Request for Proposals No. 883028 
the overhaul of cylinder gear key ZQ203-100

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

the overhaul of cylinder gear key ZQ203-100

Quantity:5 ЕР
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:12.09.2017 12:00
Bids opening date:13.09.2017 12:00
Last edited:08.09.2017 08:04
Organizer (Initiator):"UK "TATBURNEFT'" OOO
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:the customer carries out the calculation for the work by transferring money payment orders to the bank account of Contractor within 90 calendar days from the date of signing of the Act of the executed works to repair equipment, with obligatory indication serial numbers of equipment, defective application statements, showing the location of defects (type, serial number, block drilling wells), Act on return materials (scrap) of repairs with material signature of responsible person Customer, uniform acts, OC-3, the contractor's invoices for the amount of work performed acts of reconciliation of accounts.
Delivery terms:term of agreement with Mr. 01.08.2017. by 31.12.2017 g. Term to overhaul equipment of not more than 20 (twenty) calendar days from the date of delivery of the equipment at the contractor's production base.
Georeferencing:423450, Россия, Республика Татарстан (Татарстан), г. Альметьевск, ул. Мусы Джалиля, д. 51
Comments:
1. The cost of the proposed Contractor equipment repair services should be made on the basis of a defective statements (annex 3 to the specification), taking into account the acquisition of required spare parts, transportation and travel expenses, expenses for wages, insurance, rent, taxes, customs duties, fees and other mandatory payments. 2. The contractor provides the employer for 3 (three) days prior to carrying out the procedure for requesting price quotes quotation containing: calculation parameters (annex No. 1 to the specification) and standard time for repairs required BO (annex No. 2 to the specifications). 3. The cost of repairs to the piece of equipment is determined individually on the basis of mutually agreed the defective statements, calculations for the repair of this equipment calculated using mutually agreed by the parties the parameters calculation of operating from 01.08.2017, decrypt the material and labor costs. 4. The customer has the right to adjust the value of the contract to decrease/increase the volume of executable works. 5. Based on the results of the ETP Contractor should agree with the customer repair cost generation options with explanations of the articles cost. 6. With the overhaul, the Contractor undertakes to restore the condition of the equipment until full or close to full resource equipment according to the technical characteristics indicated in the Passport equipment. 7. In the event of a failure of equipment belonging to the customer (on the part of the contractor), (posleremontnyj) within the warranty period, as well as revealing the fact of non-functional customer-owned equipment during the performance of works (services), Customer is entitled to recover from the Contractor fined values cost of downtime (waste) drilling rig (BU types) on the basis of the cost of one hour of downtime (annex 8 to the contract price adjusted hours downtime in a unilateral order one per quarter), but not more than the cost of repairs, in case of lack of downtime (unproductive) rig the customer has the right to recover from the contractor to a fine in the amount of 50 000 rubles and dismantling costs actually incurred broken equipment and installation of a revolving equipment. 8. If there is a violation of the timing equipment repair, according to the terms of this agreement on the basis of a mutually agreed list and monthly plan repair, the contractor will be penalized at a rate of 3% of the value of the works performed for each day delay, but not more than 30% of the volume of rendered services for the repair of this equipment. 9. In case of refusal the warranty of the equipment the customer has the right to dismantle it without negotiating with the contractor. Upon arrival, the contractor for the object (well) sides, a Commission composed of competent, the Plenipotentiary representatives of the contracting authority and the Contractor, able to identify the guilty party without further investigation in workshop conditions assigned orders by businesses. The Commission conducts investigations and determines (sets) the cause of equipment failure, with mandatory registration and signing with the two parties act investigation. 10. The Commission defines the side admitted the incident directly to the rig floor, on the day of the investigation, if there is no evidence of contracting authority, the party had caused the incident, recognized Contractor. Which, in case of disagreement with the decision of the Commission after the export of the equipment at the base of the contractor (transport provides contractor), further investigation at its own expense, shall have the right to present evidence of his innocence in the incident and to refute the Commission's decision. While conducting further investigation, the Contractor undertakes to ensure the presence of a representative of the customer and implement its call in advance. Further investigation is performed only on the premises of the contractor (no investigations on the premises of the subcontractors when they attract). Equipment brought on the production base of contractor claims, should be repaired within 10 working days from the date of delivery of the equipment. 11. The Inquiry Commission shall be constituted by an act of investigation, which are obliged to sign a hand, refraining from signing of the Act is not allowed. In case of refusal of the representative established an investigation the offending party from the signing of the Act, the Act is deemed to be signed in favour of the other party, as in the Act shall be checked. This Act is the basis for reimbursement (payment) the guilty party losses caused by the incident, downtime or unproductive work at the expense of the offending party, including penalties against the customer by a third party. If the guilty party is recognized as the contractor, the Act is the basis for a claim by the customer at the address of the contractor. Reimbursement (payment) damages, including punitive damages is done through adjustments to decrease the volume of work performed by the contractor in the amount of damages (penalty) and payment of work performed, taking into account the deduction of the cost of downtime ( non-productive time) specified in the charges and recognized Contractor claims or left without response within 30 calendar days, or money transfer to the bank account of the customer on the basis of the claim. 12. maintenance must be carried out in accordance with the requirements of the operating manuals of the equipment and operating standards. The warranty period for the repair work performed on the equipment is: -overhaul of equipment 12 months warranty on RUBBER used in repair-1000 hrs. 13. Application for quotation on the letterhead is required. 14. On this lot, please contact: Filippov, Igor Nikolaevich 987-420-16-12, (8553) 38-92-62, FilippovIN@tagras.ru
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.