The conclusion of the contract on execution of a complex of works "turnkey" (including: Preparation of initial and permissive documentation, design and working documentation, construction and installation, electrical installation and...
The conclusion of the contract on execution of a complex of works "turnkey" (including: Preparation of initial and permissive documentation, design and working documentation, construction and installation, electrical installation and commissioning, equipment supply) on the objects of technological connection of the branch of PJSC "Mrsk of the South"-" Rostenergo ": 1. "Construction of Vli-0.4 kv from RU-0.4 kv кп № 69/100 kva on Вl-10kv" Kirov "from PS 35/10kv SH-48 for power supply of economic construction p. Krasny Luch, within the boundaries of the former SPK them. Kirova, Oktyabrskiy District, Rostov region. (Demirchan G. K.) (approximate length of transmission line-0.5 km) "; 2. "Construction of the Vli-0.4 kv from the VL-0.4 kv № 1 TP № 301 to lying-0.4 kv building buildings b/O builder, art. Melikhovskaya, Ust-Donetsk region, Rostov region. (IP Kozachenko N.) (approximate length of transmission line-0.360 km.) "; 3. "Construction of Вl-10kv, CTP10/0, 4KV and вl-0.4 kv to water treatment facilities in St. Melikhovskaya, Ust-Donetsk region, in Rostov region, (Mku service of the customer), (approximate length of transmission line-0.030 km, power TP-160 kVA)"Collapse
Procurement method (according to the procurement regulations):
Запрос цен по результатам проведенных открытых конкурентных процедур
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
specified in annex № 1
Delivery terms:
specified in annex № 1
Venue of bids examination:
Россия, Ростовская область, 344002, г. Ростов-на-Дону, ул. Большая Садовая, 49.
Date and time of bids consideration:
25.01.2019 10:00
Results date and time:
25.01.2019 14:00
Georeferencing:
Россия, Ростовская область
Comments: it is assumed that the proposals of the participants will be considered within 40 days from the date of the deadline for submission of bids for participation in the purchase. In exceptional cases this term may be extended by the customer's decision.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.