Request for Proposals No. 2586560 
Design of heating equipment for pitch impregnation section with vertical autoclaves TsPOiP with high-temperature organic heat carrier.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Design of heating equipment for pitch impregnation section with vertical autoclaves TsPOiP with high-temperature organic heat carrier.
See terms of reference and related documentation (Complex service)

OKPD2 category:
41.10.10.000  Документация проектная для строительства
71  Услуги в области архитектуры и инженерно-технического проектирования, технических испытаний, исследований и анализа
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:05.03.2021 17:00
Last edited:20.02.2021 08:56
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:In the commercial offer
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk

2. Purpose of work:
2.1. To carry out a project for the transfer of the existing technological equipment of vertical pitch impregnation of the Central Industrial and Industrial Complex from steam heating to heating with a high-temperature organic coolant.
2.2. Optimize the existing technological scheme.
2.3. Develop a system for digital control and equipment management that reduces existing technological risks.

3. Project Description
3.1. The pitch impregnation unit with vertical autoclaves TsPOiP is intended for the technological operation of impregnating electrode blanks with coal tar pitch GOST 10200-83 and is carried out to give the electrodes and nipples the required operational properties.
3.2. Coal tar pitch in liquid form is used as a binder and impregnating raw material in EPM-NEZ JSC (see Table 1).
3.3. The current technological scheme of the pitch impregnation section with vertical autoclaves has equipment with steam heating from steam pipelines from the central boiler house. The impregnating pitch is supplied to the site from the baking warehouse No. 3.
3.4. Based on the design results, the following results should be obtained:
- the use of steam heating should be completely excluded;
- The technological scheme of the pitch impregnation plant with vertical autoclaves should be changed in order to reduce the costs of heating equipment using modern valves and control systems.
- work on changing the existing technological scheme should be divided into several logically justified stages, allowing to minimize the time of inevitable equipment downtime;
- a system of technological control and management should be developed to ensure the reduction of the role of the human factor and the elimination of existing technological risks.

4. Technological process.
4.1. When performing the impregnation operation, the following movements of the electrode and nipple workpieces are sequentially carried out:
- transportation of blanks from the previous processing;
- storage of blanks at the pitch impregnation site;
- rolling blanks on racks for visual inspection of blanks, removing dust from their surface and presenting them to the shift foreman;
- loading of blanks into a container for heating, forming packages of blanks for loading with chain slings;
- loading prepared containers or packages into a heating well;
- preparation of the autoclave for handling blanks;
- reloading containers or packages from a heating well to an autoclave;
- impregnation of workpieces in an autoclave;
- cooling of workpieces in an autoclave;
- unloading of blanks from the autoclave;
- unloading of blanks from containers and packages;
- formation of packs and storage of blanks;
- transportation of blanks for subsequent processing.

5. The composition of the equipment used.
5.1. A graphic representation of the transport and technological scheme of impregnation is shown in drawing No. TK 010.06747.

During the design, it is necessary to perform a calculation and propose (the existing technological scheme for TC 010.06747):
- Heating of the process flow diagram of the pitch impregnation section with vertical autoclaves provides for the installation of a TEE-150 type thermal oil heater and ENTY circulation pumping units. Presumably the location is in the existing gas cleaning room.
- the design of heating pipelines using BOT, and the method of their installation instead of existing ones using steam heating. Baking pipes are designed to transport raw materials inside the site and supply them to production A separate section of the pitch pipe is a "pipe-in-pipe" design, the inner pipe diameter is Dy100, the outer diameter is Dy157. The sections of the piping must be welded into a single structure that ensures the tightness of the raw material cavity.
- Logically connected fragments of the technological network of pitch pipelines should be heated by their own heating circuit, which has all the elements necessary for its maintenance: supply, outlet, emergency drain, air and blowdown devices.
In order to supply the required thermal power, new pipelines (without taking into account the existing ones) for the supply, outlets and emergency drainage of the coolant must be laid. For a safe emergency salvo drainage of the hot coolant, it is necessary to install a single emergency drain tank with support devices that can accommodate the entire volume of the heating network coolant.
- provide for automatic maintenance of the temperature of raw materials in the baking pipes at 150 ° С;
- pitch cranes are designed to assemble technological schemes for pumping raw materials, as well as to implement blocking algorithms and security systems.
At present, the site uses manual-operated Pitch cranes of various manufacturers Dу100 with steam heating.
During the design, electric-driven pitch cranes should be assigned (to study the possibility of installing manually-operated pitch cranes) with position control. The control and management scheme for pitch cranes should be integrated into the process control system.

