The right to conclude a contract for the execution of a complex of works "turnkey" (including: Preparation of initial and permissive documentation, design and working documentation, construction and installation, electrical installation and...
The right to conclude a contract for the execution of a complex of works "turnkey" (including: Preparation of initial and permissive documentation, design and working documentation, construction and installation, electrical installation and commissioning, equipment supply) on the objects of technological connection of the branch of PJSC "Mrsk of the South"-" Rostenergo ": 1. "Construction of the 0.4 kv HF from ВL 0.4 kv № 1 KPV № 426 VL 10 kv № 1109 PS 110 kv AS11 for power supply lying 0.4 kv residential building Krasnova v. P. on the street. Mira, 59 in X. Cheerful Aksai District of Rostov region (approximate length of transmission line 0.180 km) "; 2. "Construction of KPN 10/0.4 kv, вl 10 kv, вl 0.4 kv from VL 10 kv № 1406 PS 35 kv AS14 for power supply lying 0.4 kv residential buildings on the site № 5 (section 1) in the Dawn Aksai district of Rostov region (approximate power transformer 0.160 MVA, Approximate length of transmission line 0.816 km) "; 3. "Construction of the 0.4 kv HF from ВL 0.4 kv № 1 кп № 148, 6 kv № 802 PS 35 KV 8 for power supply lying 0.23 kv of the dwelling house of Maschichev v. V. On the plot with KN 61:02:500601:118 in P. experienced Aksai District of the Rostov region (indicative length transmission line 0.162 km) "; 4. "Construction of the 0.4 kv HF from the VL 0.4 kv № 1 KPV № 737 VL 10 KV № 105 PS 110 kv AS1 for power supply lying 0.4 kv residential building Tolstykova E. O. On the street. Krasnoarroskaya, 235/2 in the St. Olginskaya Aksai District of the Rostov region (indicative length transmission line 0.225 km)"Collapse
Procurement method (according to the procurement regulations):
Процедура проводится с соблюдением требований статей 3.2 - 3.3 223-ФЗ
:
Yes
Per-item bid submission:
Not applicable. Proposal shall cover the entire lot.
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Supplier should not be recorded in the register of mala fide suppliers
The Organizer has set a requirement as to the supplier's not being recorded in the register of mala fide suppliers. Supplier's compliance with this requirement shall be checked by the Organizer on their own.
:
Yes
Payment terms:
specified in section 9 of the procurement documentation
Delivery terms:
listed in section 9 of the procurement documentation
Venue of bids examination:
Россия, Ростовская область, 344002, г. Ростов-на-Дону, ул. Большая Садовая, 49.
Date and time of bids consideration:
27.03.2019 10:00
Results date and time:
11.04.2019 16:00
Georeferencing:
Россия, Ростовская область
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Procurement documents provision procedure:
Procurement documents in electronic form are available free of charge at B2B-Center marketplace (www.b2b-center.ru) starting from the date of publication of the procurement procedure.