1. |
Linear Object № 1 heat networks to splash pool (1 -) |
2. |
Linear Object № 2 overpass of heat networks to the distillery from UT 29 to N6 (1 -) |
3. |
Linear Object № 3 Heat Network (1-stage industrial site) (1 -) |
4. |
Linear Object № 4 Heat network (industrial site 2 queues and production 700) (1 -) |
5. |
Linear Object № 5 heat networks to the building 853 (1 -) |
6. |
overpass heat networks to the building 507 (1 -) |
7. |
overpass heat networks along the hull 227 (1 -) |
8. |
Hoz. Fire-fighting water plant (1 -) |
9. |
Industrial Water Supply (1 -) |
10. |
Technical Water Piping (1 -) |