6. Requirements for the process control system.
6.1 The system should be based on Siemens controllers.
6.2 All equipment must be of industrial design, with IP67 or placed in industrial cabinets with IP67. Control cabinets must be equipped with a cooling system. Equipment and sensors should be easily accessible for replacement and maintenance.
6.3 All software must be licensed and have the latest current version (ex. Windows 10).
6.4 The system should display all technical parameters (motor currents, temperatures, revolutions, positions, etc.) and the states of all sensors (discrete, analog).
6.5 The system should be able to connect to it via the factory network and transfer data via OPC.
6.6 The system must have archives of measurement data in CSV format and provide storage of archives for a period of at least 3 years.

7. Terms of work.
The terms of the work performance are negotiated by the Parties additionally when concluding the contract.


8. Acceptance.
The design work is considered completed in full after the Parties have signed the Act on the acceptance of design documentation.
• The contractor presents the completed project in three copies on paper and one in CAD format (for drawings) and DOC (for documentation) on electronic media.

9. Requirements for the Contractor
9.1. The contractor must have the necessary production and human resources to carry out this work, be a member of a self-regulatory organization (SRO).
9.2. To clarify the conditions for the performance of work, familiarization with the object, the arrival of the Contractor's representatives to the Customer is mandatory.
9.3 The Contractor in his commercial offer indicates the procedure for payment for work and other conditions.

10. Tables and illustrations
Table 1. Basic properties of liquid coal tar pitch
Name of properties Unit rev. Value
Pitch grade according to GOST 10200-83 A and B
Softening point ° С 65-76
Density kg / m3 1200-1300
Heat capacity (at 25-70 ° С) j / kg ° К 1512
Heat capacity (at 220 ° С) j / kg ° К 1780
Viscosity cps 400
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
The participant who took part in the procedure (made an offer), before the deadline for accepting applications, must upload the following documents to the system:
1. Charter (with all additions and changes, if any).
2. Certificate of state registration.
3. Tax registration certificate.
4. Extract from the Unified State Register of Legal Entities.
5. Balance sheet as of the last reporting date with the tax authority's mark of acceptance.
6. Documents confirming the authority of the representative to sign documents:
- Decision (Protocol).
- Power of attorney.
7. Work proposal (see the file "Work proposal")
8. Contact faces:
Investment Projects Director - Maxim Mikhailovich Naprasnik
Tel. 8 (8635) 29-48 36 mnaprasnik@energoprom.ru
Ved. construction supervision engineer - Oleg Vyacheslavovich Veliky
Tel. 8 (8635) 29-43-98 OVelikiy@energoprom.ru
9. Certificate of Compliance with ISO 9001: 2008 (if applicable)
This request is not a notice of a tender or auction and does not give any rights to the participants, does not entail the emergence of any obligations other than those expressly indicated in the notice.
10. Requirements for the performer:
- Permitting documents (SRO, licenses, permits).
- Development by the contractor of PPR, PPRK, RTI.
- Availability of attestation of the head, engineering technician, industrial safety workers at HIF.
- Availability of medical clearance of personnel to work at HIF.
—Before issuing a work permit for work, the Contractor is obliged to provide the Customer with the following documents: copies of documents confirming the availability of a labor protection service and / or a labor protection specialist in the contractor (order for appointment to a position in the contractor, certificate of a labor protection specialist) or the existence of an agreement with an accredited organization in the field of labor protection services.
To consider the application, it is MANDATORY to provide a commercial proposal.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 27.04.2021 at 09:39
and declared the call for bids void.
Notifications have been sent to bidders.
Total bids: 2. More >>