Request for Proposals No. 1451643 
Carrying out capital repair of electric bridge cranes of JSC "EPM-NEZ"

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available

Carrying out capital repair of electric bridge cranes of JSC "EPM-NEZ"
For each crane to provide a separate commercial offer, in the rest - see the terms of reference and related documentation

OKPD2 category:
Quantity:5 шт.
Total price:Price not specified
Currency:RUB
Contract award criteria:price excl. of VAT (show both prices)
Publication date:
Bid submission deadline:06.03.2020 17:00
Last edited:04.03.2020 14:16
Organizer (Initiator):El 6 Novocherkassk
Additional info
Per-item bid submission:Not applicable. Proposal shall cover the entire lot.
Restriction on submission of a bid higher than previously submitted
Bidding initiator has set a restriction on submission of a bid with a price which is higher than the price of the previous bid submitted by the bidder. Once the bid is submitted, the stated price can not be increased.
:
Yes
Upload of bid-related documents required
Bids not supported with documentation will not be considered.
:
Yes
Auto-extension
If within the last 30 minutes of bid submission period a new bid is submitted, then bid submission deadline will automatically be extended by 30 minutes from the time the last bid is submitted.
:
30 minutes
Payment terms:within 30 calendar days after signing of certificates of acceptance of performed works
Delivery terms:1. General information about JSC EPM-Novocherkassk Electrode Plant"
1.1. Organizational and legal form: Joint Stock Company
1.2. Legal address: 346400, Russian Federation, Rostov region,
city Novocherkassk, Aluminum platform.
1.3. Actual address: 346400, Russian Federation, Rostov region, city Novocherkassk, Aluminium platform.
1.4. Bank details: INN 6150003065
1.5. OKVED code 26.82.4 Production of artificial graphite.
1.6. Full name, position of head: Evgeniy Churikov - Manager
Director.
1.7. Name, position, telephone, fax of the official responsible for the technical condition of the equipment: Ulko Igor Viktorovich — Technical Director, Tel. 8 (8635) 29-48-11, fax 8 (8635) 29-48-23.
1.8. Name, position, telephone, fax of the official responsible for the implementation of the project: Martyshchenko Oleg Mikhailovich - Chief Mechanic. Tel. 8 (8635) 29-48-24, fax 8 (8635) 29-42-55, e-mail: OMartischenko@energoprom.ru
2. Place of work:
The territory of the Contractor and JSC "EPM-NEZ" (CGE). 3. Content of the works:
3.1 Overhaul of electric bridge cranes
according to the developed design documentation from the material of the Contractor:
• CGE section 1 shop №2 reg. №19087/P Inv. №1303
• CGE section 1 shop №1 reg. №988/P Inv. №1304
• CGE section 1 shop №3 reg. №44889/P Inv. №1320
• CGE section 8 shop №10 reg. №22485/P Inv. №1274
• CGE section 8 shop №14 reg. №5107/P Inv. №1194
4. Brief technical description: Electric bridge cranes of special purpose. Designed for lifting and transportation operations and cargo movement.
5. The purpose of the work: Restoration of operating characteristics of cranes for their further operation.
6. Requirement to the performer:
• The contractor must have the necessary production and human resources to carry out the work
• Production of works under possible influence of harmful production factors: dust, gas pollution, noise
• Production of works in tight conditions of the operating enterprise (shop),
operating mode of the enterprise round-the-clock
• The Contractor shall provide the following documents to the Customer prior to the issuance of the Work Permit:
- copy of the certificate (SRO) for the right to perform this type of work; - copies of documents confirming the presence in the contractor organization of labor protection service and/or occupational safety specialist (order on appointment to a position in a contracting organization, certificate of occupational safety specialist) or the presence of an agreement with an accredited organization in the field of provision of labor protection services;
- copy of the instruction on labor protection from the briefing journal;
- ERP or RDP or RTI; $
- copy of the report of certification of workers on labor protection;
- copies of certificates of certification of technical and technical personnel on labor protection and on general requirements of industrial safety. When performing works on gas, on pressure vessels, using GPM, in electrical installations, carrying out fire works - copies of certificates for each type of work;
- medical admission of personnel; $
- copies of certificates of gas-electric welders, slingers, drivers of cranes, lifts (towers). For gas-electric welders copies of certification protocols for PTM.
