on the right to conclude a contract "turnkey" for technological accession of consumers in the Astrakhan region (16 objects): 1. Construction of the Vli-0.22 kv from the nearest support Vli-0.22 kv KPV-254, F. 611 PS 110/10-6 KV Urban for the...
on the right to conclude a contract "turnkey" for technological accession of consumers in the Astrakhan region (16 objects): 1. Construction of the Vli-0.22 kv from the nearest support Vli-0.22 kv KPV-254, F. 611 PS 110/10-6 KV Urban for the electricity of a residential building on the street. Lesnaya, 3 B, Polyana, Privolsky region, Astrakhan Reg. (approximate length-0.15 km);
2. Construction of the Vli-0.38 kv from the nearest support Vli-0.38 kv KPV-576, F. 611 PS 110/10-6 KV Urban for the electricity of a residential building on the street. Sadovaya, D. 39, C. Three channels, Privolsky region, Astrakhan Reg. (approximate length-0.15 km);
3. Construction of Vli-0.22 kv from the nearest support Vli-0.22 KV TP-428, Вl-68 RP-2 F. 27 PS 110/10 KV Funtoo for the electricity of the dwelling house № 4 in C/T. "Neftynik", Privolskiy region, Astrakhan Reg. (approximate length-0.4 km);
4. Construction of Vli-0.38 kv from the support designed Vli-0.38 kv KPP-428, вl-68 RP-2 F. 27 PS 110/10 KV Funtoo for the electricity of the dwelling house on the site № 33 in C/T. Delta, Volga River, Astrakhan region;
5. Construction of Vli-0.38 kv from the nearest support Vli-0.38 kv L-1 TP-214, Вl-68 RP-2 F. 27 PS 110/10 KV Funtoo for power supply of residential house by Lane. 2nd Nizhny Novgorod, 4, Karagali, Privolsky region, Astrakhan Oblast. (approximate length-0.15 km);
6. Installation of KPP-10/0.4 kv and construction of Vli-0.22 kv from the nearest support Vli-0.22 kv, VL-2 RP-Yakz F. 33 PS 110/10 kv Funtoo for electricity garage on the street. Kamyzyakskoe Highway 7 (belongs to the building № 203), S. Yakatovo, Volga region, Astrakhan region;
7. Construction of Vli-0.38 kv from the support designed Vli-0.38 kv designed KPV-10/0.4 kv, F. 13 PS 110/10 KV Funtoo for the electricity of a residential house on the street. Construction, D. 1 "A", Yakatovo, Privolsky region, Astrakhan Reg. Approximate length – 0.06 km);Collapse
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
specified in annex № 1
Delivery terms:
specified in annex № 1
Venue of bids examination:
Россия, 414000, Астраханская область, г. Астрахань,
ул. Красная Набережная, 32
Date and time of bids consideration:
22.02.2019 10:00
Results date and time:
22.02.2019 14:00
Georeferencing:
Астраханская область
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.