Price monitoring request No. 1295943 
Supply of materials for the repair of the sewage double-filament line of the HFC pressure head collector using the pipe-in-pipe method with the destruction of the existing collector

Supply of materials for the repair of the sewage double-filament line of the HFC pressure head collector using the pipe-in-pipe method with the destruction of the existing collector

Purchasing items:
1. ТРУБА ПЭ80 SDR 21 225Х10.8 ГОСТ 18599 (396 М)
2. ОТВОД ОДНОСЕКЦИОННЫЙ 110301226901 ИСПОЛН=SDR21 УГОЛРАЗВОРПОТОК=90° DНАРУЖ=225ММ ПЭ 100 ПОЛИПЛАСТИК (4 ШТ)
3. Муфта РЕ 100 SDR 17-225 PN10 (8 ШТ)
4. ЗАГЛУШКА SDR11 D225ММ 12ECAL225 DN=225 МАТКОРП=ПОЛИЭТИЛЕН ПЭ 100 4 Н III ЮЖУРАЛПЛАСТ (8 ШТ)
5. ПЕРЕХОД НСПС 225Х219ММ SDR 11 DНАРУЖВХ=225ММ DНАРУЖВЫХ=219ММ МАТКОРП=ПОЛИЭТИЛЕН ПЭ/СТАЛЬ 4 Н III ВОСТОК (4 ШТ)
6. МУФТА MULTI/JOINT 3007 PLUS 709305224 4 Н III GEORG FISCHER (4 ШТ)
7. Мастика МБК-Г-55Г ГОСТ 2889-80 (120 КГ)
8. ПЕСОК КВАРЦЕВЫЙ КЛАСС 1 ГОСТ 8736 (468 000 КГ)
9. ЩЕБЕНЬ ФР.20-40 М1400 ГОСТ 8267 (20,7 М3)
10. БЕТОН М-150 КЛПРОЧН=В12.5 ВОДОНЕПРОН=W2 F50 МАРКУДОБОУКЛ=П3 ГОСТ 26633-2015 (17 М3)
Show more 5 items (purchased total 19 items)
Publication date:
Bids submission deadline
Bids can also be submitted after the expiry of the specified period. However, bidding organizer has the right not to consider the bids submitted after bids submission deadline.
:
19.07.2019 23:59
Last edited:11.07.2019 13:28
Responsible person:Dobrynina Svetlana Viktorovna
Organizer (Initiator):Novovoronezhskaia AES
Additional info
Payment terms:Pre-delivery. The answer provided beyond the specified time limit for the TKP, as well as the conditions that differ from the terms of the planned contract to be purchased, will be recognized as an inadequate TKP, which excludes the possibility of using it when forming the NMC. This procedure for collecting information does not entail any obligations for the Customer.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Documentation provision procedure:Documentation relating to this call for bids is available in e-form free of charge at B2B-Center e-marketplace (www.b2b-center.ru) starting from the date the call for bids is published.
Please note that this Prices Monitoring Request is a procedure aimed at enabling the Organizer to determine the maximum initial contract price for a call for bids to be held afterwards, and imposes no obligations on the Organizer as to entering into a contract.
 
 
 

  Submit a question
Submitted bids
Status: archived.
Total: 1