Organization of infrastructure for video surveillance of 18 workshops of Ural Steel JSC using Contractor materials.
The cost of SMR (without materials) in the prices of 2001 It is 131,655.
Organization of infrastructure for video surveillance of 18 workshops of Ural Steel JSC using Contractor materials.
The cost of SMR (without materials) in the prices of 2001 It is 131,655. SMR for the installation of video cameras, metal structures, network and server equipment, telecommunication cabinets, installation of VOLS, SCS, power gridsCollapse
Products/ services category according to Activities Classification:
DF3 Мультимедиа, видеонаблюдение
Участники закупки:
Все поставщики
OKPD2 category:
Show all (12 more)
25.11.99.000 Услуги по производству металлоконструкций и их частей отдельные, выполняемые субподрядчиком
25.61 Услуги по обработке металлов и нанесению покрытий на них
26.40.33 Видеокамеры для записи и прочая аппаратура для записи или воспроизведения изображения
26.40.33.110 Видеокамеры
33.20.42 Услуги по монтажу профессионального электронного оборудования
33.20.42.000 Услуги по монтажу профессионального электронного оборудования
43.21 Работы электромонтажные
43.21.1 Работы электромонтажные
43.21.10 Работы электромонтажные
43.21.10.120 Работы электромонтажные, связанные с установкой приборов
43.21.10.170 Работы электромонтажные по прокладке телекоммуникационной проводки
43.21.10.290 Работы электромонтажные прочие, не включенные в другие группировки
43.99 Работы строительные специализированные, не включенные в другие группировки
Bidders can submit their proposals for certain lots of the call for bids, but necessarily for all the items within a selected lot
:
Not applicable. Proposal shall cover all the items of the selected lots
Two-stage purchase procedure
The procedure is held in two stages. At Stage 1 the bidders need to upload the file with the proposal based on requirements specified in the documentation for prequalification of bidders. On the basis of received proposals the organizer makes decision on allowing to the bidders access to the next stage (Stage 2).
:
Yes
Hide prices and bidders' names during bids submission period:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Payment terms:
It is preferable to pay 100% upon the fact of services rendered with a delay of 60 k.d
. In case of advance payment, take into account the provision of a bank guarantee.
We are ready to consider the Bidder's suggestions.
Delivery terms:
Works are carried out in existing workshops, at altitude, from inventory scaffolding.
The presence of SRO is mandatory.
Comments: 1. It is necessary to attach all the required documents (at stage 1, completed Appendices 2-6, a list of basic materials (without prices!), an extract from the SRO, documents confirming the qualifications of personnel and the right to perform work in accordance with clause 14 of the Requirements Specification, at stage 2, completed Appendix 1, SSR, a list of basic materials (with prices) in excel and fill in the tabular part of the E-Marketplace). In the technical part of the offer (Appendix No. 6), it is not allowed to indicate any information related to the commercial part (total cost, unit rates, payment terms, etc.). The offer must strictly correspond to the data indicated on the electronic platform. If the data in the attached TA and the completed electronic form on the site do not match, the electronic form takes precedence. In case of non-compliance with the above requirements, the TA will be rejected.
2. In case of providing false information, a potential service provider may be suspended From participating In the Call For Bidding, and if the unreliability Of the information provided is revealed after the conclusion of the Contract, such an agreement may be terminated. The Company has the right to choose an Offer that does not have the lowest price, as well as to accept or reject any Offer in whole or in part, as well as to reject all Offers with or without explanation, as well as To cancel The Call For Bidding at any stage, including after selecting the Winner.
3. Ural Steel JSC uses electronic document management (EDI) with its partners and customers in the Dyad system (http://www.diadoc.ru ) SKB Kontur company. Please note that, all other things being equal, preference may be given to a supplier using electronic document management systems.
4. Bids will be considered only from ACCREDITED suppliers on B2B (general accreditation No. 396, Questionnaire on Occupational Safety and Industrial safety No. 645).
3. In case of winning the competition with the Bidder, the possibility of concluding an Agreement on EDI is being considered (The project Is Attached To The Call For Bidding), as well as the conclusion of an Agreement on ensuring the safety of production (The project is attached To The Call For Bidding, it must be signed when submitting the Technical And Commercial Proposal).
5. For filling out the Bidding Documentation, please contact: Aliya Baykhanova a.baihanova@uralsteel.com , tel.: +7(3537) 66-20-05.
For technical issues Of the Requirements Specification, it is necessary to use the Requests For Clarification tab on the E-Marketplace.
For questions related to filling out the E-Marketplaces interface, please contact the B2B-Center Platform support service:
tel.: +7(495) -989-85-19 ( ext. 7610, 7620), 8-800-555-85-19
6. In accordance with the Regulations of the B2B-Center Platform System (Section II, Chapter 8, clause 8.10(1)): The Bidder who meets the requirements of the Request for proposals and offers the best conditions for the execution of the contract according to the set of criteria established by the documentation of this request for proposals becomes the winner of the request for proposals.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.