Request for Proposals No. 833820 
Slicing (repairs) threaded ends of the fiberglass tubing TUBING 2-3/8 (D = 50 mm), in need of perenarezke one threaded end cutter (repairs) threaded ends of the fiberglass tubing TUBING 2-7/8 (D = 63 mm) in need perenarezke one koncaNarezka screw...

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:05.06.2017 15:00
Last edited:30.05.2017 10:20
Organizer (Initiator):UK "TMS grupp" OOO
Additional info
Per-item bid submission
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:payment is made by money transfer to the bank account of vendor payment deferral from 60-90 dnejPredoplata 0%
Delivery terms:CC TMS group "LLC, Republic of Tatarstan, city of Almetevsk, UL. Herzen, 1 d 1. Adoption of the text of the contract the customer. 2. The planned contract amount is 9 000 000 rub. 0000 kopecks (VAT excluded) 3. customer has the right to increase the size of the rendered services without increasing the amount of the contract, if such services do not exceed 10%. 4. Compliance services rendered TU 2296-001-26757545-2008.5. The contractor is responsible for the quality and timely delivery of services. 6. The service costs should include all costs of the contractor (transport, travel, overhead and other costs associated with the provision of the service) and is not subject to an adjustment upwards. 7. Allowed adjustment of the amount of work and the total value of the contract downwards after spending request for quotations (tenders). 8. The customer shall be entitled at any time unilaterally amend the quantity and total cost of the work performed under the contract by notifying the contractor, not less than 30 days. 9. Sending equipment to perenarezku and after the work is done on the basis of the uniform consignment note m-15 or form No. 1-vol. 10. Provision of services is carried out in accordance with applicable standards of PJSC "Tatneft". 11. Provide, together with the offer calculation with a breakdown of costs for services rendered. 12. Work performance term-within 20 working days from the date of delivery of the consignment. 13. Secure the fiberglass tubing, the necessary technical and supporting documentation (certificate, etc.). 14. Account taken to perenarezki, as well as refurbished fiberglass tubing on the number and types of, and monthly to provide written information to the customer. 15. Resolve on their own and at their own expense when it detects weaknesses identified poorly executed works during the warranty period, or reimburse the customer losses and reimburse the customer the costs on the basis of the claim settlement with the application exposed to eliminate premature failure because of Contractor repaired fiberglass tubing if it is proved by the investigation Commission with the participation of interested parties. 16. In the event that the Contractor deficiencies within 10 working days, the customer has the right to correct the shortcomings themselves or by engaging third parties. In this case, the contractor shall reimburse the customer incurred expenses within ten days from the moment of the presentation of the relevant requirements of the customer. Reimbursement and payment of the fine does not release the contractor from the proper performance of their obligations under the Treaty. 17. To participate in the Commission to investigate the causes of poor work performance, provide the Commission with all materials needed to investigate a poorly executed works. 18. Provide, within 5 days of acceptance of the executed works and invoice for payment from the date of delivery in accordance with the note on the invoice on receipt of the goods, but no later than 1 day of the month following the reporting month. 19. Provide the customer with the ability to control the execution of works at all stages, and in this regard to provide normative and technical documentation according to which the work and other necessary information. To ensure unimpeded access to the place of execution of the works, as well as all his plots on processing the rods, the place of storage of material and technical resources, including the holding of inventory. 20. Equipment taken in repair, the contractor shall keep in a covered area and thus to avoid spoilage, damage. The contractor is responsible for the fault, which resulted in the loss, shortage, damage to property. In these cases, the contractor is obliged to choose either reimburse the property value, or provide similar equipment within one month from the date of receipt of the claim. The value of the property is determined according to the accounting of the customer at the time when the employer learned of loss, shortage, damage of property. The contractor shall immediately notify Customer since the discovery of loss, shortage, damage of property. 21. At the end of the period (month) on the last day of the month, the Parties shall agree upon verification report on movement of fiberglass tubing. 22. Shipping to repair and shipping to the customer of the results of the executed works trucks contractor. 23. Removal of fiberglass tubing for a turnaround and shipment to the customer of the results of the executed works is carried out by the contractor on the following requisites: address: 1. SMT. Jalil, SC BEAM TUBING LLC-service» CC OOO "TMS groups» 2. Service Centre for repair rods OOO"NKT-service area 24. Ridder. Produce packaging fiberglass tubing in accordance with Tu on diameters, lengths and. 25. The Contractor undertakes, for a time, not less than 1 day (working time), give notice of the imminent arrival of transport on the basis of the CRIMINAL CODE of OOO "TMS groups. 26. The Contractor undertakes to complete each batch of fiberglass tubing tags with the necessary information. Tag must be protected from moisture, lamination. The inscription on the label must be clearly fulfilled pencil or ink, not vycvetajushhimi in the Sun.
Georeferencing:423450, Russian Federation, Republic of Tatarstan, g. Almetyevsk, ul. Herzen, d.1 "D"
Comments:
work should be executed on their own without the involvement of subcontractors
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 1. More >>