Request for Proposals No. 1103933 
Design and installation of heat metering stations at LLC PREO

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Design and installation of heat metering stations at LLC PREO

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:02.11.2018 11:00
Last edited:18.10.2018 09:18
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Upon the work performed.
Delivery terms:1. Request of OAO ENP-NEP, Novocherkassk
11. Requirements for metering stations.
11.1. The technical assignment provides for the design and installation of a heat metering catch at PREO LLC
- Administrative building (letter A)
- household housing (letter F)
- garage (letter D, D, E)
- warehouse (letter B, C)
- store building (owned by OAO EPM-NEZ)
Technical specifications are attached.
Technical passport is attached.
2.2. The metering station should provide measurement and registration of heat energy consumed by the building (buildings), including heating, in accordance with the "Rules for heat and heat carrier metering".
2.3. Technical means of accounting for heat energy, coolant (hereinafter - TC) should be included in the State Register of Measuring Instruments, have the knowledge of the Federal Agency for Metrology.
2.4. TS should provide reliable measurements, determination and indication of current values ​​of flow, temperature, pressure, thermal energy, time (in the amount defined by the Gosstandart certificates for measuring instruments) and archiving of measurement and calculation results.
2.5. TC should ensure uninterrupted operation, including measurement of the parameters of the coolant and the calculation of the consumed thermal energy and coolant in the following modes of operation of the heating system and heat:
- normal normal mode;
2.6. Flowmeter primary transducers must have acceptable hydraulic losses.
2.7. When installing the metering vehicle in the existing heating systems, the minimum amount of changes in the building heat supply system associated with the installation of the vehicle should be provided.
2.8. Dismantling of the vehicle for verification should be carried out without dismantling the cables connected to these technical means.
2.9. The calibration interval of the heat meter must be at least 4 years.
2.10. The average time between failures of a heat meter should be at least 20,000 hours.
2.11. The service life of the heat meter must be at least 12 years.

3. Data to determine the cost of work.
3.1. The scope of work to be determined, according to the developed and agreed project documentation.
3.2. Work is performed from the material of the contracting organization.

4. Requirements for the Contractor.
4.1. To clarify the conditions of work, familiarization with the object must be the arrival of representatives of the Contractor to the customer.
4.2 The contractor in his commercial proposal specifies the procedure for payment for work and other conditions.
4.3 Attestation of the head, ITR and executors on industrial safety and labor protection on HIF. According to the application №1.
4.4 Ensuring occupational safety and health measures for safe work practices at the facility.
4.5. At the end of the project work to submit projects for approval to the customer.
4.6. Upon completion of installation work, conduct a hydraulic test of the system.
4.7.At the end of the installation work provide the customer with the technical documentation.

5. Conditions of work
5.1. Installation and commissioning work on the installation of metering stations and data transmission systems is carried out in the volume stipulated by the projects of metering stations.
5.2. The customer controls the production and execution of works on objects.
5.3 Coordination with all related services is carried out by the contractor.
5.4. The acceptance of the metering stations and their simultaneous transfer to the customer’s balance shall be carried out by a commission consisting of representatives: Customer, Contractor.

6. Terms of performance of work.
Start of work - November 2018
Completion of works - December 2018

7. Terms of payment.
7.1. In fact completed work.

8. General requirements.
8.1. Specify the cost of work on objects. The total cost of the lot.
8.2. The technical task is accompanied by a list of documents required for the execution of work orders - tolerances at the enterprise listed in Appendix No. 1.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for receipt of applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if they were).
2. Certificate of state registration.
3. Certificate of tax registration.
4. Certificate of Incorporation.
5. The balance sheet as of the last reporting date with a mark of acceptance by the tax authority.
6. Documents confirming the authority of the representative to sign the documents:
- Decision (Protocol).
- Power of Attorney.
7. Proposal for the execution of works (see the file "Proposal for the execution of works")
8. The contact person: Vorotyntsev Alexander Nikolaevich, tel. 8 (8635) 29-43-94, e-mail: AVorotyncev@energoprom.ru
9. Certificate of Compliance with ISO 9001: 2008 (if available)
This request is not a notice of tender or auction and does not give any rights to the participants, does not entail the occurrence of any obligations, except those expressly indicated in the notification.
10. Requirements for the performer:
- Permitting documents (SRO, licenses, tolerances).
- Development by the performer PPR, PPRC, RTI.
- Presence of certification of the head, ITR, workers on industrial safety on OPO.
- The presence of medical access for personnel to work on HIF.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 02.11.2018 at 14:09
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 0