Per-item bid submission: | Not applicable. Proposal shall cover the entire lot. |
Restriction on submission of a bid higher than previously submitted Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased. : | Yes |
Upload of bid-related documents required Bids not supported with documentation will not be considered. : | Yes |
Minimum bid increment/decrement The Organizer has established a minimum decrement for a Bidder's changing the total lot price from their previously submitted proposal. : | 1% of total amount |
Auto-extension If within the last 10 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 10 minutes from the time the last bid is submitted.
: | 10 minutes |
Payment terms: | post-payment |
Delivery terms: | 7. Scope of work 1. Delivery, unloading and responsible storage on the construction site of the necessary materials, equipment, tools, machinery, etc.
2. Install the internal drainage system according
to the working documentation in Appendix B.
3. To carry out the necessary commissioning (testing, crimping, etc.).
4. To transfer the system in working condition for its intended purpose, together with the executive documentation on the relevant acts (documents), including the Customer's operation service.
8. Source data
provided
by the customer
Appendix A: Statement of work volumes
Appendix B: 66-06-22-RD-VK3
Appendix B: Schedule of work |
Georeferencing: | 620000, Russia, Sverdlovsk region, Yekaterinburg |
Comments: 9. Special requirements 1. Installation, testing and acceptance of water supply and sewerage networks should be conducted in accordance with SP 73.13330 and SP 40-102-2000.
2. After completion of work, pipelines and equipment are flushed and tested for tightness.
3. All deviations from the project caused by production necessity, before the start of construction and installation work, must
be coordinated with the project organization.
4. All work is carried out "turnkey" with materials,
equipment, machinery and Contractor's forces The cost
of work includes delivery of equipment and materials to the facility,
mobilization of equipment, installation of temporary structures,
consumables, travel expenses, obtaining and
developing the necessary related documents for
the work and other costs. During the work and
after the work is completed, it is necessary to clean
the territory and remove garbage.
5. Before starting the work, develop and coordinate
with the Customer the PPR.
6. KP should be issued in the form of a THIEF in Excel format.
10. The list of Work should be carried out in accordance with the requirements of the standards
of regulatory and technical
documents, in
accordance with
the requirements
of which it is necessary
to perform
engineering
surveys.
(JV, SNiP, GOST, PUE 7, POTEE, etc.), operating in the
territory of the Russian Federation, working documentation and this
Technical assignment;
Any changes in the composition and content of the work,
equipment and materials used are
documented in writing.
The materials, equipment, and tools used must
comply with GOST, TU, applicable in the territory of the Russian Federation,
have the necessary certificates and permits. | Venue of bidding: | This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document. |
|