Request for Proposals No. 1282972 
Design, purchase and installation of an air conditioning system for the premises of the TsMOEP nipple area.

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Design, purchase and installation of an air conditioning system for the premises of the TsMOEP nipple area.
See terms of reference and related documentation

OKPD2 category:
Quantity:1 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:10.07.2019 17:56 (was extended by 56 min, 51 sec)
Last edited:24.06.2019 16:11
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:Payment shall be made fractionally, after the actual performance of work within the agreed time frame.
Payment is made by bank transfer, by transferring money to the account of the Contractor.
It is possible to provide an advance for the purchase of equipment (by agreement).
The contractor provides the customer with a guarantee of 12 months for the equipment and work performed from the moment of commissioning.
Delivery terms:1. Application of JSC "EPM-NEZ", Novocherkassk
9. Purpose of work:
Ensuring the temperature in the spring-summer period in the range of 20 - 250 C in the room nipple site TsMOEP.
10. Initial data:
10.1. The premises of the nipple center site is located in the axes of the D-K; 1-17, at mark 0,000 in the operating workshop of CMOEP.
10.2. Overall dimensions of the room:
- Length - 96 m;
- Width - 24 m;
- Height - 13.5 m.
3.2.1. The plan of the building with the indication of the axes in Appendix No. 2 Heck. TX 13354.
3.3. Dust level in the nipple area is min.-0.16, max-2.5, sr-0.64 mg per cubic meter. Graphite dust.
3.4. The windows on the east side of the room, the roof is flat (with a lantern).
3.5.The mode of operation of the equipment area - continuous.
4. Scope of work
4.1. Design.
4.2. Supply of equipment.
4.3. Installation with equipment.
5. Requirements to the Contractor.
5.1. To get acquainted with the object of design, the arrival of representatives of the Contractor to the Customer is required.
5.2. Certification of the head, ITR and executors on industrial safety and labor protection on HEP according to the Appendix 1.
5.3. Ensuring occupational safety and health measures for safe work practices at the facility.
5.4. In the case of justified comments to the staff on the quality of work performed, violation of safety regulations, as well as violations of an administrative nature, at the request of the Customer’s specialists, the Contractor is obliged to immediately replace these employees.
5.5. Works that were not performed with high quality should be redone at the expense of the Contractor and handed over to the Customer.
5.6. Accommodation in the sanitary facilities of workers employed to perform this work is done by the Contractor. The customer, if possible, can arrange the placement of workers on a contractual basis.
5.7. The contractor must develop and agree with the customer estimates, a linear schedule of work, ERP, CPD and routing for all necessary work - within 15 calendar days after the winner announces the competitive procedure.
5.8. Provide for the design of equipment:
- minimal impact of air conditioning noise on the process personnel to a comfortable level.
- ensuring the temperature regime in the spring-summer period in the range of 20 - 250 C in the nipple section of the CMOEP.
6. Terms of work
6.1. Work in the existing shop TsMOEP.
6.2. Equipment, materials, tools for the work is provided by the Contractor.
6.3. Lifting mechanisms for loading and unloading operations, motor transport provides the Contractor.
6.4. Electric welding and gas-cutting equipment is provided by the Contractor.
6.5. Expendable materials for electric welding and gas-cutting equipment are provided by the Contractor.
6.6. Cars for removal of garbage, scrap metal or other waste are provided by the Customer.
7. Place of work:
The territory of the Customer and the Contractor.
8. Terms of performance of work:
Design - 1 month since the conclusion of the contract.
Purchase and installation - 2 months.
9. Terms of payment and guarantees:
9.1. Payment is made fractionally, after the actual performance of work in the agreed time frame.
9.2. Payment is made by bank transfer, by transferring money to the account of the Contractor.
9.3. It is possible to provide an advance for the purchase of equipment (by agreement).
9.4. The contractor provides the customer with a guarantee of 12 months for the equipment and work performed from the moment of commissioning.
10. General requirements:
10.1. Before the tender, the contractor provides:
10.1.1 - certificate of admission to a particular type of work that affect the safety of capital construction objects
10.1.2. A list of documents required for
registrations of dresses - allowances at the enterprise.
Georeferencing:346413, Russia, Rostov region, Novocherkassk, Aluminum platform
Comments:
Participant who has submitted a bid before bids submission deadline shall upload the following documents:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for the execution of works (see the file "Proposal for the execution of works")
8. Contact person: Chesnokov Alexey Leonidovich. Lead Environmental Protection Engineer for Environmental Management, telephone 8 86352-94530, email addresses of responsible persons, AChesnokov@Energoprom.ru 9. Certificate of conformity to requirements of ISO 9001: 2008 (if available)
This request does not constitute a notification of tender or auction and shall not grant any rights to the participants and shall not entail any obligations except those explicitly stated in the announcement.
10. Requirements for the performer:
- Permits (SROs, licenses, approvals).
- Developed by the Executive PPR, PPRC, RTI.
- Presence of certification of the head, ITR, workers on industrial safety on OPO.
- Presence of medical access for personnel to work on HIF.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
E-signature info:Signed with e-signature

This call for bids is archived