when transporting only used 40 ft High Cube containers, and container load amounts to 26.5 tonnes. Be sure to provide costing calculation rates.
Departure station-Kojty (284101)
Load paper, not named in the alphabet (ETSNG: 132178)
As...
when transporting only used 40 ft High Cube containers, and container load amounts to 26.5 tonnes. Be sure to provide costing calculation rates.
Departure station-Kojty (284101)
Load paper, not named in the alphabet (ETSNG: 132178)
As mandatory additional service requirements to the prospective service provider, you can select:
• The daily provision of information on planned and delivered containers to the client;
• Timely podsyl (for 5 days) empty containers in the composition;
• Timely delivery (for 10 days) instructions PG-12 and railway waybills;
• As compliance containers referred to in terms of delivery to this request transport of paper products in 40 ft. HQ containers/station to the warehouse of consignee.Collapse
Bidders can submit their proposals for certain lots of the call for bids, but necessarily for all the items within a selected lot
:
Not applicable. Proposal shall cover all the items of the selected lots
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Procurement documentation:
Not uploaded
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:
14 days from date of invoice. An invoice upon delivery of the container at your destination.
Delivery terms:
1. The container must be no visible damage (cross-cutting holes, cracks)
2. Working doors, door bolts
3. The concavity or vygnutost walls, roofs of not more than 50 mm, provided that the defect does not affect the safety of the cargo (the fact of a defect record before loading to absolve themselves of responsibility for the deformation of the container)
4. presence of sealing gum and lashing (remov)
5. the lack of chemical, oil stains
6. Paul without protruding bolts-flat
The container can be loaded after repair
In cases if:
a) at the time of loading visible damage not visible, but to guarantee the quality of repairs we can not.
b) not factory remy does not guarantee that the load created by the fastening during transportation will withstand load and REM did not come off, so the shipping container will be, but in the case of a complaint that comes will forward the claim to the carrier
c) the container, which had been subjected to repair, namely, installation of patches (patch must be provarena and colored paint) on the roof and walls of the container, replacing parts of the floor in a container does not guarantee 100% safety of the cargo, so the shipping container will but in the case of complaints will come forward claim the organization supervising the repair
d) corrosion should be processed (Primer), just in case the container is loaded
e) rime frost and does not exceed 1 cm
Comments: , please include the presentation of your company and map partner.
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.