Request for Proposals No. 924152 
Installation of gas supply, Automatics 30-minute security Chamber kiln No. 3 Sintering plant (building # 2) JSC «energoprom-Novocherkassk electrode plant ".

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:24.11.2017 20:00
Last edited:24.11.2017 14:24
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:in fact of fulfilled works. It is possible to prepay for consumables
Delivery terms:1. Application of OJSC "EPM-NJeZ", Novocherkassk
11. The purpose of the execution of works.
11.1. installation of gas supply and security automation kiln
12. The amount of performance of works
12.1. Perform disassembly:
- GRPSh (GSGO-02) an existing gas pipeline (Dn m 150-200, du 100-75 m Doo Doo 32-150 m 40-200 m 20-80 m Doo), gas injection burner-40 PCs supports the pipeline-30pcs, electromagnetic valve gas KPJeG 100 2 piece valve Dn 150-1pc.
3.2 Installation of the pipeline run in accordance with the project No. 47-17-FOV, no. 47-17-GMT.
3.3. Assembling of automatic security perform in accordance with the project No. 47-17-AGSV.
3.4 installation of the sheaths, wells, etc. run in accordance with the project No. 47-17-CD.
3.5. Upon completion of the installation works of paragraph 3.2. Gas and paragraph 3.3. Automation Contractor provides the customer with Executive-technical documentation adopted by the Inspectorate Rostekhnadzor for carrying out of starting-up and adjustment works.
3.6. Adjustment works.
3.6.1. Perform work on adjustment of combustion modes kiln.
3.6.2 Perform work on setting up the automation security and regulation of the kiln.
3.6.3. Upon completion of the adjustment works to compile reports and get rostehnadzor for furnace
3.7. To clarify the volumes of works, acquaintance with the project documentation you must arrive by the representatives of the contractor to the customer.
4. Contractor requirements
4.1 Certification Manager, ENGINEERS and performers in industrial safety and labour protection on GCO. According to the annex No. 1.
5. Terms of execution of works.
5.1 installation works
- start of works-November, 2017.
- completion-March 2018g.
5.2 adjustment works.
- commencement-April, 2017.
- completion date is May 2018g.
6. Terms of payment.
6.1. On the fact of fulfilled works. It is possible to prepay for consumables.
7. technical specifications attached a list of the documents necessary for processing orders is enterprise tolerances listed in annex No. 1.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Party, participating in the procedure (who offer) before the expiry of the deadline, is required to download to your system the following documents:
1. Bylaws (as amended and supplemented, if they were).
2. Certificate about State registration.
3. Certificate of tax registration.
4. Extract from the UNIFIED STATE REGISTER.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the representative to sign the documents:
-Decision (Protocol).
-Power of attorney.
7. Proposal for execution of works (see file "work Proposal")
8. Contact person: Roman Viktorovich Dinkov, head of energy management-head of energy, telephone, fax 8 86352-94570 8 86352-9-41-83.
9. Certificate of conformity to requirements of standard ISO 9001: 2008 (if available)
This request is not a notice about the contest or an auction and does not confer any rights of parties entails no duties except directly specified in the notification.
10. Executive requirements:
-Permits (CPO, licenses, tolerances).
— Development of PPR, Executive LEAD, RTI.
— Availability of certification Manager, ENGINEERS, working on industrial safety to GCO.
— The availability of medical staff work at the tolerance of GCO.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 26.02.2018 at 11:17
and declared the call for bids void.
Notifications have been sent to bidders.