Communicating terminal clamps, SAF series, ZCBC02GR code
End insulator code ZCB061GR
DIN-rail, code 02135
"Coupling the double lock for metal hose
steel braided and put into a box, TO6014-32A Code "
Metal hose-coupling conduit with an...
Communicating terminal clamps, SAF series, ZCBC02GR code
End insulator code ZCB061GR
DIN-rail, code 02135
"Coupling the double lock for metal hose
steel braided and put into a box, TO6014-32A Code "
Metal hose-coupling conduit with an external thread, Dy = 20 mm, M25h1,5, 6014-25A code
Metal hose-coupling conduit with an external thread, Dy = 20 mm, M25h1,5, 6014-25A code
Pipe flexible gofrrirovannaya propagating combustion of polyamide 50 mm (80050)
Coupling releasable clamp for pipes with a diameter of 50mm (017,050) Wiring accessoriesCollapse
OKPD2 category:
27.90.70.000 Устройства электрической сигнализации, электрооборудование для обеспечения безопасности или управления движением на железных дорогах, трамвайных путях, автомобильных дорогах, внутренних водных путях, площадках для парковки, в портовых сооружениях или на аэродромах
Bidders can submit a bid for separate items within the call for bids
:
Applicable
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Ranking of bids
In the course of bidding, a price-based rank (position) shall be assigned to a quotation.
Assignment of the 1st rank (position) to a bid does not imply the bidder's winning, but enhances the bid's preferability for the Buyer when selecting the winner, all other factors being equal.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
In calls for bids with bids ranking, bid submission deadline will automatically be extended in the same manner if the rank of a bidder changes.
:
30 minutes
Payment terms:
Payments under this contract is carried out on the basis of issued invoices of suppliers by means of transfer of funds to the account of the Supplier not later than thirty (30) calendar days after signing by the parties without comment consignment note (p. TORG-12) or UPD, as well as providing the original stamped and signed delivery agreement of the Parties
Delivery terms:
A warehouse in Novouralsk Sverdlovsk Region Shevchenko Street 16
Georeferencing:
Sverdlovsk region, Novouralsk
Venue of bidding:
This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.