In case of discrepancies of information in the submitted documents to the requirements of regulatory and legal acts, the Customer has the right to initiate audit by the Health and Safety Service in matters of Occupational Safety and Health and Safety. Industrial safety in the Contractor's organization. The Contractor shall notify the Customer in writing of all these conditions and shall be accompanied by all supporting documents. Failure to comply with the provisions of this clause by the Contractor entitles the Customer to prevent the Contractor from performing the works, in which case the delay in performance of the works is the fault of the Contractor.
7. Terms of execution of works:
Agreed with the Customer.
8. Payment terms: Payment within 30 calendar days after signing of certificates of acceptance of performed works.
9. Attached documentation:
Design documentation.
Georeferencing:Russia, Rostov region,
Comments:
The participant who took part in the procedure (who made an offer) must upload the following documents to the system before the deadline for accepting applications:
1. Articles of Association (with all the amendments, if any).
2. Certificate of the state registration.
3. Certificate of tax registration.
4. Extract from USRLE.
5. Balance sheet as of the last reporting date with tax authority stamp of acceptance.
6. Documents confirming the powers of the person authorized to sign the documents:
— Decision (Protocol).
— Power of attorney.
7. Proposal for work (see file "Proposal for work") 8.$ Contact person: Marty shchenko Oleg Mikhailovich — chief mechanic, phone 8 86352-9-48-24 e-mail: Мartischenko@energoprom.ru, $
9. Certificate of compliance with the requirements of ISO 9001: 2008 (if any) This request does not constitute a notice of the holding of a competition or auction and does not give any rights to the participants, does not entail any obligations other than those expressly stated in the notification.
10. Requirements for the performer:
The Contractor shall provide the following documents to the Customer prior to the issuance of the Work Permit:
- copy of the certificate (SRO) for the right to perform this type of work;
- copies of documents confirming the presence in the contractor organization of labor protection service and/or occupational safety specialist (order on appointment to a position in the contractor organization, certificate specialist of labor protection) or the existence of an agreement with an accredited organization in the field of labor protection services;
- copy of the instruction on labor protection from the briefing journal;
- ERP or RDP or RTI; $
- copy of the report of certification of workers on labor protection;
- copies of certificates of certification of technical and technical personnel on labor protection and on general requirements of industrial safety. When performing works on gas, on pressure vessels, using GPM, in electrical installations, carrying out fire works - copies of certificates for each type of work;
- medical admission of personnel - copies of certificates of gas-electric welders, slingers, drivers of cranes, lifts (towers). For gas-electric welders copies of certification protocols for PTM.
In case of discrepancies of information in the submitted documents to the requirements of regulatory and legal acts, the Customer has the right to initiate audit by the Health and Safety Service in matters of Occupational Safety and Health and Safety. Industrial safety in the Contractor's organization.
The Contractor shall notify the Customer in writing of all these conditions and shall be accompanied by all supporting documents. Failure to comply with the provisions of this clause by the Contractor entitles the Customer to prevent the Contractor from performing the works, in which case the delay in performance of the works is the fault of the Contractor.
Venue of bidding:This call for bids is held in electronic form on the e-marketplace of B2B-Center group (www.b2b-center.ru). Bids shall be submitted in the form of e-document.
Контактное лицо:
E-signature info:Signed with e-signature

This call for bids is archived
Participation in bidding is no longer possible. You may wish to check similar calls for bids currently available
  Submit a question
Latest submitted bids
Status of bidding: archived.
Organizer's decision:
The Organizer has announced the results on 17.03.2020 at 14:34
and declared the call for bids void.
Обоснование: Принято решение провести процедуру повторно
Notifications have been sent to bidders.
Total bids: 1. More >>