Bidders can submit a bid for separate items within the call for bids
:
Applicable
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
If within the last 60 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 60 minutes from the time the last bid is submitted.
:
60 minutes
Payment terms:
according to the clauses of the enclosed contract:
7.1. The cost of equipment and works performed by the contractor under this contract under annex № 1 and annex № 2 to this Agreement shall be ________ (________________________) rubles. 00 CPC, including VAT (18%) ______ (_______________) rub. 00 CPC.
7.1.1. The cost of equipment supplied under this contract, according to the annex
№ 1 is the amount of _________ (____________________) rub. 00 CPC, including VAT (18%) ______ (______________________) rub. 00 CPC.
7.1.2. The cost of the work according to annex № 2 to this Agreement shall be
_______ (_______________) rubles 00 CPC, including VAT (18%)-______ (_______________) rub. 00 CPC.
7.2. Payment is made by the customer on the accounts, issued by the contractor, by:
7.2.1. Transfer of the advance for the supplied equipment in the amount of% of the value specified in paragraph 7.1.1 to the contractor's current account within 7 (______) calendar days from the moment of signing by the parties of the contract,
7.2.2. Transfer of funds for the supplied equipment in the amount of% of the value specified in paragraph 7.1.1, to the contractor's current account within 7 (______) calendar days from the date of signing by the parties of the consignment note trade-12,
7.2.3. Transfers of funds for performed works in the amount of 100% of the value specified in paragraph 7.1.2 to the contractor's current account within 14 (______) calendar days from the date of signing of the Act of acceptance of works.
7.3. The cost of equipment, installation and commissioning for the duration of the contract is fixed and is not subject to revision.
7.4. The cost of delivery is included in the cost of equipment.
Delivery terms:
2.1 The basic requirements are specified in annex № 1 of this documentation.
2.2 Place of work: Ulyanovsk, ul. 44-ST Engineering, 9.
2.3 The customer shall arrange for the participant a preliminary inspection of the object at the address of Ulyanovsk, ul. 44-ST Engineering, 9.
2.4 Terms of delivery and installation of equipment for video surveillance and ACS: Within 21 calendar days from the date of the advance payment.
2.5 The cost of works under the contract shall include all taxes and other obligatory payments, the cost of all related works (services), as well as all discounts offered by the participant.
2.6 Advance Payment no more than 70% of the cost of the equipment.
Venue of bids examination:
432072, Россия, Ульяновская область, г. Ульяновск, 44-й проезд Инженерный, д. 9
Date and time of bids evaluation (at the latest):
17.10.2018 15:00
Date and time of announcement of results (at the latest):
19.10.2018 15:00
Georeferencing:
432072, Россия, Ульяновская область, г. Ульяновск, 44-й проезд Инженерный, д. 9
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.