to the right of the conclusion of the contract for turnkey technological connection of consumers in the Astrakhan region (10 objects): 1. Construction ВЛИ-0.38 square meters from the nearest supports ВЛИ-0.38 square KTP-773, f. FP 35/6 22 kV for...
to the right of the conclusion of the contract for turnkey technological connection of consumers in the Astrakhan region (10 objects): 1. Construction ВЛИ-0.38 square meters from the nearest supports ВЛИ-0.38 square KTP-773, f. FP 35/6 22 kV for 0.5 power supply of a residential building, located at c/t "Medic" Ouch. 165, s. Kamyzyak, Privolzhsky district, Astrakhan oblast. (approximate length-0.054 km).
2. construction ВЛИ-0.22 kV from the nearest supports ВЛИ-0.22 sq l-1 TP-763, f. FP 18 35/6 sq Kamyzyak to supply residential house on the lane. Deadlock, d. 1, p. beginning, Privolzhsky district, Astrakhan oblast. (approximate length-0.07 miles).
3. construction of 0.38 kV ВЛИ-from the nearest supports ВЛИ-0.38 kV transformer-122, f. FP 21 35/6 sq Birjukovka to supply residential homes on the street. Quince, Bldg. 3, p. Ivanovsky, Privolzhsky district, Astrakhan oblast. (approximate length-0.24 km).
4. install the 10/0.4 kV PTSS and construction of VL-10 kV f. FP 110/10, 5 kV Tabola to supply PETROL STATION on the street. Young, d. 13 "and" Astrakhan ', Kamyzyaksky Distr., Astrakhan oblast. (approximate length-0.03 km; approximate power transformer 0.16 Mva).
5. construction of 0.38 kV ВЛИ-from the nearest supports ВЛИ-0.38 square KTP-442, f. FP 5 35/6 square 0.5 to supply residential building, located in the MCR. South, Bldg. 16, s. Kamyzyak, Privolzhsky district, Astrakhan oblast. (approximate length-0.255 miles).
6. construction ВЛИ-0.22 kV from the nearest supports ВЛИ-0.22 square KTP-307, VL-14 RP-9 f. FP 35/6 12.35 square 0.5 to supply residential homes on the street. Merry, d. 18, s. Scree Knoll, Privolzhsky district, Astrakhan oblast. (approximate length-0.13 km).Collapse
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
specified in Annex No. 1
Delivery terms:
are indicated in Annex No. 1
Venue of bids examination:
Россия, 414000, Астраханская область, г. Астрахань,
ул. Красная Набережная, 32
Date and time of bids consideration:
03.09.2018 10:00
Results date and time:
03.09.2018 14:00
Georeferencing:
Астраханская область
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.