Request for Proposals No. 3218878 
Planning and strengthening of the slopes of Tula

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Planning and strengthening of the slopes of Tula

OKPD2 category:
43.12.11  Работы земляные; работы по расчистке территории
43.12.11.150  Работы по закреплению (стабилизации) грунтов
Quantity:1 усл.ед
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:08.02.2023 12:00
Last edited:01.02.2023 18:58
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:Advance no more than 20%
Delivery terms:The scope and list of works includes, but is not limited to, the composition
listed below. The works are carried out by the Contractor in full,
"turnkey", by the Contractor's forces, means and mechanisms, including all
necessary consumables and related expenses.
1. Delivery, unloading of all necessary and consumable materials for
strengthening slopes, according to the requirements of the Statement of work volumes (Appendix A), Technical specifications and Working documentation
(Appendix B).
2. Mobilization of all necessary equipment and tools
to the work site in the amount necessary for high-quality
work in accordance with the GPR.
3. Input control and quality control of materials with an entry in the journal and
certificates.
4. Delivery, unloading, warehousing, moving materials to the place
of work.
5. Planning, leveling, filling and compaction with mineral soil
to the required marks, planning, leveling, filling and compaction
with fertile soil to a thickness of at least 15 cm, sowing with seeds of perennial grasses (consumption of at least 60gr/m2), laying and anchoring
geopolotn, sprinkling geopolotn with fertile soil to a thickness
of at least 7cm, watering slopes.
6. Stage-by-stage delivery of works and executive documentation
to the Customer's technical supervision representative.
7. other work necessary for the successful completion of the work.
8. Demobilization.
According to the Customer's decision, part or the full volume of materials
listed in the Statement of Work Volumes can be delivered
By the customer, as a tolling material. The obligation, in this
case, for entrance control, acceptance, unloading, moving to the place of work, completeness, protection and safety of material and
property, etc., remains with the Contractor.
Requirements for the work
1. Before the start of work, check and accept the slopes.
2. Before the start of the work, coordinate the PPR and the detailed schedule of delivery and work with the Customer.
3. Determine and coordinate with the Customer the place of unloading and storage
of materials.
4. Provide 100% input control of materials and products for compliance
with the requirements of the Terms of Reference and Working Documentation.
5. The supplied materials must be accompanied by quality certificates,
certificates of conformity.
6. The imported soil must be suitable for performing this type
of work, accompanied by quality certificates.
7. All work is carried out "turnkey" with materials and by the Contractor. The
cost of the work includes, temporary lighting, a wheel washing point and its
maintenance and accommodation and meals for personnel, the construction of temporary
roads, networks and structures, sanitary facilities and their maintenance, maintenance and maintenance of the work site and
approaches to it, consumables, overlaps, overlaps and docking
materials, travel expenses, materials and equipment for
laying, maintenance and heating of concrete, personal protective
equipment for safety, snow cleaning, drainage, collection, removal and disposal
of garbage, safety of materials, equipment and property, obtaining and
developing the necessary accompanying documents for the production of works
and other costs necessary for the successful completion of work within the time limits set by the contract and with quality that meets the requirements
The Customer, this TOR and the Working Documentation.
8. When constructing an object, follow the RD-11-02-2006 regarding
the composition and list of acts of inspection of works and inspection
of structures, a set of Executive documentation.
9. When performing work and after completion of work, it is necessary to
clean the territory and remove garbage.
10. Any changes in the composition and content of the work, the
equipment and materials used are documented in writing
and sent to the Customer for consideration.
11.Payment for the work performed is made for
the amount of work actually performed, on the basis of executive documentation, with confirmation
by technical supervision and a surveyor of the customer. The volumes and cost
of the work performed are closed "in the body", i.e. taking into account the coefficient of compaction,
decompression, spills, losses during transportation and
unloading /loading, overlaps, scraps, overlaps, coefficient for irreparable losses, coefficient of metal deposition, etc. should be
included in the cost of work.
12. The Contractor undertakes to prepare and send to the Customer a daily
report, according to the Customer's form, on the work performed.
Georeferencing:Tula region, Aleksinsky district, Novoe Kleymenovo village
Comments:
Work should be carried out in accordance with the requirements of the regulations:
JV 18.13330.2019 Production facilities . Planning organization
of the land plot ( General plans of industrial enterprises )
SP 82.13330.2016 Landscaping.
SP 45.13330.2017 Earthworks, foundations and foundations.
GOST 25100-2020 "Soils. Classification" in force on the territory of the Russian Federation, Working documentation, Statement
of Work volumes, Contract and this Terms of Reference, other technical and regulatory documents;
The materials, equipment, tools used must
comply with GOST, technical specifications applicable in the territory of the Russian Federation, have the necessary certificates and permits
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: Hidden