Request for Proposals No. 3372553 
Delivery and installation of reloading equipment (gates, leveling platform, sealer, bumper) Warehouse complex with attached storage facility, located at: Stavropol Territory, Nevinnomyssk, Timiryazev str.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Delivery and installation of reloading equipment (gates, leveling platform, sealer, bumper) Warehouse complex with attached storage facility, located at:
Stavropol Territory, Nevinnomyssk, Timiryazev str.

OKPD2 category:
Quantity:1 усл.ед.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:20.07.2023 11:00
Last edited:14.07.2023 12:56
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:advance payment, mainly post-payment
Delivery terms:The scope and list of works includes, but is not limited to, the composition listed below. The works are carried out by the Contractor in full,
turnkey, by the Contractor's forces, means and mechanisms, including all necessary consumables and related expenses.
1. Purchase and delivery of consumables, fasteners, anchors, shaped elements and all other materials necessary for the work.
2. Mobilization of all necessary equipment and tools
to the work site in the amount necessary for high-quality work in accordance with the GPR.
3. Entrance control and quality control of materials and products with an entry in the journal and certificates.
4. Delivery, unloading, warehousing, moving materials to the place of work.
5. Installation of dock equipment, fire curtains, gates.
6. Commissioning works.
7. Stage-by-stage delivery of works and executive documentation to the representative of the construction control of the Customer.
8. Other work necessary for the successful completion of the work.
9. Demobilization.
According to the Customer's decision, part or the full volume of materials listed in the Statement of Work Volumes can be supplied by the Customer as a tolling material. The obligation, in this case, for entrance control,
acceptance, unloading, moving to the place of work, completeness, protection and safety of material and property, etc., remains with the Contractor.
Georeferencing:Stavropol Territory, Nevinnomyssk, Timiryazev str., p. 16
Comments:
1. Before the start of installation, check and accept the structures for
compliance with the planned and high-rise positions,
notify the Customer and the General Designer about excess deviations and discrepancies.
2. Before the start of the work, coordinate the PPR and a detailed schedule of work with the Customer.
3. Determine and coordinate with the Customer the place of unloading and storage of materials.
4. Ensure acceptance and 100% input control of materials and products for compliance with the requirements of the Terms of Reference, Working documentation and completeness.
5. Each product must be accompanied by quality certificates,
certificates of conformity and a guarantee for installation.
6. Perform cleaning, preparation of the pit, according
to the manufacturer's requirements.
7. The installation and welding of the platform to the embedded parts of the floor should be carried
out in accordance with GOST 31174-2017 and the manufacturer's requirements.
8. Perform cleaning, preparation of the opening and metal structures, according to the manufacturer's requirements.
9. Install the gate according to GOST 31174-2017 and
the manufacturer's requirements. Fixing the guides to concrete and metal should be carried out in
accordance with the manufacturer's requirements.
10.Perform cleaning, preparation of the base panels, according
to the manufacturer's requirements.
11.Install rubber bumpers on anchors according
to the manufacturer's requirements.
12.Perform installation on the concrete base, the opening sealer according
to the manufacturer's requirements.
13. Install the gate control unit, platform, body lighting lamp with a switch. The electrical equipment is connected to the warehouse's power supply system by the Contractor.
Ground all metal structures.
14. Perform commissioning and delivery of the completed works
of the installed equipment to the representative of the construction control
The customer and the building maintenance service.

Contractor. The cost of work includes: temporary lighting, accommodation and meals for staff, sanitary facilities and their maintenance, installation of temporary fences, scaffolding, scaffolding, stairs, struts and consumables, overlaps, overlaps and joints of materials, travel expenses, materials and equipment for laying, maintenance and heating of concrete, personal protective equipment for occupational health and safety, maintenance and maintenance of the site of work and approaches to it, snow cleaning, drainage, collection, removal and disposal of garbage, safety of materials, equipment and property,
obtaining and developing the necessary related documents for
the production of work and other costs necessary for the successful
completion of work within the time limits set by the contract and with the quality
corresponding to the requirements of the Customer, this Technical Specification and Working Documentation.
2. The scope of work includes the connection, grounding of the contracted
electrical equipment to the power supply system of the warehouse complex, as well as conducting a NDP (see the project "Internal power supply systems 26-11-21-RD-EOM1")
3. During the construction of the facility, follow the RD-11-02-2006 regarding the composition and list of acts of inspection of works and structures, step-by-step
delivery of works and sets of Executive documentation to a representative of the Customer's technical supervision.
4. When performing work and after completion of work, it is necessary
to clean the territory and garbage collection.
5. Any changes in the composition and content of the work, the
equipment and materials used are documented in writing and sent to the Customer for consideration.
6. Payment for the work performed is made for the amount of work actually performed, on the basis of executive documentation, with confirmation by technical supervision and a surveyor of the customer. The volumes and cost of the work performed are closed "in the body", i.e. taking into account the coefficient of compaction, decompression, spills, losses during transportation and unloading /loading, overlaps, scraps, overlaps, coefficient for irreparable losses, coefficient of metal deposition, etc. should be included in the cost of work.
7. The Contractor undertakes to prepare and send to the Customer a daily report, according to the Customer's form, on the work performed

There are access roads to the border of the construction site.
On-site entrances to places of work and storage of materials, the contractor provides and organizes independently

The contractor independently provides its electricity needs

The contractor independently provides its needs for technical and household water supply

Work should be carried out in accordance with the requirements of the regulations:
Federal Law No. 384-FZ of December 30, 2009 "Technical Regulations on the Safety of Buildings and Structures";
SP 70.13330.2012 "Load-bearing and enclosing structures";
RD-11-02-2006 "Requirements for the composition and procedure for maintaining executive
documentation during construction, reconstruction, capital repairs
of facilities";
GOST 31174-2017 "Metal gates. General technical conditions";
GOST 32603-2021 "Three-layer metal panels with mineral wool filling, 1st class of panels";
TR CU 004/2011 "Technical Regulations of the Customs Union "On
the safety of low-voltage equipment",
in force on the territory of the Russian Federation, Working documentation, Statement
of work volumes, Contract and this Technical Specification, other technical and regulatory documents;
The materials, equipment, tools used must
comply with GOST, technical specifications applicable in the territory of the Russian Federation, have the necessary certificates and permits

The warranty for the equipment and the result of the work performed by the Contractor is
5 years.

The contractor fully assumes all obligations to fulfill the requirements for ensuring safe work, compliance
with the requirements for OT, TB and PB, in accordance with the requirements of Russian legislation and to carry out the following list of measures during the production of contract work: organizational measures, technical
measures, measures to provide personal protective equipment. Before starting contract work, instruct personnel in the field of occupational safety and fire safety with an entry in
the briefing logs. The Contractor is obliged to immediately respond to all
comments from the Customer on violations of the rules of OT, TB and PB, and
immediately eliminate them. The customer has the right to stop the contractor's work until the violations are eliminated. The Customer has the right to impose a fine on
Contractor for non-compliance with the Customer's requirements to eliminate violations of the rules of OT, TB and PB.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0