the right to conclude a contract for the execution of construction works on the 2-nd phase of replacement of worn-out thermal pipe insulation of heat networks and equipment for modern high-performance insulating coating branch of...
the right to conclude a contract for the execution of construction works on the 2-nd phase of replacement of worn-out thermal pipe insulation of heat networks and equipment for modern high-performance insulating coating branch of «Rosenergoatom»-Kalininskaya nuclear power plant the execution of construction works on the 2-nd phase of replacement of worn-out thermal pipe insulation of heat networks and equipment for modern high-performance insulating coating branch of «Rosenergoatom»- KalCollapse
Purchasing items:
1.
work on estimates of 02-01-01-02. Rail tanks. (1 ЕР), Price: 1 401 522,17 RUB(price excl. of VAT: 1 187 730,65 RUB) per unit
2.
work on estimates of 02-02-01-02. Fire fighting pipes.
work on estimates 02-05-02-02 (1 ЕР), Price: 166 785,32 RUB(price excl. of VAT: 141 343,49 RUB) per unit
3.
. Pipe network water chiller-condensing and PSV 1st and 2nd boiler room. (1 ЕР), Price: 1 218 411,53 RUB(price excl. of VAT: 1 032 552,14 RUB) per unit
4.
work on estimates of 02-05-03-02. Pipe network water pumps with obvjazkoj 2nd rise. (1 ЕР), Price: 480 963,71 RUB(price excl. of VAT: 407 596,36 RUB) per unit
5.
work on estimates of 02-05-04-02. Water pipeline with obvjazkoj pumps I-th row and lift.
Work 02-06-01-02 estimates (1 ЕР), Price: 825 501,16 RUB(price excl. of VAT: 699 577,25 RUB) per unit
6.
. Pipelines of steam.
work on estimates 02-07-01-02 (1 ЕР), Price: 683 449,36 RUB(price excl. of VAT: 579 194,37 RUB) per unit
7.
. Drinking water pipelines. (1 ЕР), Price: 69 048,77 RUB(price excl. of VAT: 58 515,91 RUB) per unit
8.
work on estimates of 02-08-01-02. Cut-in 12um41 (42) s01 to LBK to tie-in in 12um41 (42) s03 Dу 150.
work on estimates (1 ЕР), Price: 2 872 627,23 RUB(price excl. of VAT: 2 434 429,86 RUB) per unit
9.
02-08-02-02. Cut-in 12um41 (42) s03 Dу 150 before entering the building, the MOH 2 block and LBK.
work on estimates (1 ЕР), Price: 1 068 382,28 RUB(price excl. of VAT: 905 408,71 RUB) per unit
10.
02-08-03-02. Heating system on the BRT from tie-in in 12um71 (72) s01. (1 ЕР), Price: 726 455,15 RUB(price excl. of VAT: 615 639,96 RUB) per unit
1. The contract price;
2. qualification of the party;
2.1. Experience party procurement procedures.
Possibility of holding a rebidding:
Yes
Contract conclusion date:
20.07.2018
Документация по лоту:
Not uploaded
Payment terms:
, in accordance with the "draft Treaty" Part 3 of volume 1 of the competitive documentation
Delivery terms:
in accordance with the draft Treaty part 3 of volume 1 of the competitive documentation
Date and time of bids evaluation:
20.06.2018 23:59
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Bid documentation provision procedure:
Bid documentation in electronic form is available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date a call for bids is published.
Bid security
Security amount:
Tender security is required in the amount of 882197.00 rubles
Currency:
RUB
Security form:
Monetary funds, Irrevocable bank guarantee
Contract performance security
Security amount:
Требуется обеспечение исполнения договора в размере 5.00 %. Срок предоставления до заключения договора либо после заключения договора, в срок не позднее 15 дней с даты его заключения
Security form:
Monetary funds, Irrevocable bank guarantee, Surety or independent guarantee
Suspension date: 14.05.2018 at 17:28 Comments: The procedure was suspended due to the acceptance of the participant's complaint for consideration.
Complaint registration number: 7491
Receipt date: 11.05.2018
Maximum consideration period: 25.05.2018 Decision justification files: