Request for Proposals No. 3489741 
Delivery and installation of hoods, inflows, remote control and NDT Warehouse complex located at: Novosibirsk region, Novosibirsk district, Tolmachevsky village Council.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Delivery and installation of hoods, inflows, remote control and NDT Warehouse complex located at: Novosibirsk region, Novosibirsk district, Tolmachevsky village Council.

OKPD2 category:
Quantity:1 усл.ед.
Total price:Price not specified
Currency:RUB
Contract award criteria:Price incl. VAT (show both prices)
Publication date:
Bid submission deadline:21.11.2023 12:00
Плановая дата подведения итогов
Организатор указал предполагаемую дату подведения итогов. Если в процедуре не будут подведены итоги при наступлении этой даты, то участники могут запросить их самостоятельно
:
21.11.2023
Last edited:14.11.2023 17:17
Organizer (Initiator):OOO "VB DEVELOPMENT"
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Minimum bid increment/decrement
The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal.
:
1% of total amount
Auto-extension
If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
:
10 minutes
Payment terms:advance payment, mostly postpaid
Delivery terms:1. Delivery, unloading and responsible storage at
the construction site of the necessary materials,
equipment, tools, machinery, etc. for the production of CMP.
2. To install ventilation systems according
to the working documentation (Appendix B) and the statement
of work volumes (Appendix A)
3. To carry out the necessary commissioning
(individual tests of equipment, NDT, etc.)
4. Transfer the systems in working condition for
their intended purpose together with the executive documentation
on the relevant acts (documents), including the Customer's
maintenance service
Georeferencing:Novosibirsk region, Novosibirsk, Districts of Novosibirsk,Tolmachevsky village Council
Comments:
1. Installation, fastening and testing of systems should be carried out in accordance with SP 73.13330.2016 "Internal
sanitary and technical systems of buildings".
2. In the process of SMR production, the works are presented to the customer's representatives with the signing of relevant acts (AOSR, Acts on
individual testing of equipment, etc.).
3. All deviations from the project caused by production necessity, prior to the start
of construction and installation work, must be agreed with the customer's representative and the design organization and entered in the journal of author supervision.
4. All works are performed "turnkey" with materials, equipment and equipment of the Contractor in accordance
with the working documentation issued for the production of works. The cost of the work includes the delivery of equipment and materials to the facility, the mobilization
of equipment, the installation of temporary structures, consumables, travel expenses,
obtaining and developing the necessary related documents for the production of works and other costs.
5. Payment for completed works is carried out after:
- presentation of physical volumes;
- provision of a complete set of executive
documentation in accordance with the form agreed with the customer;
- elimination of comments on physics and executive documentation (if any).
6. In the course of work, the contractor is obliged to carry out operational control of the SMR.
7. By the decision of the Customer, part or the full amount of materials listed in the Statement
of Work Volumes may be supplied by the Customer as toll-free material. The obligation, in this case, for input control, acceptance, unloading, transfer
to the place of work, completeness, protection and
safety of material and property, etc., for the performance of work remains with the Contractor.
8. Regularly during the execution of works and after their completion, it is necessary to clean and remove garbage.
9. All construction and installation work should be carried out in strict compliance with all applicable
OT and PB norms and rules.
10. All welding and installation work should be carried out only if there is a signed work permit for
carrying out fire work.
11. Before starting the work, develop and coordinate with the Customer the PPR and the PPRc (in the case
of work using lifting mechanisms.
12. To make grounding of all technological equipment and pipelines
13. Work on power supply and automation of systems will be taken into account in other sections of the working documentation

Work should be carried out in accordance with the requirements:
- SP 07.13130.2013 "Heating ventilation and air conditioning fire safety requirements";
- SP 50.13330.2016 "Thermal protection of buildings";
- SP 60.13330.2016 "Heating ventilation and
air conditioning";
- SP 73.13330.2016 "Internal sanitary and technical
systems of buildings";
- SP 76.13330.2016 "Electrical devices";
- SP 77.13330.2016 "Automation systems";
SP 49.13330.2010 "Labor safety in construction. Part of
1. General requirements"; SP 49.13330.2010 "Labor safety
in construction. Part 1. General requirements";
- SP 112.13330.2011 "Fire safety of buildings and
structures"
- SP 131.13330.2018 "Construction Climatology"
- and others (SP, SNiP, GOST, PUE 7, POTEE, etc.) operating in the territory of the Russian Federation, working documentation issued for the production of works and this Technical Specification; The materials, equipment,
tools used must comply with GOST, technical specifications applicable
in the territory of the Russian Federation, have required certificates and
permissions.
In the course of work, also take into account and
be guided by the recommendations of manufacturers, provided that these requirements do not contradict
the current norms and rules in force on the territory of the Russian Federation.

Access and on-site entrances to the places of work are organized

The point of connection to electricity is provided by the customer. The contractor connects to this point with the installation of an electricity metering unit

The contractor independently provides its needs for
technical and household water supply.

The guarantee for the result of the work performed by the Contractor is 5
years.

The contractor fully assumes all obligations to
comply with the requirements to ensure safe
work, compliance with the requirements of OT, TB and PB,
in accordance with the requirements of Russian legislation
and to carry out the following list of activities in the production of contract work: organizational
measures, technical measures, measures to
provide personal protective equipment. Before
the start of contract work, instruct personnel in
the field of labor protection and fire safety with an entry in
the briefing logs. In the case of high-altitude work
at a distance of less than 2 m from unenclosed
height differences of 1.3 m or more, or top-climbing work above 5 m
, conduct additional targeted briefings with
journal entries. The Contractor is obliged to immediately respond to
all comments from the Customer on violations of the rules from,
TB and PB, and eliminate them immediately. The customer has the right
to stop the contractor's work until
the violations are eliminated. The Customer has the right to impose a fine on the Contractor
for failure to comply with the Customer's requirements, eliminate violations
of the rules of OT, TB and PB.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Total bids: 0