contractor for the amount of work performed, the account - invoice.
Delivery terms:The production area of the contractor within 50 km from the city of Almetyevsk, customer objects.
Georeferencing:423450, Russia, Republic of Tatarstan (Tatarstan), Almetyevsk, Musa Jalil str., 51
Comments:
"BINDING ACCEPTANCE OF THE AGREEMENT AS AMENDED THE CUSTOMER.
1. Contractor shall complete the Appendix №1 to this specification in the form of technical and commercial offer
2. Involvement of third party subcontracted companies is allowed only by written agreement with the equipment handover to subcontract.
3. When attracting subcontractors the cost of the delivery of equipment to the maintenance and repair of the equipment included in the cost of repair, the responsibility for organizing the delivery refers to the Contractor.
4. The cost of services offered by the Contractor upon repair of equipment should be indicated, taking into account transport and travel expenses, payroll costs, insurance, rent, taxes, customs duties, fees and other mandatory payments.
5. The presence of the Contractor's qualified personnel with experience in the overhaul of internal combustion engines Caterpillar (required documentary evidence).
5.1. The contractor undertakes to carry out tests on all types of equipment to be repaired Customer break-stand under the load of the test method and according to passport characteristics.
6. The cost of repair of each piece of equipment is determined individually on the basis of mutually agreed defective statements using spare parts, standards of time and the cost of standard-hours to perform work in accordance with the prilozheniem№1 to this specification, cost estimates for the repair of this equipment., By signing an additional agreement to the contract.
7. If necessary, use the repair materials and components not listed in Annex №1, the Contractor shall agree with the Customer the cost by signing an additional agreement to the contract. Artist confirms the value of these materials and components primary documents (invoices, invoices), the markup on materials and components were not included in the Appendix №1 should not exceed 2% of the cost of the manufacturer.
8. The positive experience of cooperation with the Contractor LLC "MC" "Tatburneft" welcome.
9. The customer has the right to adjust the value of the contract will increase / decrease the volume of work performed.
10. By results of trades contractor shall agree with the Customer planning calculations, the calculation cost of repairs with explanations of cost items.
11. After a major overhaul of drilling equipment Contractor shall make and attach a sign to the equipment cabinet, indicating the inventory and serial number under the Act OC-3.
12. During the overhaul contractor will repair equipment status to full or near full hardware resource according to the technical characteristics set forth in the passport equipment.
13. In case of failure of equipment owned by the customer (due to the Contractor), the warranty (Cleanup) period as well as the identification of the fact of malfunction of equipment owned by the Customer, during the execution of works (services), Customer shall be entitled to recover from the Contractor a fine of the magnitude of value idle (unproductive work) drilling rig (by type BU) on the basis of the cost of one hour of downtime (the calculation of the cost of an hour of downtime rig (for drilling rigs types) is a supplement to the contract). In the absence of idle (unproductive work) rig Customer shall be entitled to recover from the Contractor a penalty in the amount of 150 000 rubles.
14. In case of violation of terms of repair equipment, according to the terms of this agreement on the basis of a mutually agreed list and the monthly maintenance plan, the contractor will be penalized in the amount of 0.1% of the cost of works on the repair for each day of delay.
15. In case of refusal of warranty equipment customer has the right to dismantle it without the consent of the Contractor. Upon arrival at the Contractor's facility (well) the parties to create a commission composed of competent, authorized representatives of the Client and the Contractor, the ability to identify the guilty party without further investigation on the shop floor, appointed by the order of the enterprises. If necessary, to work in the Commission invited representatives of the Customer construction of wells. The Commission carries out an investigation and determines (sets) the reasons of failure of equipment, with mandatory registration and the signing of the two sides act of investigation of the incident.
16. The Commission shall determine the direction, say the incident directly to the drilling site, the day of the investigation, at the same time if there is no evidence of the Customer's fault, the party that has committed the incident recognized contractor. Which, in case of disagreement with the decision of the commission, after the removal of equipment at the Contractor's database (transport provided by the contractor), further investigation at his own expense, the right to present evidence of his innocence in the incident and to refute the Commission's decision. If further investigation Contractor shall ensure the presence of the Customer's representative and to implement its call in advance. Additional investigation only on the premises of the Contractor (exclude investigations on the premises of contractors, with their involvement). Equipment imported to industrial contractors on the basis of complaint, it must be repaired within 10 working days from the date of delivery of the equipment.
17. According to the results of the investigation committee composed of the investigation act, which must sign hand, the refusal to sign the certificate is not allowed. In case of failure Representative established as a result of the investigation the guilty party to sign the act, an act considered to be signed in favor of the other side, as in the act of a relevant note.
This Act is the basis for reimbursement (payment) the guilty party losses caused by the incident, idle or unproductive work at the expense of the guilty party, including the penalties charged to the customer by third parties.
If the guilty party recognized contractor said act is the basis for the claim Customer address Contractor. Reimbursement (payment) damages, including fines is carried out by adjustment in the direction of reducing the volume of work performed by the Contractor in the amount of damages (penalty) and payment of work performed after deducting the cost of downtime (unproductive time), indicated in the presented and accepted by the Contractor claims, or unanswered within 30 calendar days, or money transfer to the account of the Client on the basis of the claim.
"
18. Application of the offer on the letterhead necessary.

19. Get additional technical advice please call. :( 8553) 38-91-28 Igor Filippov
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 2. More >>